vault backup: 2025-10-27 16:34:32
This commit is contained in:
+19
-25
@@ -2,35 +2,33 @@
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- occupational/takeoff/telecom
|
||||
- status/draft
|
||||
- type/guide
|
||||
- authorship/original
|
||||
title: Telecom
|
||||
---
|
||||
# Telecom
|
||||
|
||||
## Info
|
||||
> [!info] Scope
|
||||
> * Telephone
|
||||
> * Data
|
||||
> * Cable TV
|
||||
|
||||
* Telephone
|
||||
* Data
|
||||
* Cable TV
|
||||
> [!important]
|
||||
> Not to be confused with [[low-voltage-takeoff]].
|
||||
|
||||
Not to be confused with [[low-voltage]].
|
||||
## Preparation
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Preparation
|
||||
|
||||
#### Riser
|
||||
### Riser
|
||||
|
||||
1. Locate MDF and IDF Rooms
|
||||
2. Service entrance conduit "Site Low Voltage Ductbank (SLVDB)"
|
||||
3. Riser throughout building
|
||||
4. Sleeving for riser
|
||||
|
||||
#### Devices
|
||||
### Devices
|
||||
|
||||
1. Locate Proposal/Scope of Work. Determine ownership and takeoff responsibility:
|
||||
* Cabling
|
||||
@@ -41,12 +39,12 @@ Not to be confused with [[low-voltage]].
|
||||
4. Read about the project specifications and construction type
|
||||
5. Fill out OneNote
|
||||
|
||||
### 2. Takeoff
|
||||
## Takeoff
|
||||
|
||||
1. Takeoff devices as shown throughout the building
|
||||
2. Takeoff Conduit Riser as needed
|
||||
|
||||
#### "Site Low Voltage Duct Bank"
|
||||
### "Site Low Voltage Duct Bank"
|
||||
|
||||
* Conduit from outside of building to MDF
|
||||
|
||||
@@ -63,12 +61,12 @@ Not to be confused with [[low-voltage]].
|
||||
* Stubbed 5' outside of building footprint
|
||||
* Garden Style - Outside of every building
|
||||
|
||||
#### Telecom Vaults
|
||||
### Telecom Vaults
|
||||
|
||||
* Temp. Item
|
||||
* $1000, 12 Hours, Sort Code 200
|
||||
|
||||
#### Backbone Riser
|
||||
### Backbone Riser
|
||||
|
||||
| | |
|
||||
| ------ | --------------------- |
|
||||
@@ -85,13 +83,13 @@ Then from MTR/MDF/MPOE, typically (2-4) 4" to Telecom Riser (sometimes in electr
|
||||
Add sleeves
|
||||
* (2) 4" EZ Path - ID.HILTI
|
||||
|
||||
#### Telecom Backboard
|
||||
### Telecom Backboard
|
||||
|
||||
A-Bid: Telecom Backbone
|
||||
|
||||
`COMMON ASSEMBLIES`/`MISC ASSEMBLIES`/`... PLYWOOD BACKBOARD`
|
||||
|
||||
#### Corridor Conduit
|
||||
### Corridor Conduit
|
||||
|
||||
* EMPTY CONDUIT : MSDE TO IDF
|
||||
|
||||
@@ -103,7 +101,7 @@ A-Bid: Telecom Backbone
|
||||
* Choose size
|
||||
* Strut mount
|
||||
|
||||
#### Inner Duct
|
||||
### Inner Duct
|
||||
|
||||
USE GP (CA.27.10.11-14)
|
||||
|
||||
@@ -117,7 +115,7 @@ For Future use (ex// Fiber)
|
||||
> * Subfeed Average is 100'
|
||||
> * Level 2 Area A Micro Duct = 2000' Length and 20 Count
|
||||
|
||||
#### Devices
|
||||
### Devices
|
||||
|
||||
CA. Telecom. 8. 6 or 7
|
||||
|
||||
@@ -135,7 +133,7 @@ Count all telecom located in a wall
|
||||
|
||||
If more than 3 wires use 1" conduit
|
||||
|
||||
##### Rough-In Only
|
||||
#### Rough-In Only
|
||||
|
||||
Run when Free Air is Qualified on Proposal
|
||||
|
||||
@@ -144,7 +142,3 @@ CA.27.8.6/7
|
||||
|
||||
CA.22.7
|
||||
* Parts: 2 Boxes, EMT Stub, 1 J-hook/per 6'
|
||||
|
||||
### 3. Review
|
||||
|
||||
1. Sleeving
|
||||
|
||||
Reference in New Issue
Block a user