# The Purpose of Estimating
|
||||
|
||||
%% TODO: The content of this note is likely better put elsewhere %%
|
||||
|
||||
## The Purpose of Construction Cost Estimation
|
||||
|
||||
The purpose of [[construction-estimating]] in practice
|
||||
@@ -10,25 +12,33 @@ which would take far longer than allotted for bid,
|
||||
|
||||
* Determine feasibility of functional requirements
|
||||
|
||||
### Type 2 Owners
|
||||
|
||||
For some owners, money is no object,
|
||||
and standardization is far more important
|
||||
than any potential construction savings.
|
||||
|
||||
These owners can be expected to decline every [[value-engineering]] option offered
|
||||
(see [[gold-plating]]).
|
||||
> [!info] Type 2 Owners
|
||||
> For some owners, money is no object,
|
||||
> and standardization is far more important
|
||||
> than any potential construction savings.
|
||||
>
|
||||
> These owners can be expected to decline every [[value-engineering]] option offered
|
||||
> (see [[gold-plating]]).
|
||||
|
||||
## For the Contractor
|
||||
|
||||
* Make profit to meet growth target
|
||||
* Secure work for current and projected employees (fill backlog)
|
||||
|
||||
%% TODO: "Determine the sale price of a service" %%
|
||||
|
||||
> [!aside]
|
||||
> I take increasing issue with the common model
|
||||
> of measuring operational success by negative overrun,
|
||||
> as it is incompatible with the preferable target of estimate certainty.
|
||||
|
||||
### The Role of the Estimator
|
||||
|
||||
The role of the estimator is to model the potential cost distribution of the project,
|
||||
taking actions to reduce the model's uncertainty.
|
||||
The progress of the estimator can be measured by $\frac{d\sigma}{dt}$
|
||||
|
||||
The effect of estimating methods can be represented as $d\sigma$,
|
||||
thus efficiency is $\frac{d\sigma}{dt}$.
|
||||
|
||||
### The Role of the Executive
|
||||
|
||||
|
||||