vault backup: 2026-01-23 15:26:10
This commit is contained in:
@@ -16,6 +16,7 @@ tags:
|
||||
Cross-topic of [[statistical-modeling]] and [[construction-estimating]].
|
||||
|
||||
%%
|
||||
|
||||
## TALK
|
||||
|
||||
This note should discuss the application of modeling in estimating,
|
||||
@@ -29,6 +30,10 @@ and where more precise methods would be suboptimal[^1].
|
||||
|
||||
Specific examples should generally be relegated to linked notes.
|
||||
|
||||
This note may contain common objections
|
||||
and arguments disputing them,
|
||||
but the reader should be assumed not to be especially skeptical.
|
||||
|
||||
%%
|
||||
|
||||
## Bayesian Takeoff
|
||||
@@ -84,4 +89,4 @@ Maximum area per floor is sometimes capped by
|
||||
[[ibc-construction-types]] or [[ibc-occupancy-classifications]],
|
||||
either directly (see [[ibc_ch05]], [[ibc_ch09]]),
|
||||
or by maximum travel distance (see [[ibc_ch10]]).
|
||||
Stairwells are expensive. There are usually only 2 or 3.
|
||||
Stairwells are expensive. There are usually only 2 or 3.
|
||||
|
||||
Reference in New Issue
Block a user