vault backup: 2025-10-27 16:34:32
This commit is contained in:
+6
-16
@@ -2,28 +2,18 @@
|
||||
id: sleeving
|
||||
aliases: []
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- occupational/takeoff
|
||||
- status/draft
|
||||
- type/guide
|
||||
- authorship/original
|
||||
title: Sleeving
|
||||
title: Sleeving Takeoff
|
||||
---
|
||||
# Sleeving
|
||||
# Sleeving Takeoff
|
||||
|
||||
## Info
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Preparation
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
Provide sleeves for all feeder conduits passing through floors.
|
||||
Provide sleeves for all conduits passing through floors.
|
||||
|
||||
`ITEM DATABASE`/`HILTI`/`CAST-IN DEVICE CP 680-...`
|
||||
|
||||
* Concrete => P (Plastic - Combustible)
|
||||
* Wood Framed => M (Metal - Non-Combustible)
|
||||
|
||||
### 3. Review
|
||||
* Slab Deck => P (Plastic - Combustible)
|
||||
* Wood Frame => M (Metal - Non-Combustible)
|
||||
|
||||
Reference in New Issue
Block a user