vault backup: 2025-10-30 16:54:47
This commit is contained in:
Vendored
+1
-1
@@ -46,6 +46,6 @@
|
|||||||
"repelStrength": 20,
|
"repelStrength": 20,
|
||||||
"linkStrength": 1,
|
"linkStrength": 1,
|
||||||
"linkDistance": 307,
|
"linkDistance": 307,
|
||||||
"scale": 0.4237373610490891,
|
"scale": 0.21558141879771348,
|
||||||
"close": false
|
"close": false
|
||||||
}
|
}
|
||||||
@@ -7,6 +7,7 @@ tags:
|
|||||||
- topic/estimating
|
- topic/estimating
|
||||||
- type/anecdote
|
- type/anecdote
|
||||||
- authorship/original
|
- authorship/original
|
||||||
|
- topic/construction
|
||||||
title: Estimating Isn't Engineering
|
title: Estimating Isn't Engineering
|
||||||
---
|
---
|
||||||
# Estimating Isn't Engineering
|
# Estimating Isn't Engineering
|
||||||
@@ -20,14 +21,14 @@ Specifically, they took issue with having to
|
|||||||
This puzzled me because the examples they gave
|
This puzzled me because the examples they gave
|
||||||
sounded like stereotypical estimation problems.
|
sounded like stereotypical estimation problems.
|
||||||
|
|
||||||
%% TODO: Example %%
|
<!-- TODO: Include example -->
|
||||||
|
|
||||||
%%
|
<!--
|
||||||
TODO: discussion based on the difference between engineering,
|
TODO: discussion based on the difference between engineering,
|
||||||
(which requires knowledge of subject matter)
|
(which requires knowledge of subject matter)
|
||||||
and estimation
|
and estimation
|
||||||
(which requires knowledge of ~~impact~~).
|
(which requires knowledge of ~~impact~~).
|
||||||
%%
|
-->
|
||||||
|
|
||||||
It's not engineering to budget for the most likely case.
|
It's not engineering to budget for the most likely case.
|
||||||
|
|
||||||
|
|||||||
@@ -69,10 +69,10 @@ where:
|
|||||||
* 480V 3-Phase 3-Wire # Line to Lines
|
* 480V 3-Phase 3-Wire # Line to Lines
|
||||||
|
|
||||||
wiring-configurations:
|
wiring-configurations:
|
||||||
* 1-Phase 2-Wire # Line to Neutral or Line to Line
|
* 1-Phase 2-Wire # Line to Line (2-Pole) or Line to Neutral (1-Pole)
|
||||||
* 1-Phase 3-Wire # Line to Line and Line to Neutral
|
* 1-Phase 3-Wire # Line to Line and Line to Neutral (2-Pole)
|
||||||
* 3-Phase 3-Wire # Line to Lines
|
* 3-Phase 3-Wire # Line to Lines (3-Pole)
|
||||||
* 3-Phase 4-Wire # Line to Lines and Line to Neutral
|
* 3-Phase 4-Wire # Line to Lines and Line to Neutral (3-Pole)
|
||||||
|
|
||||||
## Active and Reactive Power
|
## Active and Reactive Power
|
||||||
|
|
||||||
|
|||||||
@@ -7,6 +7,7 @@ tags:
|
|||||||
- status/complete
|
- status/complete
|
||||||
- topic/estimating
|
- topic/estimating
|
||||||
- type/media-commentary
|
- type/media-commentary
|
||||||
|
- topic/construction
|
||||||
title: "Review: _Construction Estimating Using Excel_"
|
title: "Review: _Construction Estimating Using Excel_"
|
||||||
---
|
---
|
||||||
# Review: _Construction Estimating Using Excel_
|
# Review: _Construction Estimating Using Excel_
|
||||||
|
|||||||
@@ -7,6 +7,7 @@ tags:
|
|||||||
- status/incomplete
|
- status/incomplete
|
||||||
- topic/estimating
|
- topic/estimating
|
||||||
- type/encyclopedia
|
- type/encyclopedia
|
||||||
|
- topic/construction
|
||||||
title: Construction Estimating
|
title: Construction Estimating
|
||||||
---
|
---
|
||||||
# Construction Estimating
|
# Construction Estimating
|
||||||
|
|||||||
@@ -24,7 +24,7 @@ title: Distributed Antenna Systems (DAS) Takeoff
|
|||||||
|
|
||||||
## Backbone
|
## Backbone
|
||||||
|
|
||||||
### FACR to Every Elev. Shaft
|
### FACR to Every Elevator Shaft
|
||||||
|
|
||||||
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`FACR TO ELEV PIT = ...`
|
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`FACR TO ELEV PIT = ...`
|
||||||
|
|
||||||
@@ -58,12 +58,14 @@ Takeoff in every Electric Room
|
|||||||
|
|
||||||
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`TOP 2HR RATED RM TO ROOF = ...`
|
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`TOP 2HR RATED RM TO ROOF = ...`
|
||||||
|
|
||||||
Use 15' or Height of ceiling on last building level
|
* **Length** = 15ft or height of ceiling on last building level
|
||||||
|
|
||||||
## Horizontal
|
## Horizontal
|
||||||
|
|
||||||
1-1/2 through corridors w/ 16x16x6 J-Box
|
> [!important]
|
||||||
|
> Usually only for cellular DAS.
|
||||||
|
> Confirm takeoff requirement with [[pdi-estimating#Bid Estimating|Bid]].
|
||||||
|
|
||||||
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`CORRIDORS ...`
|
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`CORRIDORS ...`
|
||||||
|
|
||||||
Length for every corridor/garage
|
* **Length** = Length measured for every corridor/garage
|
||||||
|
|||||||
@@ -5,6 +5,7 @@ tags:
|
|||||||
- authorship/original
|
- authorship/original
|
||||||
- destiny/permanent
|
- destiny/permanent
|
||||||
- status/complete
|
- status/complete
|
||||||
|
- topic/construction/electrical
|
||||||
- topic/estimating
|
- topic/estimating
|
||||||
- type/media-commentary
|
- type/media-commentary
|
||||||
title: _Electrical Estimating Methods_
|
title: _Electrical Estimating Methods_
|
||||||
|
|||||||
+5
-1
@@ -1,7 +1,11 @@
|
|||||||
---
|
---
|
||||||
id:
|
id:
|
||||||
aliases: []
|
aliases: []
|
||||||
tags: []
|
tags:
|
||||||
|
- authorship/original
|
||||||
|
- destiny/permanent
|
||||||
|
- status/incomplete
|
||||||
|
- topic/hobbies
|
||||||
title: Homelab
|
title: Homelab
|
||||||
---
|
---
|
||||||
# Homelab
|
# Homelab
|
||||||
|
|||||||
@@ -19,7 +19,7 @@ title: Lighting Controls Takeoff
|
|||||||
> no consideration for _any_ lighting control beyond standard devices,
|
> no consideration for _any_ lighting control beyond standard devices,
|
||||||
> (with `$D`'s being the triac type)
|
> (with `$D`'s being the triac type)
|
||||||
> however, this phrasing is ambiguous and non-universal.
|
> however, this phrasing is ambiguous and non-universal.
|
||||||
> Confirm with the bid team on what must be included.
|
> Confirm with [[pdi-estimating#Bid Estimating|bid team]] on what must be included.
|
||||||
|
|
||||||
## Custom Switch Boxes
|
## Custom Switch Boxes
|
||||||
|
|
||||||
|
|||||||
@@ -43,12 +43,10 @@ If no quote is available:
|
|||||||
|
|
||||||
### Takeoff
|
### Takeoff
|
||||||
|
|
||||||
```
|
> * `Area` = "01 - Lightning Protection Building"
|
||||||
Area = "Lightning Protection" // confirm
|
> * `Phase` = "Building - BOH, Storage & Common"
|
||||||
Phase = "Building - BOH, Storage & Common"
|
> * `System` = "LPT - Lightning Protection"
|
||||||
System = "LPT - Lightning Protection"
|
> * `BidItem` = "3 - Building"
|
||||||
BidItem = "3 - Building"
|
|
||||||
```
|
|
||||||
|
|
||||||
* Takeoff: `COMMON ASSEMBLIES`/`PDI EMPTY CONDUIT`/`PVC ASSEMBLIES`/`* CONDUIT - PVC40`
|
* Takeoff: `COMMON ASSEMBLIES`/`PDI EMPTY CONDUIT`/`PVC ASSEMBLIES`/`* CONDUIT - PVC40`
|
||||||
* **Length** = total downlead conduit length
|
* **Length** = total downlead conduit length
|
||||||
|
|||||||
+4
-1
@@ -1,7 +1,10 @@
|
|||||||
---
|
---
|
||||||
id:
|
id:
|
||||||
aliases: []
|
aliases: []
|
||||||
tags: []
|
tags:
|
||||||
|
- destiny/fleeting
|
||||||
|
- authorship/original
|
||||||
|
- topic/hobbies
|
||||||
title: Media to Watch
|
title: Media to Watch
|
||||||
---
|
---
|
||||||
# Media to Watch
|
# Media to Watch
|
||||||
|
|||||||
@@ -17,6 +17,8 @@ title: PDI Estimating
|
|||||||
|
|
||||||
## Departments
|
## Departments
|
||||||
|
|
||||||
|
### Bid Estimating
|
||||||
|
|
||||||
### Construction Estimating (ConEst)
|
### Construction Estimating (ConEst)
|
||||||
|
|
||||||
The role of ConEst is to provide context to Bid estimates.
|
The role of ConEst is to provide context to Bid estimates.
|
||||||
|
|||||||
@@ -16,8 +16,9 @@ is to address potential discrepancies
|
|||||||
between the requirements of the project documents
|
between the requirements of the project documents
|
||||||
and the scope included in the bid team's proposed price.
|
and the scope included in the bid team's proposed price.
|
||||||
|
|
||||||
Before sending the confirmation,
|
> [!important]
|
||||||
see [[wiring-method-selection]] for common issues.
|
> Complete [[pre-takeoff-research]]
|
||||||
|
> before sending the confirmation.
|
||||||
|
|
||||||
> [!example] Example provided by Joel Jansen 2025-09-18, edited
|
> [!example] Example provided by Joel Jansen 2025-09-18, edited
|
||||||
> Good morning,
|
> Good morning,
|
||||||
|
|||||||
@@ -7,6 +7,7 @@ tags:
|
|||||||
- topic/estimating
|
- topic/estimating
|
||||||
- type/philosophy
|
- type/philosophy
|
||||||
- authorship/original
|
- authorship/original
|
||||||
|
- topic/construction
|
||||||
title: The Purpose of Construction Estimating
|
title: The Purpose of Construction Estimating
|
||||||
---
|
---
|
||||||
# The Purpose of Construction Estimating
|
# The Purpose of Construction Estimating
|
||||||
|
|||||||
@@ -9,7 +9,7 @@ title: Realism vs. Instrumentalism
|
|||||||
---
|
---
|
||||||
# Realism vs. Instrumentalism
|
# Realism vs. Instrumentalism
|
||||||
|
|
||||||
Realism holds that the purpose of ~~science~~
|
Realism holds that the purpose of [scientific research](https://en.wikipedia.org/wiki/Research)
|
||||||
is to describe the world as accurately as possible.
|
is to describe the world as accurately as possible.
|
||||||
Instrumentalism (anti-realism) holds that the purpose
|
Instrumentalism (anti-realism) holds that the purpose
|
||||||
is to make accurate predictions.
|
is to make accurate predictions.
|
||||||
@@ -20,6 +20,6 @@ is to make accurate predictions.
|
|||||||
> [!quote] _Opinionated History of Mathematics_, "Did Copernicus steal ideas from Islamic astronomers?" (pp.)
|
> [!quote] _Opinionated History of Mathematics_, "Did Copernicus steal ideas from Islamic astronomers?" (pp.)
|
||||||
> Ptolemy's lunar model is "flawed"
|
> Ptolemy's lunar model is "flawed"
|
||||||
> in that it inaccurately describes Luna's distance from Earth,
|
> in that it inaccurately describes Luna's distance from Earth,
|
||||||
> however Ptolemy only ever uses the model to predict eclipses,
|
> however Ptolemy only ever used the model to predict eclipses,
|
||||||
> which the model does very well.
|
> which the model does very well.
|
||||||
> The discrepancy is only a flaw from a realist perspective.
|
> The discrepancy is only a flaw from a realist perspective.
|
||||||
|
|||||||
@@ -0,0 +1,42 @@
|
|||||||
|
---
|
||||||
|
id:
|
||||||
|
aliases: []
|
||||||
|
tags: []
|
||||||
|
title: Statistical Significance
|
||||||
|
---
|
||||||
|
# Statistical Significance
|
||||||
|
|
||||||
|
[Statistical significance - Wikipedia](https://en.wikipedia.org/wiki/Statistical_significance)
|
||||||
|
In statistical hypothesis testing,
|
||||||
|
a result has statistical significance
|
||||||
|
when a result at least as "extreme"
|
||||||
|
would be very infrequent if the null hypothesis were true.
|
||||||
|
|
||||||
|
More precisely,
|
||||||
|
a study's defined **significance level**, denoted by $\alpha$,
|
||||||
|
is the probability of the study rejecting the null hypothesis,
|
||||||
|
given that the null hypothesis is true;
|
||||||
|
and the p-value of a result, $p$,
|
||||||
|
is the probability of obtaining a result at least as extreme,
|
||||||
|
given that the null hypothesis is true.
|
||||||
|
The result is said to be statistically significant,
|
||||||
|
by the standards of the study, when $p \leq \alpha$
|
||||||
|
|
||||||
|
The significance level for a study
|
||||||
|
is chosen before data collection,
|
||||||
|
and is typically set to 5% or much lower--
|
||||||
|
depending on the field of study.
|
||||||
|
|
||||||
|
The [**null hypothesis**](https://en.wikipedia.org/wiki/Null_hypothesis)
|
||||||
|
(often denoted $H_{0}$)
|
||||||
|
is the claim that the effect being studied does not exist,
|
||||||
|
or that no relationship exists
|
||||||
|
between two sets of data or variables being analyzed.
|
||||||
|
|
||||||
|
If the null hypothesis is true,
|
||||||
|
any experimentally observed effect is due to chance alone.
|
||||||
|
|
||||||
|
In research,
|
||||||
|
the researcher develops an [**alternative hypothesis**](https://en.wikipedia.org/wiki/Alternative_hypothesis)
|
||||||
|
(often denoted $H_{A}$ or $H_{1}$)
|
||||||
|
which claims that an effect or relationship _does_ exist.
|
||||||
Reference in New Issue
Block a user