From 980e0daa07e5cf2618fad1f2ccf24c572434355d Mon Sep 17 00:00:00 2001 From: Zane Meyers Date: Thu, 18 Sep 2025 15:59:27 -0400 Subject: [PATCH] vault backup: 2025-09-18 15:59:26 --- .../plugins/recent-files-obsidian/data.json | 28 +++++------ full-takeoff.md | 3 +- pre-takeoff-confirmation.md | 49 +++++++++++++++++++ 3 files changed, 65 insertions(+), 15 deletions(-) create mode 100644 pre-takeoff-confirmation.md diff --git a/.obsidian/plugins/recent-files-obsidian/data.json b/.obsidian/plugins/recent-files-obsidian/data.json index 04a628f..d6528ba 100644 --- a/.obsidian/plugins/recent-files-obsidian/data.json +++ b/.obsidian/plugins/recent-files-obsidian/data.json @@ -1,13 +1,25 @@ { "recentFiles": [ { - "basename": "subfeeds", - "path": "subfeeds.md" + "basename": "pre-takeoff-confirmation", + "path": "pre-takeoff-confirmation.md" }, { "basename": "full-takeoff", "path": "full-takeoff.md" }, + { + "basename": "README", + "path": "README.md" + }, + { + "basename": "breakdowns", + "path": "breakdowns.md" + }, + { + "basename": "subfeeds", + "path": "subfeeds.md" + }, { "basename": "assembly-philosophy", "path": "assembly-philosophy.md" @@ -20,10 +32,6 @@ "basename": "automating-estimating-project-creation", "path": "automating-estimating-project-creation.md" }, - { - "basename": "README", - "path": "README.md" - }, { "basename": "project-setup", "path": "project-setup.md" @@ -191,14 +199,6 @@ { "basename": "supertopics", "path": "supertopics.md" - }, - { - "basename": "switchgear", - "path": "switchgear.md" - }, - { - "basename": "telecom", - "path": "telecom.md" } ], "omittedPaths": [], diff --git a/full-takeoff.md b/full-takeoff.md index 9bb2473..7c86fd8 100644 --- a/full-takeoff.md +++ b/full-takeoff.md @@ -15,7 +15,8 @@ tags: ### 1. Estimate preparation -Complete [[project-setup]]. +1. [[project-setup]] +2. [[pre-takeoff-confirmation]] ### 2. Takeoff diff --git a/pre-takeoff-confirmation.md b/pre-takeoff-confirmation.md new file mode 100644 index 0000000..bd262ea --- /dev/null +++ b/pre-takeoff-confirmation.md @@ -0,0 +1,49 @@ +# Pre-Takeoff Confirmation + +The purpose of the pre-takeoff confirmation +is to address potential discrepancies +between the requirements of the project documents +and the scope included in the bid team's proposed price. + +Below is an example provided by Joel Jansen 2025-09-18 + +> [!example] +> Good morning, +> +> Please see below and confirm the documents we plan to use while we takeoff Alta Watkins are correct. +> +> * Plans & Specs, +> * Drawings: GMP, 2025-09-11 +> * Project Manual: GMP Specifications, 2025-09-11 +> * Proposal: 2025-07-03 +> +> Also, please confirm: +> +> 1. Are there any variations from the drawings that we need to include in our takeoff? +> 2. Any accepted/pending alternates? +> 3. We are currently taking off **Full Take Off**. +> 4. Feeders/Subfeeds will be per Schedule on drawings (AL +100 A). +> +> * Feeders -- PVC UG, EMT OH. +> * Subfeeds -- MC for metal stud units, SER all other units. +> * VD -- As shown for subfeeds, 2% Feeders +> +> Units: +> * Devices -- Standard Duplex/Toggle +> * USB Rec -- As shown, plus 1 per bedroom (Type A & C). +> * Studs -- Metal in M units, Wood all other locations. +> * Telecom -- 30" UDP, CAT6. (use 28" in takeoff) +> * Smoke Det -- 120V +> +> Fire Alarm: +> * Pathways: Free Air +> * 2Way: Included +> +> Electrical: +> * Devices: Decora Amenities, Duplex/Toggle BOH +> +> Fixtures: +> * Cable: LV in Amenity Areas +> * Occupancy Sensor: Local +> +> Thank you,