@@ -133,7 +133,8 @@ Cable type wiring methods (MC, NM, SE)
|
||||
may only be used where they will be concealed from view.
|
||||
|
||||
> [!important] Exception:
|
||||
> Temporary provisions for unfinished spaces (e.g. core and shell retail)
|
||||
> Temporary provisions for unfinished spaces
|
||||
> (e.g. core and shell [[pdi-building-types#Retail|retail]])
|
||||
|
||||
#### Multi-Circuit Homeruns
|
||||
|
||||
@@ -196,7 +197,7 @@ Not usually permissible, except in Florida.
|
||||
## Flow Chart
|
||||
|
||||
```mermaid
|
||||
flowchart LR
|
||||
flowchart
|
||||
A[Construction Type]
|
||||
A -- I, II --> B[Can be run in slab?]
|
||||
B -- No --> D[Concealed?]
|
||||
@@ -218,5 +219,5 @@ in a 2-hour rated assembly.
|
||||
This usually requires no change to takeoff for high-rises
|
||||
since electrical riser rooms are themselves fire-rated.
|
||||
|
||||
* RHW-2 insulated conductors in conduit -- "Lifeline Cable"
|
||||
* 2-hour rated metal clad cable -- "Vitalink"
|
||||
* RHW-2 insulated conductors in conduit --- "Lifeline Cable"
|
||||
* 2-hour rated metal clad cable --- "Vitalink"
|
||||