vault backup: 2026-05-15 16:58:51

This commit is contained in:
2026-05-15 16:58:51 -04:00
parent 901a23ae0e
commit b1b483daf8
38 changed files with 2562 additions and 75 deletions
+2 -1
View File
@@ -207,7 +207,8 @@ and completes each systems accurately (FA/DAS/2Way).
Zane references Electrical and Low Voltage drawings
to determine job requirements for accurate take-off of the Telecom system.
Telecom seems to be a living system that changes between initial take-off to completion,
Telecom seems to be a living system
that changes between initial take-off to completion,
and Zane does a good job to stay on top of it.
Can improve speed of take-off