vault backup: 2026-05-13 16:57:04
This commit is contained in:
@@ -11,7 +11,7 @@ up: "[[pdi-pre-takeoff-confirmation]]"
|
||||
%%
|
||||
Email template for use in [[pdi-pre-takeoff-confirmation]].
|
||||
|
||||
This template effectively replicates the official template,
|
||||
This template effectively replicates the official template
|
||||
originally written in Microsoft Word.
|
||||
|
||||
It's my belief that this template can not be implemented
|
||||
@@ -96,12 +96,12 @@ Please confirm you have received this email and respond with any questions or co
|
||||
%% Code Minimum per Energy Code Assigned, P&S, PDI Design %%
|
||||
|
||||
* Area: %% Assign Method to Areas: Line Voltage, Low-Voltage Stand Alone or Centralized System %%
|
||||
* BOH:
|
||||
* Corridor:
|
||||
* Amenity:
|
||||
* Site/Landscape:
|
||||
* Garage Entry Point
|
||||
* Office:
|
||||
* BOH:
|
||||
* Corridor:
|
||||
* Amenity:
|
||||
* Site/Landscape:
|
||||
* Garage Entry Point
|
||||
* Office:
|
||||
|
||||
### Tasks/Quotes Needed for WBS
|
||||
|
||||
|
||||
Reference in New Issue
Block a user