vault backup: 2025-10-23 10:52:59
This commit is contained in:
@@ -0,0 +1,108 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- destiny/permanent
|
||||
- occupational/systems/switchgear
|
||||
- status/draft
|
||||
- type/guide
|
||||
title: Switchgear
|
||||
---
|
||||
# Switchgear
|
||||
|
||||
[[distribution-equipment]]
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Preparation
|
||||
|
||||
1. Initial the OneNote
|
||||
2. In the drawings, locate:
|
||||
* Riser Diagrams
|
||||
* House Panels
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Build Items in Distribution:
|
||||
* Panelboards
|
||||
* Switchboards
|
||||
* Meter centers
|
||||
* Generators
|
||||
* Transfer switches
|
||||
* Generator connection cabinets
|
||||
* CT cabinet
|
||||
* Power monitor
|
||||
|
||||
2. Takeoff Common Assemblies:
|
||||
* XFMRs
|
||||
* Disconnect switches
|
||||
|
||||
3. Takeoff Items in Item Database:
|
||||
* Wireway (Trough/Gutter)
|
||||
|
||||
4. Takeoff Temp Assemblies:
|
||||
* Fire Pump
|
||||
* Fire Pump Controller
|
||||
|
||||
When building panelboards/switchboards,
|
||||
add terminations according to an example from the schedules.
|
||||
**Do not include feeder terminations.**
|
||||
|
||||
Items to Avoid:
|
||||
* Tap Boxes
|
||||
* Bus Duct
|
||||
* Vault Room
|
||||
* Anything FPL
|
||||
* Grounding
|
||||
* Elevator Room
|
||||
|
||||
#### SPD's/TVSS's
|
||||
|
||||
Labor only.
|
||||
|
||||
Specific item is not important, but I use
|
||||
`SPLITTERS / SOCKETS / CABINETS`/`METER SOCKETS & CABINETS`/`METERING CURRENT TRANSFORMER`
|
||||
(Labor = 1.5hrs)
|
||||
for consistency.
|
||||
|
||||
#### Submeters/Power Monitors
|
||||
|
||||
See [[switchgear#SPD's/TVSS's]]
|
||||
|
||||
#### Panelboards
|
||||
|
||||
`DISTRIBUTION`/`DIST PANELS & UNIT LOAD CENTERS`/...
|
||||
|
||||
#### Enclosed Circuit Breakers
|
||||
|
||||
Treat as disconnect switch.
|
||||
|
||||
#### Generators
|
||||
|
||||
Add `DISTRIBUTION FITTINGS`/`GENERATOR SET UP`.
|
||||
|
||||
#### Generator Connection Cabinets
|
||||
|
||||
Use a Distribution Panel of equal amps.
|
||||
Or a transfer switch.
|
||||
|
||||
#### Transfer Switches
|
||||
|
||||
> "300A ATS"
|
||||
|
||||
##### Transfer Switches 1200A+
|
||||
|
||||
Use 1200A and add an additional `TRANSFER SWITCH` item
|
||||
to make up the remaining amps.
|
||||
|
||||
#### Meter Centers
|
||||
|
||||
`SWITCHGEAR & METER CENTERS`/`METER CENTERS`/`... METERING SECTION`
|
||||
|
||||
Adjust Factor 1 for meter stacks, delete zeroed items.
|
||||
|
||||
### 3. Review
|
||||
|
||||
1. Generator
|
||||
* Ensure takeoff is in the generator Area and System breakdowns
|
||||
* Put location, quantity, and type on OneNote
|
||||
Reference in New Issue
Block a user