vault backup: 2026-03-10 16:54:17
This commit is contained in:
@@ -34,11 +34,13 @@ Please confirm you have received this email and respond with any questions or co
|
||||
### Project Specification Callouts
|
||||
|
||||
* **Conduit:**
|
||||
%% GRC, coupling specs, etc. %%
|
||||
* EMT Fittings: _---Spec 260510 2.4(N)(2) (p. 2226)_
|
||||
* Smaller than trade size 2-1/2": Compression
|
||||
* Trade size 2-1/2" and larger: Set-screw
|
||||
|
||||
* **Wire:**
|
||||
* Material: Aluminum 100A and larger _---E021 "ALUMINUM FEEDER SCHEDULE" Note 1(b)_
|
||||
* Acceptable Manufacturers: _---Spec 260510-2 (p. 2224)_
|
||||
* Material: Aluminum 1 AWG and larger _---Spec 260510 2.2(C)(1) (p. 2224)_
|
||||
* Acceptable Manufacturers: _---Spec 260510 2.2(D) (p. 2224)_
|
||||
* Encore Wire
|
||||
* General Cable
|
||||
* Okonite
|
||||
@@ -48,69 +50,80 @@ Please confirm you have received this email and respond with any questions or co
|
||||
* Southwire
|
||||
|
||||
* **MC Cable:**
|
||||
* Application: Concealed feeders and branch circuits _---Spec XXXXXX (p. XXXX)_
|
||||
%% Branch homeruns only; Not permitted %%
|
||||
* Acceptable Manufacturers: _---Spec 260510-2 (p. 2224)_
|
||||
* Application: "dry locations only where approved by code authority."
|
||||
_---Spec 260510 2.4(N)(8) (p. 2227)_
|
||||
|
||||
* Acceptable Manufacturers: _---Spec 260510 2.2(E) (p. 2224)_
|
||||
* Alflex
|
||||
* AFC
|
||||
* America Metal Moulding
|
||||
* Encore Wire
|
||||
* Southwire
|
||||
* ==Conductors: Copper _---Spec XXXXXX (p. XXXX)_==
|
||||
* ==Armor: Steel _---Spec XXXXXX (p. XXXX)_==
|
||||
* ==Jacket: PVC _---Spec XXXXXX (p. XXXX)_==
|
||||
|
||||
* **Steel Box Depth:**
|
||||
* Telecom: 2-1/8" _---Spec XXXXXX (p. XXXX)_
|
||||
* Security: 2-1/8" _---Spec XXXXXX (p. XXXX)_
|
||||
* Other Applications: Not specified
|
||||
%% 1-1/2", 2-1/8" %%
|
||||
* **Steel Box Depth:** Not specified _---Spec 260510 2.12(A) (p. 2231)_
|
||||
|
||||
* **Floor Boxes:** Sheet metal with brass or aluminum covers _---Spec XXXXXX (p. XXXX)_
|
||||
* **Floor Boxes:** _---Spec 260510 2.12(E) (p. 2231)_
|
||||
* Box Material:
|
||||
* Slab on grade: Cast iron
|
||||
* Slabs above grade: Stamped steel
|
||||
|
||||
* Cover Material: Not specified.
|
||||
|
||||
* **Wiring Devices:**
|
||||
* Units:
|
||||
* Current rating: Unspecified. Assuming 15A for takeoff.
|
||||
* Standard/Decora: Unspecified. Assuming Toggle/Duplex for takeoff.
|
||||
%% 15A Decora %%
|
||||
* BOH/Common Areas:
|
||||
* Current rating: Unspecified. Assuming 20A for takeoff.
|
||||
* Standard/Decora: Unspecified. Assuming Toggle/Duplex for takeoff.
|
||||
%% 20A Toggle/Duplex %%
|
||||
* All Areas:
|
||||
* Current rating: 20A _---Spec 260510 2.16(B)(1) (p. 2231)_
|
||||
* Standard/Decora: Decora _---Spec 260510 2.16(D) (p. 2231)_
|
||||
|
||||
* **Switchboards:**
|
||||
* Acceptable Manufacturers: _---Spec XXXXXX (p. XXXX)_
|
||||
* ???
|
||||
* Bus Material: ??? _---Spec XXXXXX (p. XXXX)_
|
||||
* Interrupting Current Rating: ???
|
||||
* Bus Material: "aluminum or copper, tin or silver plated" _---Spec 262000 2.6(C)(4) (p. 2297)_
|
||||
* OCPD Interrupting Current Ratings: Not specified.
|
||||
* Acceptable Manufacturers: _---Spec 262000 2.17(C) (p. 2307)_
|
||||
* Eaton
|
||||
* ABB/GE
|
||||
* Schneider Electric
|
||||
* Siemens
|
||||
|
||||
* **Distribution Panelboards:**
|
||||
* Acceptable Manufacturers: _---Spec XXXXXX (p. XXXX)_
|
||||
* ???
|
||||
* Bus Material: ??? _---Spec XXXXXX (p. XXXX)_
|
||||
* Breaker Types: ??? _---Spec XXXXXX (p. XXXX)_
|
||||
%% Snap-on, bolt on %%
|
||||
* Interrupting Current Rating: ???
|
||||
* **Panelboards:**
|
||||
* Bus Material: "silver plated copper or electro-tin plated aluminum"
|
||||
_---Spec 262000 2.8(E) (p. 2303)_
|
||||
|
||||
* Breaker Types: Bolt-on _---Spec 262000 2.9(C) (p. 2303)_
|
||||
|
||||
* **Load Centers:**
|
||||
* Acceptable Manufacturers: _---Spec XXXXXX (p. XXXX)_
|
||||
* ???
|
||||
* Bus Material: ??? _---Spec XXXXXX (p. XXXX)_
|
||||
* Breaker Types: ??? _---Spec XXXXXX (p. XXXX)_
|
||||
%% Snap-on, bolt on %%
|
||||
* Interrupting Current Rating: ???
|
||||
* OCPD Interrupting Current Ratings:
|
||||
* Distribution Panelboards: Not specified.
|
||||
* Lighting and Appliance Panelboards: Not less than 10kAIC
|
||||
_---Spec 262000 2.10(A)(3) (p. 2304)_
|
||||
|
||||
* Acceptable Manufacturers: _---Spec 262000 2.17(C) (p. 2307)_
|
||||
* Eaton
|
||||
* ABB/GE
|
||||
* Schneider Electric
|
||||
* Siemens
|
||||
|
||||
* **Transformers:**
|
||||
* Winding Material: ??? _---Spec XXXXXX (p. XXXX)_
|
||||
* K-Rating: ???
|
||||
%% Windings AL or CU, K-rating %%
|
||||
* Winding Material:
|
||||
"Transformer windings shall be manufacturer's standard design,
|
||||
copper or aluminum conductor. Bussing shall be copper."
|
||||
_---Spec 262002.5(L) (p. 2296)_
|
||||
|
||||
* K-Rating: Only as shown (None shown)
|
||||
_---Spec 262002.5(K) (p. 2295)_
|
||||
|
||||
* **Generator:** (1) 500kW Diesel
|
||||
* Enclosure Specs: ??? _---Dwg. E014_
|
||||
* Remote Tank: ???
|
||||
* Tank Size: ??? _---Spec XXXXXX (p. XXXX)_
|
||||
* Load Banks: ??? _---Spec XXXXXX (p. XXXX)_
|
||||
* Acceptable Manufacturers: _---Spec 263213-3 (p. 2323)_
|
||||
* Acceptable Manufacturers: _---Spec 262000 2.17(D) (p. 2307)_
|
||||
* Eaton
|
||||
* ABB/GE
|
||||
* Heavy Duty
|
||||
* MGM
|
||||
* Siemens
|
||||
* Schneider Electric
|
||||
* United Power Corp
|
||||
|
||||
* **Generator:** (1) 500kW Diesel _---Dwg. E05-12_
|
||||
* Enclosure Specs: Not specified.
|
||||
* Remote Tank: None shown or specified.
|
||||
* Tank Size: 12hrs at full load _---Spec 263213 2.7(C) (p. 2326)_
|
||||
* Load Banks: None shown or specified.
|
||||
* Acceptable Manufacturers: _---Spec 263213 2.1(A) (p. 2323)_
|
||||
* Caterpillar Tractor Co.
|
||||
* Cummins/Power Generation
|
||||
* Kohler Power Systems (MTU Engine Only)
|
||||
@@ -125,28 +138,31 @@ Please confirm you have received this email and respond with any questions or co
|
||||
|
||||
### PDI System Execution Plan
|
||||
|
||||
* **Primaries:**
|
||||
%% Installation only, (9) 6" PVC %%
|
||||
* **Primaries:** Wiring only, duct bank by others.
|
||||
|
||||
* **Secondaries:**
|
||||
*
|
||||
* **Secondaries:** Aluminum bus duct. _---Spec 262000 2.11(D) (p. 2305)_
|
||||
%% PVC UG, GRC Stub-ups, AL %%
|
||||
|
||||
* **Feeders:**
|
||||
PVC UG, EMT OH;
|
||||
Size and material per E05-10 schedule
|
||||
==(Transformer primaries and secondaries all copper)==
|
||||
==(AL 100A and larger,==
|
||||
==transformer primaries and secondaries all copper)==
|
||||
%% PVC UG, EMT OH, AL over 100A, 2% VD %%
|
||||
%% Emergency Feeds MI Cable %%
|
||||
|
||||
* **Unit Subfeeds:** ???
|
||||
* **Unit Subfeeds:** #12 Multi-Circuit MC OH (alternate for voltage drop)
|
||||
%% MC OH AL, VD per Chart on E5.01 %%
|
||||
|
||||
* **Units:**
|
||||
* ???
|
||||
%% [[2026-03-10_13-51-32#Voltage Drop]] %%
|
||||
|
||||
* **==Units==:**
|
||||
* VFCU HVAC
|
||||
* 20A Decora Switches
|
||||
* 20A Decora Receptacles
|
||||
%% 15A Decora, Disposals, T-stat, Floor Boxes, Shade Control, Doorbells, Dimmer Switches, etc. %%
|
||||
|
||||
* **Telecom:**
|
||||
* **Telecom:** Rough-in only
|
||||
* ???
|
||||
%% 42" MSDE, No Cable Homeruns, (1) 1" Back to IDF, CAT6 with Stub-ups %%
|
||||
|
||||
@@ -164,21 +180,24 @@ Please confirm you have received this email and respond with any questions or co
|
||||
|
||||
### Lighting Control
|
||||
|
||||
* **Basis of Takeoff:** ??? _---???_
|
||||
%% Code Minimum per Energy Code Assigned, P&S, PDI Design %%
|
||||
* **Basis of Takeoff:** Central dimming system per P&S, PDR quote.
|
||||
|
||||
* **Area:** _---Dwg. E06-01 "LIGHTING CONTROL NARRATIVE"_
|
||||
*
|
||||
* Units: Master Switch, Digital Standalone Control, 0-10V dimming.
|
||||
* Amenity: Digital Central Control, 0-10V dimming
|
||||
* Garage: Integral dimming occupancy sensors, 120V wiring only.
|
||||
%% Assign Method to Areas: Line Voltage, Low-Voltage Stand Alone or Centralized System %%
|
||||
|
||||
### Tasks/Quotes Needed for WBS
|
||||
|
||||
%% Delete any completed %%
|
||||
|
||||
%%
|
||||
* Electrical Constructability Review
|
||||
* Electrical VDC
|
||||
* Coordination Study
|
||||
* DAS Public Safety Raceway Design
|
||||
%%
|
||||
|
||||
<!--
|
||||
DAS Public Safety Raceway Design is necessary
|
||||
|
||||
Reference in New Issue
Block a user