id:
|
||||
aliases: []
|
||||
tags:
|
||||
- destiny/permanent
|
||||
- occupational/systems/lightning-protection
|
||||
- status/draft
|
||||
- type/guide
|
||||
title: Lightning Protection
|
||||
---
|
||||
# Lightning Protection
|
||||
|
||||
## Info
|
||||
|
||||
### Early Streamer Emission (ESE)
|
||||
|
||||
## Estimate Scope
|
||||
|
||||
May or may not be included, see proposal on [[bpm|BPM]]
|
||||
|
||||
### Subcontractors
|
||||
|
||||
Find lightning protection subcontractor quotes on BPM
|
||||
|
||||
> [!tip]
|
||||
> While you have them open, put the quote costs in Accubid.
|
||||
|
||||
Search the quotes for direction on downlead counts, total length, and conduit size
|
||||
|
||||
> [!example]
|
||||
> Contractor to furnish 1,980' of 1" PVC conduit and pull string
|
||||
|
||||
If no quote is available:
|
||||
|
||||
* **Downlead locations** = building corners + additional locations
|
||||
such that downlead spacing is not greater than 100ft
|
||||
* Minimum 10 locations for High Rise
|
||||
|
||||
* **Total downlead conduit length** = building height * downlead locations
|
||||
|
||||
* **Conduit size** = 1-1/4"
|
||||
|
||||
### Takeoff
|
||||
|
||||
```
|
||||
Area = "Lightning Protection" // confirm
|
||||
Phase = "Building - BOH, Storage & Common"
|
||||
System = "LPT - Lightning Protection"
|
||||
BidItem = "3 - Building"
|
||||
```
|
||||
|
||||
* Takeoff: `COMMON ASSEMBLIES`/`PDI EMPTY CONDUIT`/`PVC ASSEMBLIES`/`* CONDUIT - PVC40`
|
||||
* **Length** = total downlead conduit length
|
||||
* **Count** = downlead locations
|
||||
|
||||
* Add item: `ITEM DATABASE`/`BOXES & CABINETS`/`JUNCTION BOXES AND INDUSTRIAL CABINETS`/
|
||||
`BOXES - HNGD CVR - PAINTED STEEL - NEMA 1`/` 6x 4x 4" BOX HNGD CVR - NEMA 1`
|
||||