vault backup: 2026-02-10 17:11:21
This commit is contained in:
@@ -0,0 +1,75 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
title: "2026-02-10 15:49:04"
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
dg-publish: true
|
||||
daily: "[[2026-02-10]]"
|
||||
weekly: "[[2026-W07]]"
|
||||
monthly: "[[2026-02]]"
|
||||
quarterly: "[[2026-Q1]]"
|
||||
yearly: "[[2026]]"
|
||||
---
|
||||
# 2026-02-10 15:49:04
|
||||
|
||||
## Hampton Roads Navy - Norfolk: Director Review
|
||||
|
||||
### Dramatis Personae
|
||||
|
||||
Director of ConEst: Corwin Fluit
|
||||
|
||||
Bid Estimator: Christian Pereiro
|
||||
|
||||
Senior ConEst Estimator: Joel Jansen
|
||||
|
||||
### Lighting Control
|
||||
|
||||
* Corridors: $10 per linear foot
|
||||
* Amenity: $5 per square foot
|
||||
|
||||
> * FALSE: Multiple occupancy sensors per zone necessitates digital control.
|
||||
> * FALSE: 0-10V dimming necessitates digital control.
|
||||
> * FALSE: 0-10V dimming + occupancy sensing necessitates digital control.
|
||||
> * TRUE: 0-10V dimming controlled by occupancy sensing necessitates digital control.
|
||||
|
||||
Systems refused to quote lighting control due to lack of detail,
|
||||
but sufficient detail was provided.
|
||||
|
||||
Bid expected takeoff to include DLM devices and cabling.
|
||||
|
||||
### Closeout
|
||||
|
||||
On Base - Newport News is not
|
||||
|
||||
Carried labor for lost time due to badging
|
||||
|
||||
#### Equipment
|
||||
|
||||
> [!quote] Corwin Fluit 2026-02-10
|
||||
> `AUGER ON BOBCAT (per pole)` does not include cost for setting pole
|
||||
|
||||
### Free Notes
|
||||
|
||||
Ops creates, approves the labor plan.
|
||||
This limits our ability to make interesting decisions:
|
||||
MC cable ILO PVC in-slab pushes the schedule out.
|
||||
|
||||
### Thoughts
|
||||
|
||||
#### Corwin
|
||||
|
||||
Corwin is a true _estimator_.
|
||||
I've met few people more willing to make calculations
|
||||
and give confident estimates in conversation.
|
||||
|
||||
He understands the necessity of accepting and accounting for risk.
|
||||
|
||||
He is as critical of overly-heavy estimates
|
||||
as light estimates.
|
||||
He specifically prefers accurate line item costs
|
||||
with a single contingency
|
||||
over inflated individual budgets.
|
||||
Reference in New Issue
Block a user