vault backup: 2026-05-12 17:00:33
This commit is contained in:
@@ -6,12 +6,10 @@ daily: "[[2026-01-02]]"
|
||||
---
|
||||
# 2026-01-02 10:10:18
|
||||
|
||||
### Harborside Plaza 4
|
||||
### Harborside Plaza 4 TODO
|
||||
|
||||
%% [[harborside-plaza-4]]
|
||||
TODO list for [[harborside-plaza-4]]
|
||||
|
||||
#### TODO
|
||||
|
||||
* [ ] [[electrical-takeoff|Electrical]]
|
||||
* [x] [[electrical-takeoff|Electrical]]
|
||||
* [x] [[telecom-takeoff#Backbone Riser|Telecom Backbone]]
|
||||
* [x] [[distributed-antenna-systems-takeoff|DAS]]
|
||||
|
||||
@@ -23,7 +23,7 @@ that there must be some limit to the logic of "covering it",
|
||||
since it is always within our power to add contingency,
|
||||
and especially because---if anything---
|
||||
I feel that our procedures tend towards
|
||||
the upper end of reasonable ECI.
|
||||
the _upper_ end of reasonable ECI.
|
||||
(see [[value-of-information.jpg]])
|
||||
|
||||
My response was not well formulated.
|
||||
|
||||
@@ -34,11 +34,11 @@ Type I and II construction.
|
||||
> otherwise use PVC if possible.
|
||||
|
||||
> [!important]
|
||||
> Note that MC cable may be forbidden for this application.
|
||||
>
|
||||
> > [!quote] Hampton Roads Navy UH - Newport News, Project Specifications
|
||||
> > MC cable shall not be allowed for wiring to mechanical equipment
|
||||
> > except for within the dwelling units.
|
||||
> Note that MC cable may be forbidden for this application.[^1]
|
||||
|
||||
[^1]: > [!quote] [[hampton-roads-navy_newport-news|Hampton Roads Navy UH - Newport News]], Project Specifications
|
||||
> MC cable shall not be allowed for wiring to mechanical equipment
|
||||
> except for within the dwelling units.
|
||||
|
||||
### EMT Connections
|
||||
|
||||
|
||||
@@ -15,9 +15,8 @@ each with 12 isolated bays.
|
||||
The buildings are about 70ft long,
|
||||
with all runs less than 100ft.
|
||||
|
||||
I asked [[joel-jansen]] if it would be necessary
|
||||
I asked [[joel-jansen|Joel]] if it would be necessary
|
||||
to use minimum 10 AWG
|
||||
as is [[conest|ConEst]] standard
|
||||
for [[pdi-breakdowns#Bid Item Garage|Garage]].
|
||||
as is [[conest|ConEst]] standard for [[pdi-breakdowns#Bid Item Garage|Garage]].
|
||||
He said it would not be,
|
||||
and confirmed 12 AWG is acceptable in this case.
|
||||
|
||||
@@ -12,11 +12,16 @@ Direction from [[joel-jansen|Joel]]
|
||||
|
||||
[[telecom-takeoff#Corridor Conduit (IDF to Unit MSDE)]]
|
||||
|
||||
It is acceptable to use a weighted average length
|
||||
It is acceptable to use a weighted average of subfeed length
|
||||
in a "Typical - All Units"
|
||||
in lieu of individual takeoffs per floor.
|
||||
|
||||
## Unit Condensing Units
|
||||
|
||||
[[electrical-takeoff#Unit Condensing Units]]
|
||||
For [[electrical-takeoff#Unit Condensing Units|unit CU takeoff]], in most cases
|
||||
the horizontal length should **not** be the subfeed length,
|
||||
but the distance from the unit panel to the indoor unit.
|
||||
|
||||
This assumes the riser can be routed up an interior wall,
|
||||
rather than a single chase for all units (worst case)
|
||||
assumed by the subfeed length heuristic.
|
||||
|
||||
@@ -0,0 +1,148 @@
|
||||
---
|
||||
id: 2026-05-12T09:15:34-0400
|
||||
title: 2026-05-12 09:15:34
|
||||
tags: []
|
||||
daily: "[[2026-05-12]]"
|
||||
---
|
||||
# 2026-05-12 09:15:34
|
||||
|
||||
## Hilltop Gardens Review and Closeout
|
||||
|
||||
[[conest-senior-review]] and [[conest-manager-review]]
|
||||
for [[hilltop-gardens]]
|
||||
with [[josh-ford]] filling in for [[joel-jansen|Joel]].
|
||||
|
||||
### Florida Considerations
|
||||
|
||||
#### Building Codes
|
||||
|
||||
8th Edition Florida codes (2023)
|
||||
are based on 2021 I-Codes.
|
||||
|
||||
#### Site Poles
|
||||
|
||||
Expect direct burial poles in Florida.
|
||||
|
||||
Southeast and Florida exclude concrete in proposals,
|
||||
Florida usually considers site pole foundations excluded in this,
|
||||
Southeast does not.
|
||||
|
||||
#### Construction Type and Wiring Method Selection
|
||||
|
||||
South Florida gardens may be concrete for hurricane resistance
|
||||
but [[ibc-construction-types#Type III Combustible|type III construction]].
|
||||
Romex is allowed in this case.
|
||||
|
||||
#### Automatically Controlled Receptacles
|
||||
|
||||
Florida Building Code does not require automatically controlled receptacles
|
||||
* [ ] investigate
|
||||
|
||||
#### Fire Alarm Inspections
|
||||
|
||||
South Florida fire alarm inspections are conducted at night:
|
||||
+20% of fire alarm budget for overtime.
|
||||
|
||||
### 520Hz Smoke Detectors
|
||||
|
||||
The 120V 520Hz smoke detectors qualified in the proposal
|
||||
are limited source (Home Depot).
|
||||
|
||||
No change to takeoff necessary.
|
||||
Josh changed the name and pricing of the item in the extension.
|
||||
|
||||
### Post-Tensioned Slab Considerations
|
||||
|
||||
In a 6in post-tensioned slab
|
||||
other than fixture branch and floorboxes
|
||||
may not be feasible to run in deck,
|
||||
especially subfeeds.
|
||||
|
||||
### Site Misc
|
||||
|
||||
In the WBS,
|
||||
1 (Site) does not have EL or FA breakdowns.
|
||||
Site EV chargers, Fire Alarm Loop
|
||||
go in Site Misc.
|
||||
|
||||
### Rigid Elbows for Secondaries
|
||||
|
||||
PVC elbows in secondaries
|
||||
* [x] check if intentional
|
||||
* Elbows were RMC, the takeoff name was not changed.
|
||||
|
||||
### Panel Schedule Error
|
||||
|
||||
EV charger breakers were erroneously shown as 20A on some panel schedules.
|
||||
(Should be 80A)
|
||||
|
||||
### Fixture Branch Length
|
||||
|
||||
Fixture branch length tighter for Gardens.
|
||||
Josh shortened some 20fts to 15ft.
|
||||
|
||||
### Material Pricing
|
||||
|
||||
Re-extend all before supplier link.
|
||||
|
||||
### Josh's Review Strategy
|
||||
|
||||
Check middle and end
|
||||
beginning is likely to be rough:
|
||||
asking questions
|
||||
refining
|
||||
|
||||
Expecting significant [[pdi-bid-estimating|Bid]] to ConEst delta in slab work.
|
||||
|
||||
branch length per opening
|
||||
openings per unit
|
||||
|
||||
Unit sqft * 1.5
|
||||
|
||||
800sqft unit = 1200ft cable per unit
|
||||
in whole job, not just unit.
|
||||
|
||||
"True Garden" feeders about \$150 per unit.
|
||||
This is not a "true Garden".
|
||||
|
||||
### Bid Sheet
|
||||
|
||||
See Bid Sheet for actual values.
|
||||
|
||||
[[corwin-fluit]] updates the Bid Sheet quarterly.
|
||||
The Bid Sheet was initially a temporary measure for COVID.
|
||||
|
||||
Usually large delta in units if "Unit Tabulation" sheet is not utilized.
|
||||
|
||||
### Breakdowns for Remote Horn/Strobes in Units
|
||||
|
||||
Remote strobes in units were erroneously taken off in `System` = "EL - Electrical".
|
||||
The correct `System` is "FA - Fire Alarm".
|
||||
|
||||
[[units-takeoff]] had the correct direction for this case at the time of takeoff,
|
||||
but I was not meaningfully consulting the note.
|
||||
|
||||
### Labor Plan
|
||||
|
||||
Count of bathroom exhaust fans per unit
|
||||
is usually one less than smokes
|
||||
|
||||
Do not consider data outlets in above openings per unit.
|
||||
|
||||
Labor Plan:
|
||||
"Amenity" is Interior Amenity.
|
||||
Put Exterior Amenity in "Other".
|
||||
|
||||
Excavation is covered by site work increase labor factor.
|
||||
|
||||
Calculators/Prefab calculator
|
||||
|
||||
Firestopping: \$35 per unit
|
||||
Colorado: \$75 per unit
|
||||
|
||||
Permits: Percent of Contract Value
|
||||
Palm Beach, Florida: 1.1%
|
||||
Miami, Florida: 1.0%
|
||||
Miami Beach, Florida: 1.9%
|
||||
|
||||
Equipment: 0.75% to 1.00% of Selling Price
|
||||
Reference in New Issue