diff --git a/2026-02-11_12-12-16.md b/2026-02-11_12-12-16.md index 636515d..86edc35 100644 --- a/2026-02-11_12-12-16.md +++ b/2026-02-11_12-12-16.md @@ -1,17 +1,17 @@ --- id: aliases: [] -title: "2026-02-11 12:12:16" +title: 2026-02-11 12:12:16 tags: - authorship/original - destiny/permanent - status/draft - type/periodic/timestamped -dg-publish: true daily: "[[2026-02-11]]" -weekly: "[[2026-W07]]" +dg-publish: true monthly: "[[2026-02]]" quarterly: "[[2026-Q1]]" +weekly: "[[2026-W07]]" yearly: "[[2026]]" --- # 2026-02-11 12:12:16 @@ -21,98 +21,168 @@ Hello Team, Below is a comprehensive list of means & methods for {Project Name}. Please confirm you have received this email and respond with any questions or comments. -- Takeoff Request Stage: +* **Takeoff Request Stage:** Full Takeoff -- Delivery Method: +* **Delivery Method:** Plans & Specs -- Document Stage: +* **Document Stage:** Permit -- Drawings Date: -- Project Manual Date: -- Proposal Date: +* **Drawings Date:** 2025-12-05 +* **Project Manual Date:** 2025-10-29 +* **Proposal Date:** 2026-02-11 -### Project Specification Callouts +## Project Specification Callouts -- Conduit Execution Plans: +* **Conduit:** + * EMT Fittings: Set-screw. _---Spec 260533.13 (p. 1423)_ -- Wire: - -- {MC} Cable Application: - -- Steel Box Depth: + +* **Wire:** + * Material: Aluminum 100A and larger + * Acceptable Manufacturers: + * Alpha Wire; Brand of Belden, Inc. + * Belden Inc. + * Cerro Wire LLC + * Encore Wire Corporation + * General Cable; Prysmian Group North America + * Okonite Company + * Service Wire Co. + * Southwire Company, LLC + * WESCO + +* **MC Cable:** + * Application: + + * Acceptable Manufacturers: + * AFC Cable Systems; Atkore International + * Alpha Wire; Brand of Belden, Inc. + * Belden Inc. + * Cerro Wire LLC + * Encore Wire Corporation + * General Cable; Prysmian Group North America + * Okonite Company + * Southwire Company, LLC + * WESCO + +* **Steel Box Depth:** + * Telecom: 2-1/8" _---Spec 270500 (p. 1673)_ + * Security: 2-1/8" _---Spec 280500 (p. 1753)_ + * Other Applications: Not specified -- Floor Boxes: - - Box Material: + +* **Floor Boxes:** + * Box Material: * Cover Material: -- Wiring Devices: - - Units: - - - BOH/Common Areas: + +* **Wiring Devices:** + * Units: + + * BOH/Common Areas: -- Switchboards/Panelboards: - -- Transformers: + +* **Switchboards:** + * Acceptable Manufacturers: _---Spec 262413 (p. 1502)_ + * ABB, Electrification Business + * Eaton + * Siemens Industry, Inc., Energy Management Division + * Square D; Schneider Electric USA + * General Electric + * Bus Material: Aluminum _---Spec 262413 (p. 1503)_ + * Breaker Types: + + * AIC Ratings: + +* **Panelboards:** + * Acceptable Manufacturers: _---Spec 262413 (p. 1514-1515)_ + * ABB, Electrification Business + * Eaton + * Siemens Industry, Inc., Energy Management Division + * Square D; Schneider Electric USA + * Bus Material: + * Breaker Types: + + * ACI Ratings: + +* **Transformers:** + * Winding Material: Aluminum _---Spec 262213 (p. 1495)_ + * K-Rating: Not specified -- Generator: - * Acceptable manufacturers: - * Enclosure Specs: - * Sound Rating: - * Remote Tank: - * Tank Size: - * Load Banks: -### Project Drawing/Detail Callouts +* **Generator:** (1) 600kW Diesel + * Enclosure Specs: Level 2 Sound Attenuating Weatherproof Enclosure. _---Dwg. E014_ + * Remote Tank: None shown or specified. + * Tank Size: 24hrs at 100% load. _---Spec 263213.13 (p. 1604)_ + * Load Banks: Internal, 50% load. _---Dwg. E014, Spec 263213.13 (p. 1608)_ + * Acceptable Manufacturers: _---Spec 263213.13 (p. 1600)_ + * Caterpillar, Inc.; Electric Power Division + * Cummins Power Generation + * Generac + * Hipower Systems + * Kohler Power Systems + * Rolls-Royce Solutions America Inc -- Describe conflicts between drawings / proposal: +## Project Drawing/Detail Callouts + +* **Describe conflicts between drawings / proposal:** -- Cost drivers in details not shown elsewhere on plans: -- +* **Cost drivers in details not shown elsewhere on plans:** +* -### PDI System Execution Plan +## PDI System Execution Plan -- Primaries: +* **Primaries:** Conduit and wiring excluded. _---Proposal 2026-01-22, Ex. B, Exclusions, Line 27_ -- Secondaries: +* **Secondaries:** Wiring excluded. _---Proposal 2026-01-22, Ex. B, Exclusions, Line 28_ -- Feeders: +* **Feeders:** -- Unit Subfeeds: +* **Unit Subfeeds:** EMT-SS, MC OH; PVC UG -- Units: - -- Telecom: +* **Units:** + +* **Telecom:** -- EV Chargers: +* **EV Chargers:** -- Fire Alarm: Devices PVC in-slab, Risers EMT. +* **Fire Alarm:** Devices PVC in-slab, Risers EMT. -- DAS: +* **DAS:** System included -- Low Voltage: +* **Low Voltage:** Free-air where allowed by code. -### Lighting Control +## Lighting Control -- Scope: +* **Scope:** -- Area: - - BOH: - - Corridor: - - Amenity: - - Site/Landscape: - - Garage Entry Point - - Office: +* **Area:** + * BOH: + * Corridor: + * Amenity: + * Site/Landscape: + * Garage Entry Point + * Office: -### Tasks/Quotes Needed for WBS +## Tasks/Quotes Needed for WBS -- Constructability Review, etc. + -- DAS Raceway Design + +* Electrical VDC +* Coordination Study + + + Thank you,