vault backup: 2025-10-21 17:03:44
This commit is contained in:
@@ -0,0 +1,62 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- destiny/permanent
|
||||
- occupational
|
||||
- status/incomplete
|
||||
- type/guide
|
||||
title: PDI Labor Plan
|
||||
---
|
||||
# PDI Labor Plan
|
||||
|
||||
1. Fill out project basics
|
||||
|
||||
2. Check that everything is sorted into correct Phase and Area (Extension: Phase - Area)
|
||||
|
||||
3. Move everything in BUILDING FA systems into FA phase
|
||||
|
||||
* Create a Phase named: "Fire Alarm"
|
||||
* Check system and Bid Item
|
||||
* Scroll through each and select all line items `FA - ...`
|
||||
* Change Breakdown to "Fire Alarm" phase
|
||||
|
||||
4. Separate all Phases into their proper corresponding "Labor Factor"
|
||||
|
||||
* Check Phase box
|
||||
* Start scrolling through beginning with N/A
|
||||
* Change breakdown of everything in each phase to the proper labor factor
|
||||
* Do not move Temp Power (buckets) or site
|
||||
|
||||
5. Use the Accubid Extension tab to fill out the "Unit Lbr Calc" tab in the labor plan
|
||||
|
||||
6. Select the "Phase / Sort Code" extension view
|
||||
|
||||
7. Open "UNIT RESIDENTIAL" and "Building - Corridors" phases
|
||||
|
||||
8. Go into each Sort code to find the count for each unit item
|
||||
|
||||
| Code | Description |
|
||||
| ---- | -------------------- |
|
||||
| 200 | rough |
|
||||
| 300 | trim |
|
||||
| 400 | rough wire and cable |
|
||||
|
||||
9. Some items will autofill when you fill out the "Accubid Extension Totals" table on the right
|
||||
|
||||
* Anything you make adjustments to, highlight red so it can be reviewed
|
||||
|
||||
10. Fill out the "Labor for Concrete Slab/Deck Labor" table on the labor sheet calc tab
|
||||
|
||||
* For the floor counts, if there are multiple buildings, add their total level count together
|
||||
|
||||
* 2 buildings that each have 10 floors, input 20 for "number of floors - building
|
||||
|
||||
* Add any useful description to the naming
|
||||
* Can change "Other" to something more prevalent on the project
|
||||
|
||||
* "pour section rate" refers to the size of each slab that will be poured (sometimes will be shown on the structural plans)
|
||||
|
||||
* "Number of days per…" is found by multiplying "Pour Section Qty" by 4 or 5
|
||||
|
||||
11. Check that everything is sorted into correct Phase and Area (Extension: Phase - Area)
|
||||