@@ -165,7 +165,7 @@ Also called "cove" or "strip" lighting,
however those terms are less specific
and potentially confusing.
Use item `FIXTURE LABOR 1/2HR`
Use item `FIXTURE LABOR 1HR`
and change `Fct 1` to match the calculated labor
(1 hour per 12 feet).
@@ -245,6 +245,7 @@ round up to the nearest 5ft
## Facade
> [!info] Breakdowns
> * `Phase` = "Facade"
Length and Labor will be more than a normal fixture in BOH/Amenity
@@ -269,6 +270,7 @@ Create its own breakout in WBS, and phase in [[accubid|Accubid]]
### Breakdowns
> [!info] Breakdowns
> * `System` = "FML - Site Fixtures Material & Labor"
### Pole Lights