@@ -1,24 +1,28 @@
---
id:
id: 2026-01-09T10:00:03
aliases: []
title:
title: 2026-01-09 10:00:03
tags:
- type/timestamped
dg-publish: true
---
# 2026-01-09 10:00:03
### 2100 Crystal Drive
## 2100 Crystal Drive Closeout
[[2100-crystal-drive]]
### Extension
`#600 ? WHITE ?` had incorrect sort codes.
#### Lighting Control
### Lighting Control
I took off lighting per plans (E510)
in spite of proposal stating "local control".
Will have to be changed.
#### Labor Factor
### Labor Factor
Fire Alarm
Switchgear
@@ -29,7 +33,7 @@ Amenity
Retail
Units
#### Fixtures
### Fixtures
> [!failure]
> Several fixtures were erroneously based on NM cable.
@@ -38,16 +42,16 @@ I built some fixtures with \#12/3 in areas with emergency lighting
to be an unswitched hot.
Joel is having me change them to \#12/2.
#### Units
### Units
> [!failure]
> One unit type typical was missing `Area` quantities.
> Another had no takeoff.
#### Labor Plan
### Labor Plan
$$
\mathbb{E}\left[\frac{\text{Hours Per Unit}}{\text{Openings Per Unit}}\right] \approx .75~\text{Hours Per Opening}
$$
High Rise .110--.120 hr/sqft
High Rise .110--.120 hr/sqft