vault backup: 2026-03-11 17:25:16

This commit is contained in:
2026-03-11 17:25:16 -04:00
parent 6b559691de
commit 96a59fe03a
179 changed files with 345 additions and 546 deletions
+56 -38
View File
@@ -6,7 +6,7 @@ tags:
- authorship/original
- destiny/permanent
- status/draft
- type/timestamped
- type/periodic/timestamped
daily: "[[2026-03-09]]"
date-created: 2026-03-09T15:50:49-04:00
dg-publish: true
@@ -21,8 +21,10 @@ yearly: "[[2026]]"
Hello Team,
Below is a comprehensive list of means & methods for Charlotte South End Hotel.
Please confirm you have received this email and respond with any questions or comments.
Below is a comprehensive list of means & methods
for **Charlotte South End Hotel**.
Please confirm you have received this email
and respond with any questions or comments.
* **Delivery Method:** Plans & Specs
* **Document Stage:** Issue for Permit
@@ -52,7 +54,7 @@ Please confirm you have received this email and respond with any questions or co
* **MC Cable:**
* Application: "dry locations only where approved by code authority."
_---Spec 260510 2.4(N)(8) (p. 2227)_
* Acceptable Manufacturers: _---Spec 260510 2.2(E) (p. 2224)_
* Alflex
* AFC
@@ -66,7 +68,7 @@ Please confirm you have received this email and respond with any questions or co
* Box Material:
* Slab on grade: Cast iron
* Slabs above grade: Stamped steel
* Cover Material: Not specified.
* **Wiring Devices:**
@@ -86,14 +88,14 @@ Please confirm you have received this email and respond with any questions or co
* **Panelboards:**
* Bus Material: "silver plated copper or electro-tin plated aluminum"
_---Spec 262000 2.8(E) (p. 2303)_
* Breaker Types: Bolt-on _---Spec 262000 2.9(C) (p. 2303)_
* OCPD Interrupting Current Ratings:
* Distribution Panelboards: Not specified.
* Lighting and Appliance Panelboards: Not less than 10kAIC
_---Spec 262000 2.10(A)(3) (p. 2304)_
* Acceptable Manufacturers: _---Spec 262000 2.17(C) (p. 2307)_
* Eaton
* ABB/GE
@@ -108,7 +110,7 @@ Please confirm you have received this email and respond with any questions or co
* K-Rating: Only as shown (None shown)
_---Spec 262002.5(K) (p. 2295)_
* Acceptable Manufacturers: _---Spec 262000 2.17(D) (p. 2307)_
* Eaton
* ABB/GE
@@ -138,72 +140,88 @@ Please confirm you have received this email and respond with any questions or co
### PDI System Execution Plan
* **Primaries:** Wiring only, duct bank by others.
* **Primaries:** Conduit only; wiring, duct bank by others.
* **Secondaries:** Aluminum bus duct. _---Spec 262000 2.11(D) (p. 2305)_
%% PVC UG, GRC Stub-ups, AL %%
* **Feeders:**
PVC UG, EMT OH;
PVC UG, EMT OH.
Size and material per E05-10 schedule
==(AL 100A and larger,==
==transformer primaries and secondaries all copper)==
(AL 100A and larger,
==transformer primaries and secondaries all copper==).
Voltage drop not considered
(allowance per E00-00, "GENERAL PRICING NOTES").
%% PVC UG, EMT OH, AL over 100A, 2% VD %%
%% Emergency Feeds MI Cable %%
* **Unit Subfeeds:** #12 Multi-Circuit MC OH (alternate for voltage drop)
* **Unit Subfeeds:**
#12 Multi-Circuit MC OH.
Voltage drop not considered
(allowance per E00-00, "GENERAL PRICING NOTES").
%% MC OH AL, VD per Chart on E5.01 %%
%% [[2026-03-10_13-51-32#Voltage Drop]] %%
* **==Units==:**
* **Units:**
* VFCU HVAC
* 20A Decora Switches
* 20A Decora Receptacles
* Master Switch control
* Floor boxes (0--1 per K, QQ unit; 2 per 2B, 3B unit)
%% 15A Decora, Disposals, T-stat, Floor Boxes, Shade Control, Doorbells, Dimmer Switches, etc. %%
* **Telecom:** Rough-in only
* ???
%% 42" MSDE, No Cable Homeruns, (1) 1" Back to IDF, CAT6 with Stub-ups %%
* **Telecom:**
Rough-in only, system alternate.
Free-air where allowed by code.
EMT Risers.
* **EV Chargers:** ???
* **EV Chargers:** Excluded (alternate).
%% (42) Conduit only, (56) Conduit & Wire, (20) Conduit, Wire & Equipment %%
%% [[2026-03-10_13-51-32#EV Chargers]] %%
* **Fire Alarm:** ???
%% Free-air where allowed by code. EMT Risers. %%
* **Fire Alarm:**
Free-air where allowed by code.
EMT Risers.
* **DAS:** ???
%% Conduit only, Per PDI DAS Design %%
* **DAS:**
Rough-in only, per PDI DAS Design.
* **Low Voltage:** Free-air where allowed by code.
%% Free-air where allowed by code. Stub-ups to accessible ceilings. %%
* **Low Voltage:**
Free-air where allowed by code.
Stub-ups to accessible ceilings.
### Lighting Control
%% [[2026-03-10_13-51-32#Lighting Control]] %%
* **Applicable Code:**
2024 North Carolina Energy Conservation Code
(2021 IECC with NC Amendments)
_---Dwg. G00-11_
* **Basis of Takeoff:** Central dimming system per P&S, PDR quote.
* **Area:** _---Dwg. E06-01 "LIGHTING CONTROL NARRATIVE"_
* **By Area:**
* Units: Master Switch, Digital Standalone Control, 0-10V dimming.
* Amenity: Digital Central Control, 0-10V dimming
* Garage: Integral dimming occupancy sensors, 120V wiring only.
* Amenity: Digital Central Control, 0-10V dimming.
* Corridors: 0-10V dimming per 2021 IECC and LEED checklist.
* BOH: Line voltage control.
* Garage: Line voltage control (integral dimming occupancy sensors).
%% Assign Method to Areas: Line Voltage, Low-Voltage Stand Alone or Centralized System %%
### Tasks/Quotes Needed for WBS
%% Delete any completed %%
%%
Only tasks that are not already open.
%%
* DAS Public Safety Raceway Design
%% Necessary because we own DAS pathways but not the system %%
%%
* Electrical Constructability Review
* Electrical VDC
* Coordination Study
* DAS Public Safety Raceway Design
%%
<!--
DAS Public Safety Raceway Design is necessary
if we own DAS pathways but not the system,
since if we own the system,
the raceway design will be included in the Systems quote.
-->
Thank you,