@@ -38,36 +38,32 @@ Match Fire Alarm takeoff Length and Count
### Stairwell Riser Every 2 Floors
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`STAIRWELL RISER EVERY 2 FLRS = 1 1/2" EMT (20') W/ 16X16X6 BOX`
`Area` = "Typical - Building Even Levels"
Create a Stairwell typical on every other floor
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`STAIRWELL RISER EVERY 2 FLRS = ...`
### FACR to Electric Room
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`FACR TO 2HR-RATED RM = 2" PVC40`
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`FACR TO 2HR-RATED RM = ...`
Match Fire Alarm takeoff Length
### Electric Room Riser to Every Floor
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`2HR-RATED RM RISER TO EVERY FLR = 2" EMT (15') W/ 16X16X6 BOX`
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`2HR-RATED RM RISER TO EVERY FLR = ...`
Takeoff in every Electric Room
### Top 2H Rated Room To Roof
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`TOP 2HR RATED RM TO ROOF = 2" EMT W/ RMC WEATHERHEAD & IMC STUB`
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`TOP 2HR RATED RM TO ROOF = ...`
Use 15' or Height of ceiling on last building level
## Horizontal
CORRIDORS EMT OH = 1 1/2" EMT W/ 16X16X6 BOX EVERY 80'
CA.28.31.23
CORRIDORS DECK = 1 1/2" PVC40, STUBBY, FLEX W/ 16X16X6 BOX EVERY 80'
CA.28.31.21
1-1/2 through corridors w/ 16x16x6 J-Box
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`CORRIDORS ...`
Length for every corridor/garage