@@ -6,38 +6,61 @@ tags:
---
# Switchgear
## Info
### Special Equipment
#### Company Switches
> [!info] Also Known As
> * Theatrical Switchboards
> * Stage Switchboards
Company switches are lighting control devices
unique to performance venues
like those subject to **NEC Article 520:
Theaters, Audience Areas of Motion Picture and Television Studios,
Performance Areas, and Similar Locations**
![[company-switch.png|500x625]]
> [!cite] NEC Article 520.2
> **Stage Switchboard.**
> A permanently installed switchboard, panelboard, or rack
> containing dimmers or relays with associated overcurrent protective devices,
> or overcurrent protective devices alone, used primarily to feed stage equipment.
## Sequence
### 1. Estimate preparation
1. Initial the OneNote
2. In the drawings, locate:
* Riser Diagrams
* House Panels
3. Copy over default Temporary Assemblies from sandbox job
* Riser Diagrams
* House Panels
### 2. Takeoff
1. Build Items in Distribution:
* Panelboards
* Switchboards
* Meter centers
* Generators
* Transfer switches
* Generator connection cabinets
* Panelboards
* Switchboards
* Meter centers
* Generators
* Transfer switches
* Generator connection cabinets
* CT cabinet
* Power monitor
2. Takeoff Common Assemblies:
* XFMRs
* Disconnect switches
* XFMRs
* Disconnect switches
3. Takeoff Items in Item Database:
* Wireway (Trough/Gutter)
* Wireway (Trough/Gutter)
4. Takeoff Temp Assemblies:
* CT Cabinet
* Meter
* Fire Pump
* Fire Pump Controller
* Fire Pump
* Fire Pump Controller
When building panelboards/switchboards,
add terminations according to an example from the schedules.
@@ -53,7 +76,16 @@ Items to Avoid:
#### SPD's/TVSS's
Labor only: ~1.5hrs
Labor only.
Specific item is not important, but I use
`SPLITTERS / SOCKETS / CABINETS`/`METER SOCKETS & CABINETS`/`METERING CURRENT TRANSFORMER`
(Labor = 1.5hrs)
for consistency.
#### Submeters/Power Monitors
See [[switchgear#SPD's/TVSS's]]
#### Panelboards
@@ -65,7 +97,7 @@ Treat as disconnect switch.
#### Generators
Add `GENERATOR SET UP`
Add `DISTRIBUTION FITTINGS`/`GENERATOR SET UP`.
#### Generator Connection Cabinets
@@ -92,5 +124,5 @@ Adjust Factor 1 for meter stacks, delete zeroed items.
### 3. Extension (Review and Checking)
1. Generator
* Ensure takeoff is in the generator Area and System breakdowns
* Put location, quantity, and type on OneNote
* Ensure takeoff is in the generator Area and System breakdowns
* Put location, quantity, and type on OneNote