vault backup: 2026-04-21 17:07:39
This commit is contained in:
+16
-5
@@ -29,11 +29,16 @@ tags:
|
||||
> It is usually best to copy-paste takeoffs
|
||||
> rather than re-build them for each unit.
|
||||
|
||||
3. Kitchen and Bath
|
||||
4. General assemblies
|
||||
5. Low Voltage
|
||||
6. Lighting Fixtures
|
||||
7. Lighting Control
|
||||
1. Load Center
|
||||
2. General assemblies
|
||||
1. Water Heater
|
||||
2. HVAC
|
||||
3. Laundry
|
||||
4. Kitchen
|
||||
5. Bathroom
|
||||
6. Low Voltage
|
||||
7. Lighting Fixtures
|
||||
8. Lighting Control
|
||||
|
||||
> [!tip]
|
||||
> It may be more efficient and neat to not copy switches,
|
||||
@@ -102,6 +107,12 @@ Used in lieu of individual split systems.
|
||||
|
||||
[^1]: [[2026-01-12_10-42-30#Unit Dishwasher/Disposal]]
|
||||
|
||||
### Disposal Switches
|
||||
|
||||
??? confirm
|
||||
If not air switch (check ID's)
|
||||
add single pole switch shown.
|
||||
|
||||
### Islands
|
||||
|
||||
Use (1) `SLAB / DECK` receptacle for every 2 circuits in the island.
|
||||
|
||||
Reference in New Issue
Block a user