## 303 Mariposa Residence Senior Review
[[conest-senior-review]] for [[303-mariposa-residence]].
[[conest-senior-review]] for [[303-mariposa-residence]]
lead by [[joel-jansen]] and attended by [[zane-meyers]] and [[jared-defanti]].
### Selling Price
[[pdi-bid-estimating|Bid]]'s proposal base bid \$800,000
[[pdi-bid-estimating|Bid]]'s proposal base bid was \$800,000,
but in response to the [[conest-pre-takeoff-confirmation]]
[[joshua-komis]] said to add \$65,000 for secondaries.
Joel messaged [[joshua-komis|Joshua Komis]] to clarify.
We found correspondence
that the secondaries were sold as $10,000 for conduit
and $65,000 for wire.
Joel messaged Komis to clarify.
He responded to use \$875,000.
### Site Run Adders
previous direction to use 15ft adders for site runs
It would be easier to assume 10ft for all cases
Joel agreed
Joel questioned the use of 15ft adders for secondaries.
I explained their use was based on prior direction he had given below.
> [!quote] feeders-takeoff.md
> #### Adders
>
> Use the difference in elevation between equipment
> or 10ft, whichever is greater.
>
> Add an additional 5ft (total 15ft) for site runs
> (primaries, secondaries, etc.).
Joel remembered and started to move on.
Jared asked if the extra adder was for vertical distance or routing contingency,
Joel responded that it was sort of both.
I suggested that if it may be necessary to adjust them anyway,
and "site runs" often being up to interpretation,
it may be preferable to assume 10ft to start for all cases
where the start and end are on the same level.
That is, remove the conditional 5ft extra adder from the script.
Joel agreed.
Mariposa's site runs didn't need adders at all
since we added PVC80 stub-ups.
@@ -36,6 +63,8 @@ Solar [[feeders-takeoff]] used copper feeder size
based on aluminum size shown in Solar set.
No change necessary.
We should have added the solar one-line to LiveCount.
### Material Pricing
Joel requested pricing for the dimmable receptacles from [[pdi-procurement]].
@@ -47,8 +76,8 @@ but taken off as 2 counts each.
### Telecom
[[telecom-takeoff]] used Cat5e
which we assumed, but did not note visibly.
[[telecom-takeoff]] assumed Cat5e
but we did not note the assumption visibly.
### Fire Alarm
@@ -60,13 +89,18 @@ which we assumed, but did not note visibly.
assuming a dozen or so interconnected smokes.
\$26,XXX was the quote
for sprinkler monitoring only
for sprinkler monitoring only.
"only one assembly"
### Closeout
#### Sales Tax
#### Final Pricing
[[pdi-accubid-final-price]] 10.35%
[[pdi-accubid-final-price]]
##### Sales Tax
10.35%
#### Equipment