@@ -57,8 +57,8 @@ it is not cost-effective[^1] to allow it to take four.[^2]
with confidence estimates uncorrupted by [[estimating-culture#Incentives|perverse incentives]],
they may have reasonable basis to set sliding standards for estimate precision
to be specifically determined at consideration of the opportunity for bid
according to current climate (i.e. their risk appetite).
I believe my use of the absolute is still fair.
according to current climate (i.e. their transient risk appetite).
I believe my use of the absolute is still fair:
No contractor is doing that, so they lack a competent measure of risk tolerance
besides continuing to tolerate what they have historically.