diff --git a/2025-11-13_08-19-01.md b/2025-11-13_08-19-01.md new file mode 100644 index 0000000..2a58cdb --- /dev/null +++ b/2025-11-13_08-19-01.md @@ -0,0 +1,18 @@ +## 2025-11-13 ??:??:?? + +#occupational + +### Questions for Bid Estimators + +Questions for [[pdi-estimating#Bid Estimating|PDI Bid Estimators]]. + +#### Exclusions + +When we send proposals with significant exclusions +(no lighting control, no demo, no submetering, +even when designed and shown on drawings): + +Is there a conversation happening with our customers +before they receive our proposal? + +Is it clear they understand what we're excluding? \ No newline at end of file diff --git a/2026-01-12_13-02-01.md b/2026-01-12_13-02-01.md new file mode 100644 index 0000000..afe2e68 --- /dev/null +++ b/2026-01-12_13-02-01.md @@ -0,0 +1,20 @@ +# 2026-01-12 13:02:?? + +#occupational + +Joel attributes the [[#GP Variance|apparent variance]] to +1. missed Polaris lugs for feeders for one building, +2. insufficient budget for equipment rental, and +3. upfront costs already paid (construction is 50% complete). + +He also said that operations accused ConEst +of providing insufficient length for subfeeds, +which he said was true, +but not to the extent accused +(only ~600ft missed total). + +The award WBS shows $32,382 for equipment rental + +I'm dubious of all these explanations, +but I don't have another one. +I can't find the ConEst folder or Accubid file. diff --git a/timestamped/2025-11-13_08-19-00.md b/timestamped/2025-11-13_08-19-00.md index d92a9f9..4623cc9 100644 --- a/timestamped/2025-11-13_08-19-00.md +++ b/timestamped/2025-11-13_08-19-00.md @@ -25,21 +25,4 @@ where instrumental methods are presented as if they were realist, causing confusion when the methods are, as judged from a realist perspective, wrong. -## 2025-11-13 ??:??:?? - -#occupational - -### Questions for Bid Estimators - -Questions for [[pdi-estimating#Bid Estimating|PDI Bid Estimators]]. - -#### Exclusions - -When we send proposals with significant exclusions -(no lighting control, no demo, no submetering, -even when designed and shown on drawings): - -Is there a conversation happening with our customers -before they receive our proposal? - -Is it clear they understand what we're excluding? \ No newline at end of file +[[2025-11-13_08-19-01]] \ No newline at end of file diff --git a/timestamped/2026-01-12_13-02-00.md b/timestamped/2026-01-12_13-02-00.md index 28379b1..3c02530 100644 --- a/timestamped/2026-01-12_13-02-00.md +++ b/timestamped/2026-01-12_13-02-00.md @@ -10,24 +10,3 @@ dg-publish: true **Dry utilities:** utilities other than "wet" utilities (water, sewer, stormwater), namely power, data, and natural gas. - -# 2026-01-12 13:02:?? - -#occupational - -Joel attributes the [[#GP Variance|apparent variance]] to -1. missed Polaris lugs for feeders for one building, -2. insufficient budget for equipment rental, and -3. upfront costs already paid (construction is 50% complete). - -He also said that operations accused ConEst -of providing insufficient length for subfeeds, -which he said was true, -but not to the extent accused -(only ~600ft missed total). - -The award WBS shows $32,382 for equipment rental - -I'm dubious of all these explanations, -but I don't have another one. -I can't find the ConEst folder or Accubid file.