# Feeders
|
||||
# Feeders Takeoff
|
||||
|
||||
[[conduit-routing]]
|
||||
> [!important]
|
||||
> Complete [[pre-takeoff-research]],
|
||||
> including [[wiring-method-selection]],
|
||||
> before beginning takeoff.
|
||||
|
||||
## Info
|
||||
#### Fire Rated Feeders
|
||||
## Execution
|
||||
|
||||
PDI estimating practice is to run all "emergency" feeds
|
||||
(life-safety or just standby)
|
||||
in a 2-hour rated assembly.
|
||||
This usually requires no change to takeoff for high-rises
|
||||
since electrical riser rooms are themselves fire-rated.
|
||||
|
||||
* RHW-2 insulated conductors in conduit -- "Lifeline Cable"
|
||||
* 2-hour rated metal clad cable -- "Vitalink"
|
||||
### Formatting
|
||||
|
||||
All feeder takeoff descriptions should be prefixed with `<parent> TO <child>`
|
||||
@@ -33,22 +27,7 @@ All feeder takeoff descriptions should be prefixed with `<parent> TO <child>`
|
||||
> (i.e. meter centers fed from bus plugs)
|
||||
> so long as the typical is in the Feeders `Area`.
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Preparation
|
||||
|
||||
Read about the project specifications and construction type:
|
||||
* Deck thickness
|
||||
* Wiring methods
|
||||
* Conductor material
|
||||
* Wire terminations (set-screw acceptable or compression required?)
|
||||
|
||||
Locate:
|
||||
* Riser Diagram
|
||||
* Feeder Schedule (if present)
|
||||
* Main Electrical rooms and panel locations
|
||||
|
||||
### 2. Takeoff
|
||||
### Routing
|
||||
|
||||
Run parallel to building lines
|
||||
and route through corridors where possible.
|
||||
@@ -67,42 +46,38 @@ or 10ft, whichever is greater.
|
||||
Add an additional 5ft (total 15ft) for site runs
|
||||
(primaries, secondaries, etc.).
|
||||
|
||||
#### Primaries
|
||||
## Primaries
|
||||
|
||||
Usually only empty conduit if included.
|
||||
|
||||
#### Secondaries
|
||||
## Secondaries
|
||||
|
||||
##### Wiring on Vault Racks
|
||||
### Wiring on Vault Racks
|
||||
|
||||
Where secondary conductors run on racks in utility vaults
|
||||
manually set the length of conduit,
|
||||
measure the wire length,
|
||||
add 20ft in addition to previously mentioned adders.
|
||||
|
||||
#### Feeders
|
||||
## Feeders
|
||||
|
||||
`Area` = "01 - Feeders/Risers Building"
|
||||
for all feeders, no matter the location.
|
||||
|
||||
#### Bus Duct
|
||||
## Bus Duct
|
||||
|
||||
`COMMON ASSEMBLIES`/`DISTRIBUTION`/`BUS DUCT`
|
||||
|
||||
#### Conductor Support
|
||||
## Conductor Support
|
||||
|
||||
![[nfpa-70_300_general-requirements#300.19(A) Spacing Intervals -- Maximum.]]
|
||||
|
||||
![[nfpa-70]]
|
||||
|
||||
`ITEM DATABASE`/`CONDUIT & FITTINGS`/`CABLE SUPPORT / WEDGES`/`... COMPLETE FITTING`/...
|
||||
|
||||
#### Grounding
|
||||
## Grounding
|
||||
|
||||
See [[grounding-takeoff]].
|
||||
|
||||
#### Sleeving
|
||||
## Sleeving
|
||||
|
||||
See [[sleeving-takeoff]].
|
||||
|
||||