@@ -32,7 +32,7 @@ Please confirm you have received this email and respond with any questions or co
|
||||
|
||||
* Conduit Execution Plans:
|
||||
* EMT Fittings: Not specified.
|
||||
* Rigid elbows where stubbing up from grade. _---E.0.X.1 "ELECTRICAL NOTES" Notes 53, 54_
|
||||
* Rigid elbows where stubbing up from grade. _---E.0.X.1 "ELECTRICAL NOTES" Note 32_
|
||||
* PVC slab-on-grade, below grade only. _---E.0.X.1 "ELECTRICAL NOTES" Note 32_
|
||||
%% GRC, coupling specs, etc. %%
|
||||
|
||||
@@ -62,6 +62,7 @@ Please confirm you have received this email and respond with any questions or co
|
||||
MAIN BREAKER AIC RATING IS 65K.
|
||||
UNIT APARTMENT PANELBOARD MAIN BREAKER AIC RATING 10K."
|
||||
_---E.4.X.1 "RISER NOTES" Note (B)_
|
||||
* Unit load center covers to be white _---E.3.X.X "KEY NOTES" Note 6_
|
||||
|
||||
* Transformers:
|
||||
* Winding Material: Not specified.
|
||||
@@ -71,16 +72,18 @@ Please confirm you have received this email and respond with any questions or co
|
||||
* Generator: N/A.
|
||||
%% Acceptable manufacturers, Enclosure Specs, Sound Rating, Remote Tank, Tank Size, Load Banks %%
|
||||
|
||||
<!--
|
||||
### Project Drawing/Detail Callouts
|
||||
|
||||
* Describe conflicts between drawings / proposal:
|
||||
%% "Plans show CU feeders, proposal calls for aluminum", Specification grade devices, etc. %%
|
||||
|
||||
* Cost drivers in details not shown elsewhere on plans:
|
||||
-->
|
||||
|
||||
### PDI System Execution Plan
|
||||
|
||||
* Primaries: (2) 4"C install only. Wiring excluded. _---Proposal 2026-04-16_
|
||||
* Primaries: (2) 4"C install only, conduit furnished by FPL. Wiring excluded. _---Proposal 2026-04-16_
|
||||
%% Installation only, (9) 6" PVC %%
|
||||
|
||||
* Secondaries: PVC with RMC stub-ups. AL wiring.
|
||||
@@ -89,16 +92,18 @@ Please confirm you have received this email and respond with any questions or co
|
||||
* Feeders: PVC in-slab, below grade; EMT OH. AL over 100A. 2% VD.
|
||||
%% PVC UG, EMT OH, AL over 100A, 2% VD %%
|
||||
|
||||
* Unit Subfeeds: PVC in-slab. AL wiring. 2% VD.
|
||||
* Unit Subfeeds: PVC in-slab. AL wiring. 3% VD.
|
||||
%% MC OH AL, VD per Chart on E5.01 %%
|
||||
|
||||
* Units: 20A toggle/duplex, USB rec's, disposals, thermostat wiring.
|
||||
%% 15A Decora, Insinkerators, T-stat, Floor Boxes, Shade Control, Doorbells, Dimmer Switches, etc. %%
|
||||
|
||||
* Telecom: (4) 4"C each building. (2) 4"C riser each building. 1"C to each unit. Assuming 28" MSDE's.
|
||||
* Telecom:
|
||||
* Backbone: (4) 4"C UG, (2) 4"C riser each building.
|
||||
* Units: 1"C to each unit. Assuming 28" MSDE's. Excluding homeruns and cabling. Stub-ups each outlet.
|
||||
%% 42" MSDE, No Cable Homeruns, (1) 1" Back to IDF, CAT6 with Stub-ups %%
|
||||
|
||||
* EV Chargers: (12) conduit, wire, equipment.
|
||||
* EV Chargers: (12) conduit, wire, equipment. _---E.1.X.1, Proposal 2026-04-16_
|
||||
%% (42) Conduit only, (56) Conduit & Wire, (20) Conduit, Wire & Equipment %%
|
||||
|
||||
* Fire Alarm: PVC in-slab, below grade. 120V smokes in units.
|
||||
@@ -112,9 +117,11 @@ Please confirm you have received this email and respond with any questions or co
|
||||
|
||||
### Lighting Control
|
||||
|
||||
* Scope: Per plans.
|
||||
* Scope: Per plans. See E.6.X.2 "TYPICAL LOW VOLTAGE LIGHTING CONTROLS".
|
||||
%% Code Minimum per Energy Code Assigned, P&S, PDI Design %%
|
||||
|
||||
* Governing Code: FBC 2023 (IECC 2021)
|
||||
|
||||
* Area: %% Assign Method to Areas: Line Voltage, Low-Voltage Stand Alone or Centralized System %%
|
||||
* BOH: Line voltage.
|
||||
* Corridor: Digital standalone.
|
||||
@@ -130,8 +137,8 @@ If all necessary tasks are open or completed:
|
||||
"No tasks missing."
|
||||
-->
|
||||
|
||||
|
||||
* ==Switchgear Quote==
|
||||
* Switchgear
|
||||
* Fire Alarm
|
||||
* Electrical Constructability Review
|
||||
* Electrical VDC
|
||||
* Coordination Study %% Design Build: Not needed. %%
|
||||
|
||||