vault backup: 2025-10-23 10:52:59
This commit is contained in:
@@ -0,0 +1,57 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- destiny/permanent
|
||||
- occupational/systems/low-voltage
|
||||
- status/draft
|
||||
- type/guide
|
||||
title: Low Voltage
|
||||
---
|
||||
# Low Voltage
|
||||
|
||||
## Info
|
||||
|
||||
* Security/Intrusion Detection
|
||||
* Access Control
|
||||
* CCTV
|
||||
* Audio-Visual
|
||||
* Wi-Fi
|
||||
|
||||
Not to be confused with [[telecom]].
|
||||
|
||||
### Routing
|
||||
|
||||
#### Exposed Ceilings
|
||||
|
||||
EMT to accessible space?
|
||||
PVC to MDF?
|
||||
|
||||
#### Devices
|
||||
|
||||
#### Daisy Chaining
|
||||
|
||||
how many devices (if any)
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Preparation
|
||||
|
||||
1. Locate Proposal/Scope of Work. Determine ownership and takeoff responsibility:
|
||||
* Cabling
|
||||
* Conduit & Pathways
|
||||
* Sleeving
|
||||
2. In the drawings, locate:
|
||||
* Floor plans where LV scope is shown
|
||||
* LV Details
|
||||
3. Read about the project specifications and construction type
|
||||
4. Fill out OneNote
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Takeoff devices as shown throughout the building
|
||||
2. Takeoff riser conduit as needed
|
||||
|
||||
### 3. Review
|
||||
|
||||
1. Sleeving for riser
|
||||
Reference in New Issue
Block a user