vault backup: 2025-12-29 11:01:42
This commit is contained in:
+13
-5
@@ -1,22 +1,30 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
title: Fixtures Takeoff
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- occupational/takeoff
|
||||
- status/draft
|
||||
- type/guide
|
||||
title: Fixtures Takeoff
|
||||
---
|
||||
# Fixtures Takeoff
|
||||
|
||||
This system is only for luminaires and their immediate branch wiring.
|
||||
See also [[lighting-controls-takeoff]] and [[electrical-takeoff]].
|
||||
|
||||
## Sequence
|
||||
[[fixture-designations]]
|
||||
|
||||
See [[fixture-designations]].
|
||||
## Garage
|
||||
|
||||
1. Takeoff floor plans in order
|
||||
2. Takeoff enlarged drawings
|
||||
### Fixtures
|
||||
|
||||
See [[fixture-designations#Garage]].
|
||||
|
||||
### Homeruns
|
||||
|
||||
> * `System` = "EL - Electrical"
|
||||
> `COMMON ASSEMBLIES`/`Device Homeruns in Slab/Deck`
|
||||
|
||||
Use 1 homerun for every 3 circuits in Garage
|
||||
|
||||
Reference in New Issue
Block a user