## Elliot St. ConEst Senior Review
|
||||
|
||||
#occupational
|
||||
|
||||
%%
|
||||
Transcription of notes
|
||||
taken while reviewing Elliot St. with Joel Jansen.
|
||||
%%
|
||||
|
||||
Adorne USB Heating Designation was built with standard device.
|
||||
Subbed for Adorne.
|
||||
|
||||
Subbed standard duplex receptacles in guestrooms for Adorne.
|
||||
|
||||
Confirmed fixture branch length changes
|
||||
including Garage
|
||||
|
||||
Note: It is not usually necessary to count emergency fixtures separately.
|
||||
|
||||
Use minimum 1 hour for tape lights, except in units (minimum 0.5hr).
|
||||
|
||||
Final Pricing adjustments:
|
||||
* Warranty,
|
||||
* CIP (see proposal)
|
||||
|
||||
Added putty pads.
|
||||
|
||||
Fire stopping budget = $25-35 per Unit.
|
||||
|
||||
Robotic Total Station hours: match Structural Foreman.
|
||||
|
||||
For contracts 5--15 million dollars:
|
||||
|
||||
$$
|
||||
\text{Equipment Cost} \approx 1\%
|
||||
$$
|
||||
|
||||
Mid Atlantic: 1 trip per month
|
||||
|
||||
Offsite Parking: see bid sheet
|
||||
|
||||
Project Executive time same as Oversight.
|
||||
|
||||
When calculating durations for indirect labor, round down.
|
||||
|
||||
* Rough Foreman
|
||||
* Trim Foreman
|
||||
* Amenity Foreman
|
||||
|
||||
LV/FA Foreman: get hours from systems quote.
|
||||
|
||||
Fire Alarm, Two-Way Communication, DAS: `Phase` = "Fire Alarm"
|
||||
|
||||
Erroneously used WP GFI's in bathrooms, subbed for Kitchen/Bath assembly.
|
||||