vault backup: 2026-01-16 17:27:01
This commit is contained in:
+2
-2
@@ -57,8 +57,8 @@ it is not cost-effective[^1] to allow it to take four.[^2]
|
||||
with confidence estimates uncorrupted by [[estimating-culture#Incentives|perverse incentives]],
|
||||
they may have reasonable basis to set sliding standards for estimate precision
|
||||
to be specifically determined at consideration of the opportunity for bid
|
||||
according to current climate (i.e. their risk appetite).
|
||||
I believe my use of the absolute is still fair.
|
||||
according to current climate (i.e. their transient risk appetite).
|
||||
I believe my use of the absolute is still fair:
|
||||
No contractor is doing that, so they lack a competent measure of risk tolerance
|
||||
besides continuing to tolerate what they have historically.
|
||||
|
||||
|
||||
Reference in New Issue
Block a user