# 2026-05-12 09:15:34
|
||||
|
||||
## Hilltop Gardens Review and Closeout
|
||||
|
||||
[[conest-senior-review]] and [[conest-manager-review]]
|
||||
for [[hilltop-gardens]]
|
||||
with [[josh-ford]] filling in for [[joel-jansen|Joel]].
|
||||
|
||||
### Florida Considerations
|
||||
|
||||
#### Building Codes
|
||||
|
||||
8th Edition Florida codes (2023)
|
||||
are based on 2021 I-Codes.
|
||||
|
||||
#### Site Poles
|
||||
|
||||
Expect direct burial poles in Florida.
|
||||
|
||||
Southeast and Florida exclude concrete in proposals,
|
||||
Florida usually considers site pole foundations excluded in this,
|
||||
Southeast does not.
|
||||
|
||||
#### Construction Type and Wiring Method Selection
|
||||
|
||||
South Florida gardens may be concrete for hurricane resistance
|
||||
but [[ibc-construction-types#Type III Combustible|type III construction]].
|
||||
Romex is allowed in this case.
|
||||
|
||||
#### Automatically Controlled Receptacles
|
||||
|
||||
Florida Building Code does not require automatically controlled receptacles
|
||||
* [ ] investigate
|
||||
|
||||
#### Fire Alarm Inspections
|
||||
|
||||
South Florida fire alarm inspections are conducted at night:
|
||||
+20% of fire alarm budget for overtime.
|
||||
|
||||
### 520Hz Smoke Detectors
|
||||
|
||||
The 120V 520Hz smoke detectors qualified in the proposal
|
||||
are limited source (Home Depot).
|
||||
|
||||
No change to takeoff necessary.
|
||||
Josh changed the name and pricing of the item in the extension.
|
||||
|
||||
### Post-Tensioned Slab Considerations
|
||||
|
||||
In a 6in post-tensioned slab
|
||||
other than fixture branch and floorboxes
|
||||
may not be feasible to run in deck,
|
||||
especially subfeeds.
|
||||
|
||||
### Site Misc
|
||||
|
||||
In the WBS,
|
||||
1 (Site) does not have EL or FA breakdowns.
|
||||
Site EV chargers, Fire Alarm Loop
|
||||
go in Site Misc.
|
||||
|
||||
### Rigid Elbows for Secondaries
|
||||
|
||||
PVC elbows in secondaries
|
||||
* [x] check if intentional
|
||||
* Elbows were RMC, the takeoff name was not changed.
|
||||
|
||||
### Panel Schedule Error
|
||||
|
||||
EV charger breakers were erroneously shown as 20A on some panel schedules.
|
||||
(Should be 80A)
|
||||
|
||||
### Fixture Branch Length
|
||||
|
||||
Fixture branch length tighter for Gardens.
|
||||
Josh shortened some 20fts to 15ft.
|
||||
|
||||
### Material Pricing
|
||||
|
||||
Re-extend all before supplier link.
|
||||
|
||||
### Josh's Review Strategy
|
||||
|
||||
Check middle and end
|
||||
beginning is likely to be rough:
|
||||
asking questions
|
||||
refining
|
||||
|
||||
Expecting significant [[pdi-bid-estimating|Bid]] to ConEst delta in slab work.
|
||||
|
||||
branch length per opening
|
||||
openings per unit
|
||||
|
||||
Unit sqft * 1.5
|
||||
|
||||
800sqft unit = 1200ft cable per unit
|
||||
in whole job, not just unit.
|
||||
|
||||
"True Garden" feeders about \$150 per unit.
|
||||
This is not a "true Garden".
|
||||
|
||||
### Bid Sheet
|
||||
|
||||
See Bid Sheet for actual values.
|
||||
|
||||
[[corwin-fluit]] updates the Bid Sheet quarterly.
|
||||
The Bid Sheet was initially a temporary measure for COVID.
|
||||
|
||||
Usually large delta in units if "Unit Tabulation" sheet is not utilized.
|
||||
|
||||
### Breakdowns for Remote Horn/Strobes in Units
|
||||
|
||||
Remote strobes in units were erroneously taken off in `System` = "EL - Electrical".
|
||||
The correct `System` is "FA - Fire Alarm".
|
||||
|
||||
[[units-takeoff]] had the correct direction for this case at the time of takeoff,
|
||||
but I was not meaningfully consulting the note.
|
||||
|
||||
### Labor Plan
|
||||
|
||||
Count of bathroom exhaust fans per unit
|
||||
is usually one less than smokes
|
||||
|
||||
Do not consider data outlets in above openings per unit.
|
||||
|
||||
Labor Plan:
|
||||
"Amenity" is Interior Amenity.
|
||||
Put Exterior Amenity in "Other".
|
||||
|
||||
Excavation is covered by site work increase labor factor.
|
||||
|
||||
Calculators/Prefab calculator
|
||||
|
||||
Firestopping: \$35 per unit
|
||||
Colorado: \$75 per unit
|
||||
|
||||
Permits: Percent of Contract Value
|
||||
Palm Beach, Florida: 1.1%
|
||||
Miami, Florida: 1.0%
|
||||
Miami Beach, Florida: 1.9%
|
||||
|
||||
Equipment: 0.75% to 1.00% of Selling Price
|
||||