@@ -14,7 +14,7 @@ Also "single-point estimation"
|
||||
as opposed to the standard three-point.
|
||||
|
||||
"Traditional estimating methods"
|
||||
as referenced frequently in [[this notebook]]
|
||||
as referenced frequently in [[this-notebook]]
|
||||
are those [[construction-estimating]] methods that produce:
|
||||
|
||||
* an _exhaustive_ and _specific_ bill of material
|
||||
|
||||