vault backup: 2025-08-05 17:00:05

This commit is contained in:
2025-08-05 17:00:05 -04:00
parent b8116221b7
commit 89b1ac60b9
33 changed files with 380 additions and 1381 deletions
+34 -1
View File
@@ -2,7 +2,8 @@
id: feeders
aliases: []
tags:
- systems/feeders
- occupational
- occupational/systems/feeders
---
# Feeders
@@ -84,4 +85,36 @@ Provide sleeves for all feeder conduits passing through floors.
* M = Metal => Wood Frame
* Round 1" to 2"
#### Grounding
This is intended to cover electrical and telecom grounding.
##### System Grounding
> Area: "01 - Feeders/Risers Building"
`COMMON ASSEMBLIES`/`GROUNDING`/`GND = #3/0 & 1" CONDUIT - EMT`
* Length: Measure around the main electrical rooms to stacked
* Count: Total number of electrical rooms
`COMMON ASSEMBLIES`/`GROUNDING`/`(3) ... x 10' CU CLAD GRD ROD & 4"X12" GND BAR`
* Count: 1
##### Riser
> Area: "Typical - Building All Electrical Riser Rooms"
`COMMON ASSEMBLIES`/`GROUNDING`/`GND = #3/0 & 1" CONDUIT - EMT`
* Length: 15
* Count: 1
##### Telecom Ground Bridge
Use only where shown.
`COMMON ASSEMBLIES`/`GROUNDING`/`TELE/DATA GND BRIDGE, ..., W/ COVER & (60') #6 THHN GREEN`
### 3. Extension (Review and Checking)