vault backup: 2025-10-23 10:52:59
This commit is contained in:
@@ -0,0 +1,39 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- destiny/permanent
|
||||
- occupational/systems/fixtures
|
||||
- status/draft
|
||||
- type/guide
|
||||
title: Fixtures
|
||||
---
|
||||
# Fixtures
|
||||
|
||||
This system is only for luminaires and their immediate branch wiring.
|
||||
See also [[lighting-controls]] and [[electrical]].
|
||||
|
||||
## Info
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Preparation
|
||||
|
||||
1. Read about the project specifications and construction type
|
||||
2. In drawings, locate:
|
||||
* Fixture Schedule
|
||||
* Reflected Ceiling Plans
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
See [[fixture-designations]].
|
||||
|
||||
1. Takeoff floor plans in order
|
||||
2. Takeoff enlarged drawings
|
||||
|
||||
### 3. Review
|
||||
|
||||
1. Garage Homeruns
|
||||
2. Luminaire in Amenity Areas
|
||||
3. Ensure appropriate breakdowns
|
||||
* Site lighting in System "FML - Site Fixtures Material & Labor"
|
||||
Reference in New Issue
Block a user