@@ -18,6 +18,9 @@ attended by [[joel-jansen]] and myself.
"MSA TO BUSDUCT"
needs more elbows: added.
***
Josh talked about necessary pullboxes,
but they were not added.
Josh stated the purpose of the closeout budget
@@ -25,6 +28,8 @@ is to prevent procurement from buying sizes
that may be chosen arbitrarily.
Added $5,000 to the budget.
***
Concern was expressed
that feeders up from Main Elec may need to be lengthened
to follow MSA TO BUSDUCT routing shown on floor plans.
@@ -53,13 +58,13 @@ Josh complemented subfeed routing:
"That's taking pride in your work."
I have had hesitation that it was worth doing,
if someone told be it was a waste of time,
if someone told me it was a waste of time,
I would not have been inclined to disagree.
#### Units
Unit receptacles are shown controlled by master switch system.
I assumed full control (not half) so no made no consideration in takeoff.
I assumed full control (not half) so made no consideration in takeoff.
Approved.
#### Lighting Control
@@ -79,7 +84,7 @@ DO NOT USE `System` "LV - Lighting Controls System" EVER
> [!quote] Josh Ford
> We're carrying material handling
> because we own fixtures and its a tall building
> because we own fixtures and it's a tall building
#### Labor Plan