Hello Team,
|
||||
|
||||
Below is a comprehensive list of means & methods for Charlotte South End Hotel.
|
||||
Please confirm you have received this email and respond with any questions or comments.
|
||||
Below is a comprehensive list of means & methods
|
||||
for **Charlotte South End Hotel**.
|
||||
Please confirm you have received this email
|
||||
and respond with any questions or comments.
|
||||
|
||||
* **Delivery Method:** Plans & Specs
|
||||
* **Document Stage:** Issue for Permit
|
||||
@@ -52,7 +54,7 @@ Please confirm you have received this email and respond with any questions or co
|
||||
* **MC Cable:**
|
||||
* Application: "dry locations only where approved by code authority."
|
||||
_---Spec 260510 2.4(N)(8) (p. 2227)_
|
||||
|
||||
|
||||
* Acceptable Manufacturers: _---Spec 260510 2.2(E) (p. 2224)_
|
||||
* Alflex
|
||||
* AFC
|
||||
@@ -66,7 +68,7 @@ Please confirm you have received this email and respond with any questions or co
|
||||
* Box Material:
|
||||
* Slab on grade: Cast iron
|
||||
* Slabs above grade: Stamped steel
|
||||
|
||||
|
||||
* Cover Material: Not specified.
|
||||
|
||||
* **Wiring Devices:**
|
||||
@@ -86,14 +88,14 @@ Please confirm you have received this email and respond with any questions or co
|
||||
* **Panelboards:**
|
||||
* Bus Material: "silver plated copper or electro-tin plated aluminum"
|
||||
_---Spec 262000 2.8(E) (p. 2303)_
|
||||
|
||||
|
||||
* Breaker Types: Bolt-on _---Spec 262000 2.9(C) (p. 2303)_
|
||||
|
||||
|
||||
* OCPD Interrupting Current Ratings:
|
||||
* Distribution Panelboards: Not specified.
|
||||
* Lighting and Appliance Panelboards: Not less than 10kAIC
|
||||
_---Spec 262000 2.10(A)(3) (p. 2304)_
|
||||
|
||||
|
||||
* Acceptable Manufacturers: _---Spec 262000 2.17(C) (p. 2307)_
|
||||
* Eaton
|
||||
* ABB/GE
|
||||
@@ -108,7 +110,7 @@ Please confirm you have received this email and respond with any questions or co
|
||||
|
||||
* K-Rating: Only as shown (None shown)
|
||||
_---Spec 262002.5(K) (p. 2295)_
|
||||
|
||||
|
||||
* Acceptable Manufacturers: _---Spec 262000 2.17(D) (p. 2307)_
|
||||
* Eaton
|
||||
* ABB/GE
|
||||
@@ -138,72 +140,88 @@ Please confirm you have received this email and respond with any questions or co
|
||||
|
||||
### PDI System Execution Plan
|
||||
|
||||
* **Primaries:** Wiring only, duct bank by others.
|
||||
* **Primaries:** Conduit only; wiring, duct bank by others.
|
||||
|
||||
* **Secondaries:** Aluminum bus duct. _---Spec 262000 2.11(D) (p. 2305)_
|
||||
%% PVC UG, GRC Stub-ups, AL %%
|
||||
|
||||
* **Feeders:**
|
||||
PVC UG, EMT OH;
|
||||
PVC UG, EMT OH.
|
||||
Size and material per E05-10 schedule
|
||||
==(AL 100A and larger,==
|
||||
==transformer primaries and secondaries all copper)==
|
||||
(AL 100A and larger,
|
||||
==transformer primaries and secondaries all copper==).
|
||||
Voltage drop not considered
|
||||
(allowance per E00-00, "GENERAL PRICING NOTES").
|
||||
%% PVC UG, EMT OH, AL over 100A, 2% VD %%
|
||||
%% Emergency Feeds MI Cable %%
|
||||
|
||||
* **Unit Subfeeds:** #12 Multi-Circuit MC OH (alternate for voltage drop)
|
||||
* **Unit Subfeeds:**
|
||||
#12 Multi-Circuit MC OH.
|
||||
Voltage drop not considered
|
||||
(allowance per E00-00, "GENERAL PRICING NOTES").
|
||||
%% MC OH AL, VD per Chart on E5.01 %%
|
||||
|
||||
%% [[2026-03-10_13-51-32#Voltage Drop]] %%
|
||||
|
||||
* **==Units==:**
|
||||
* **Units:**
|
||||
* VFCU HVAC
|
||||
* 20A Decora Switches
|
||||
* 20A Decora Receptacles
|
||||
* Master Switch control
|
||||
* Floor boxes (0--1 per K, QQ unit; 2 per 2B, 3B unit)
|
||||
%% 15A Decora, Disposals, T-stat, Floor Boxes, Shade Control, Doorbells, Dimmer Switches, etc. %%
|
||||
|
||||
* **Telecom:** Rough-in only
|
||||
* ???
|
||||
%% 42" MSDE, No Cable Homeruns, (1) 1" Back to IDF, CAT6 with Stub-ups %%
|
||||
* **Telecom:**
|
||||
Rough-in only, system alternate.
|
||||
Free-air where allowed by code.
|
||||
EMT Risers.
|
||||
|
||||
* **EV Chargers:** ???
|
||||
* **EV Chargers:** Excluded (alternate).
|
||||
%% (42) Conduit only, (56) Conduit & Wire, (20) Conduit, Wire & Equipment %%
|
||||
%% [[2026-03-10_13-51-32#EV Chargers]] %%
|
||||
|
||||
* **Fire Alarm:** ???
|
||||
%% Free-air where allowed by code. EMT Risers. %%
|
||||
* **Fire Alarm:**
|
||||
Free-air where allowed by code.
|
||||
EMT Risers.
|
||||
|
||||
* **DAS:** ???
|
||||
%% Conduit only, Per PDI DAS Design %%
|
||||
* **DAS:**
|
||||
Rough-in only, per PDI DAS Design.
|
||||
|
||||
* **Low Voltage:** Free-air where allowed by code.
|
||||
%% Free-air where allowed by code. Stub-ups to accessible ceilings. %%
|
||||
* **Low Voltage:**
|
||||
Free-air where allowed by code.
|
||||
Stub-ups to accessible ceilings.
|
||||
|
||||
### Lighting Control
|
||||
|
||||
%% [[2026-03-10_13-51-32#Lighting Control]] %%
|
||||
|
||||
* **Applicable Code:**
|
||||
2024 North Carolina Energy Conservation Code
|
||||
(2021 IECC with NC Amendments)
|
||||
_---Dwg. G00-11_
|
||||
|
||||
* **Basis of Takeoff:** Central dimming system per P&S, PDR quote.
|
||||
|
||||
* **Area:** _---Dwg. E06-01 "LIGHTING CONTROL NARRATIVE"_
|
||||
* **By Area:**
|
||||
* Units: Master Switch, Digital Standalone Control, 0-10V dimming.
|
||||
* Amenity: Digital Central Control, 0-10V dimming
|
||||
* Garage: Integral dimming occupancy sensors, 120V wiring only.
|
||||
* Amenity: Digital Central Control, 0-10V dimming.
|
||||
* Corridors: 0-10V dimming per 2021 IECC and LEED checklist.
|
||||
* BOH: Line voltage control.
|
||||
* Garage: Line voltage control (integral dimming occupancy sensors).
|
||||
%% Assign Method to Areas: Line Voltage, Low-Voltage Stand Alone or Centralized System %%
|
||||
|
||||
### Tasks/Quotes Needed for WBS
|
||||
|
||||
%% Delete any completed %%
|
||||
%%
|
||||
Only tasks that are not already open.
|
||||
%%
|
||||
|
||||
* DAS Public Safety Raceway Design
|
||||
%% Necessary because we own DAS pathways but not the system %%
|
||||
|
||||
%%
|
||||
* Electrical Constructability Review
|
||||
* Electrical VDC
|
||||
* Coordination Study
|
||||
* DAS Public Safety Raceway Design
|
||||
%%
|
||||
|
||||
<!--
|
||||
DAS Public Safety Raceway Design is necessary
|
||||
if we own DAS pathways but not the system,
|
||||
since if we own the system,
|
||||
the raceway design will be included in the Systems quote.
|
||||
-->
|
||||
|
||||
Thank you,
|
||||
|
||||