@@ -54,7 +54,7 @@ polymer concrete enclosure
Alternative
1. `COMMON ASSEMBLIES`/`POLES / EXCAVATION / CORING / UG PULL BX`/`MANHOLES / PULL BOXES / EXCAVATION / CONCRETE`/...
1. `COMMON ASSEMBLIES`/`POLES / EXCAVATION / CORING / UG PULL BX`/`MANHOLES / PULL BOXES / EXCAVATION / CONCRETE`/`QUAZITE UG PULL BOXES`/...
## Backbone Riser
@@ -113,12 +113,14 @@ Alternative
## Devices
As shown on plans. Ignore floor boxes, other electrical scope.
As shown on plans.
Ignore scope shared with [[electrical-takeoff|electrical]].
(e.g. floor boxes)
1. `COMMON ASSEMBLIES`/`TELECOM SYSTEMS`/...
* .../`BOH / AMENITY ASSEMBLIES`
* .../`SCREWLESS DECORA COVERS UNITS / BOH`
* .../`ROUGH IN ASSY`
If system is included, take off _both_ rough-in and device assemblies
If _system_ is included, take off _both_ rough-in and device assemblies
in amenity areas.