@@ -41,7 +41,7 @@ Use empty designations to separate phases.
|
||||
| Fixture Type | Labor |
|
||||
| ------------ | ------------ |
|
||||
| Paddle Fan | 1.5 hrs/ea |
|
||||
| Pendant | 1-4 hrs/ea |
|
||||
| Pendant | 1-4 hrs/ea |
|
||||
| Strip/Cove | 0.083 hrs/ft |
|
||||
| Site Poles | 1.5 hrs/ea |
|
||||
| Festoon | 2 hrs/ea |
|
||||
@@ -51,7 +51,7 @@ Use empty designations to separate phases.
|
||||
|
||||
| Case | Standard Length |
|
||||
| --------------------- | --------------- |
|
||||
| Site/Courtyard | 50ft |
|
||||
| Site/Courtyard | 50ft |
|
||||
| Garage | 50ft |
|
||||
| BOH | 40ft |
|
||||
| Corridors | 40ft |
|
||||
@@ -221,7 +221,7 @@ Create its own breakout in WBS, and phase in Accubid
|
||||
| Bollard | `COURTYARDS & LANDSCAPE`/`BOLLARD, 3/4" CONDUIT - PVC40 - ...`[^1] |
|
||||
| Up-light | `COURTYARDS & LANDSCAPE`/`PERMA POST, 3/4" CONDUIT - PVC40 - ...` |
|
||||
| In-grade up-light | `COURTYARDS & LANDSCAPE`/`3/4" CONDUIT - PVC40, IMC Elbow, ...` |
|
||||
| Fixtures built into cabanas/pergolas | `COURTYARDS & LANDSCAPE`/`ALUM BOX W/ FLEX FIX, 3/4" CONDUIT - PVC40 - ...` |
|
||||
| Fixtures built into cabanas/pergolas | `COURTYARDS & LANDSCAPE`/`ALUM BOX W/ FLEX FIX, 3/4" CONDUIT - PVC40 - ...` |
|
||||
| Handrail light | `COURTYARDS & LANDSCAPE`/`ALUM BOX W/ FLEX FIX, 3/4" CONDUIT - PVC40, IMC ELBOW - ...` |
|
||||
|
||||
[^1]: If we don't own concrete, delete Pre-cast bollard base from assembly
|
||||
|
||||