Also "single-point estimation" as opposed to the standard three-point.
|
||||
|
||||
"Traditional estimating methods" as referenced frequently in this notebook
|
||||
are those
|
||||
"Traditional estimating methods" as referenced frequently in [[this notebook]]
|
||||
are those [[construction-estimating]] methods that produce:
|
||||
|
||||
* an exhaustive and specific bill of materials
|
||||
* a single definitive final price for each bid item
|
||||
* an exhaustive and specific bill of material
|
||||
* a single definitive final price for each bid item
|
||||
|
||||