# 2026-01-08 13:33:34
|
||||
|
||||
### 2100 Crystal Drive Takeoff Review
|
||||
## 2100 Crystal Drive Takeoff Review
|
||||
|
||||
#### Generators
|
||||
[[2100-crystal-drive]]
|
||||
|
||||
### Generators
|
||||
|
||||
> [!failure]
|
||||
> Generators were erroneously broken down in switchgear.
|
||||
|
||||
[[switchgear-takeoff#Generator|Generator]]
|
||||
|
||||
#### Switchgear
|
||||
### Switchgear
|
||||
|
||||
Switchgear cost comp
|
||||
"\\EgnyteDrive\Shared\Estimating\11 Bid Estimating Spreadsheets\Switchgear Pricing Tool Version 2 (2.02.2024) (Template) - Copy.xls"
|
||||
@@ -26,7 +28,7 @@ Includes
|
||||
* submetering
|
||||
* coordination study
|
||||
|
||||
#### Composite Cleanup
|
||||
### Composite Cleanup
|
||||
|
||||
1 day per week
|
||||
|
||||
@@ -37,13 +39,13 @@ $$
|
||||
> It occurs to me I don't know all the rules of our calendar
|
||||
> [Gregorian calendar - Wikipedia](https://en.wikipedia.org/wiki/Gregorian_calendar)
|
||||
|
||||
#### Temp Power
|
||||
### Temp Power
|
||||
|
||||
$10,000 per [[heavy-equipment#Swing Stage Scaffolding|swing stage]]
|
||||
|
||||
[[temp-power-takeoff]]
|
||||
|
||||
#### Unit Typicals
|
||||
### Unit Typicals
|
||||
|
||||
I asked Joel about using unit typicals as described in
|
||||
[[2025-12-19_10-44-01]].
|
||||
|
||||