vault backup: 2026-05-14 17:11:12
This commit is contained in:
@@ -0,0 +1,73 @@
|
||||
---
|
||||
id: 2026-05-14T08:19:37-0400
|
||||
title: 2026-05-14 08:19:37
|
||||
tags:
|
||||
- occupational
|
||||
daily: "[[2026-05-14]]"
|
||||
---
|
||||
# 2026-05-14 08:19:37
|
||||
|
||||
## 303 Mariposa Residence Pre-takeoff Confirmation Email Review
|
||||
|
||||
Consultation with [[josh-ford|Josh]]
|
||||
regarding [[pdi-pre-takeoff-confirmation]]
|
||||
for [[303-mariposa-residence]].
|
||||
|
||||
The project being a single family home,
|
||||
primary estimator [[jared-defanti]] requested Josh's aid
|
||||
with precise wording and takeoff assumptions.
|
||||
|
||||
### Questions
|
||||
|
||||
> [!quote] Proposal 2026-05-06
|
||||
> _Telecom, Data & Cable TV _
|
||||
>
|
||||
> 49\. Back boxes and stub ups "As required"
|
||||
|
||||
Josh confirmed we are to exclude backboxes and stub-ups from takeoff.
|
||||
|
||||
### Other Direction
|
||||
|
||||
#### Metal Boxes
|
||||
|
||||
Highlight 12 AWG minimum, metal boxes;
|
||||
add note "please confirm".
|
||||
|
||||
#### PVC Conduit
|
||||
|
||||
Confirmed no PVC except secondaries.
|
||||
Secondaries PVC40 with PVC80 elbow and stub-up.
|
||||
|
||||
#### Project Drawing/Detail Callouts
|
||||
|
||||
Delete section [[conest-pre-takeoff-email-template#Project Drawing/Detail Callouts]]
|
||||
since empty.
|
||||
|
||||
#### Fire Alarm
|
||||
|
||||
Use `TERMINAL CABINET` not `HEAD END`.
|
||||
|
||||
Did not specifically discuss with Josh,
|
||||
but assuming free-air assemblies for devices
|
||||
|
||||
#### Lighting Control
|
||||
|
||||
Confirmed 0-10V/Line voltage dimming per schedule.
|
||||
|
||||
Use "Low voltage" (rough-in only) assemblies
|
||||
|
||||
Note "rough-in only" in email.
|
||||
|
||||
> Josh pointed out dimming receptacles.
|
||||
|
||||
#### Low Voltage
|
||||
|
||||
Add new line:
|
||||
"Shade Control: System is alternate, do we own rough-in?".
|
||||
|
||||
#### Other
|
||||
|
||||
Josh noted that [[conest#ConEst Senior Estimator|seniors]]
|
||||
appreciate the new [[pdi-pre-takeoff-confirmation]] process
|
||||
because they feel more familiar with the job
|
||||
when in [[conest-senior-review]].
|
||||