vault backup: 2025-10-27 16:34:32

This commit is contained in:
2025-10-27 16:34:32 -04:00
parent ee0948dd00
commit 68bb25782b
39 changed files with 19498 additions and 426 deletions
+13 -36
View File
@@ -2,16 +2,24 @@
id:
aliases: []
tags:
- authorship/original
- destiny/permanent
- occupational/takeoff/low-voltage
- status/draft
- type/guide
- authorship/original
title: Low Voltage
title: Low Voltage Takeoff
---
# Low Voltage
# Low Voltage Takeoff
## Info
> [!important]
> Complete [[pre-takeoff-research]],
> including [[low-voltage-raceway-selection]]
> before beginning takeoff.
> [!info]
> See [[low-voltage-systems]] for more info.
## Scope
* Security/Intrusion Detection
* Access Control
@@ -21,38 +29,7 @@ title: Low Voltage
Not to be confused with [[telecom]].
### Routing
#### Exposed Ceilings
EMT to accessible space?
PVC to MDF?
#### Devices
#### Daisy Chaining
how many devices (if any)
## Sequence
### 1. Preparation
1. Locate Proposal/Scope of Work. Determine ownership and takeoff responsibility:
* Cabling
* Conduit & Pathways
* Sleeving
2. In the drawings, locate:
* Floor plans where LV scope is shown
* LV Details
3. Read about the project specifications and construction type
4. Fill out OneNote
### 2. Takeoff
## Takeoff
1. Takeoff devices as shown throughout the building
2. Takeoff riser conduit as needed
### 3. Review
1. Sleeving for riser