> [!quote] [ELECTRI's Industry Benchmarking Tool - ELECTRI International](https://www.electri.org/research-overview/electris-industry-benchmarking-tool/)
|
||||||
|
> ### Hours Burned vs. Hours Earned
|
||||||
|
>
|
||||||
|
> Definition:
|
||||||
|
> Comparison between portion of project estimated hours complete
|
||||||
|
> compared with the actual hours spent on the task.
|
||||||
|
> This is the labor performance factor
|
||||||
|
> (needs to reference the labor factor used at bid time for a full comparison).
|
||||||
|
|
||||||
|
This is a terribly problematic metric.
|
||||||
|
|
||||||
|
If a project went over its material budget
|
||||||
|
despite standard rigorous oversight
|
||||||
|
where would you first look,
|
||||||
|
construction or estimating?
|
||||||
|
In almost all cases the safer bet is estimating.
|
||||||
|
Why should labor be different?
|
||||||
|
|
||||||
|
Wherever there is budget variance
|
||||||
|
there is a persistent tendency to blame construction
|
||||||
|
before estimating.
|
||||||
|
|
||||||
|
[[purpose-of-construction-estimating#The Myth of Estimate Accuracy]]
|
||||||
@@ -0,0 +1,122 @@
|
|||||||
|
---
|
||||||
|
id:
|
||||||
|
aliases: []
|
||||||
|
tags:
|
||||||
|
- authorship/llm
|
||||||
|
- destiny/fleeting
|
||||||
|
- status/complete
|
||||||
|
- topic/estimating
|
||||||
|
- topic/risk
|
||||||
|
title: Modeling Bid Prices Under Intrinsic Cost Uncertainty
|
||||||
|
---
|
||||||
|
# Modeling Bid Prices Under Intrinsic Cost Uncertainty
|
||||||
|
|
||||||
|
> [!warning]
|
||||||
|
> This text is almost entirely LLM output.
|
||||||
|
> I don't intend to keep or use any significant portions of it.
|
||||||
|
|
||||||
|
Consider a construction project characterized by an intrinsic but unknown final cost $C$.
|
||||||
|
Prior to project completion, $C$ cannot be observed directly;
|
||||||
|
instead the estimator possesses only a probability distribution over feasible outcomes.
|
||||||
|
|
||||||
|
Let $(\Omega, \mathcal{F}, \mathbb{P})$ be a [probability space](https://en.wikipedia.org/wiki/Probability_space)
|
||||||
|
describing the estimator's uncertainty,
|
||||||
|
and define the true cost model as a non-negative random variable
|
||||||
|
|
||||||
|
$$
|
||||||
|
C : \Omega \to [0,\infty)
|
||||||
|
$$
|
||||||
|
|
||||||
|
with [distribution](https://en.wikipedia.org/wiki/Probability_distribution) $\mu_C$.
|
||||||
|
|
||||||
|
The distribution $\mu_C$ summarizes all available information at the time of bidding,
|
||||||
|
including quantities, labor productivity uncertainty,
|
||||||
|
market conditions, subcontractor pricing variability,
|
||||||
|
and correlation structures inherent to the estimator's assumptions.
|
||||||
|
|
||||||
|
Although the natural mathematical representation of cost is thus a distribution,
|
||||||
|
procurement mechanisms typically require that each bidder submit a single deterministic price.
|
||||||
|
|
||||||
|
Denote this bid by
|
||||||
|
|
||||||
|
$$
|
||||||
|
B \in [0,\infty).
|
||||||
|
$$
|
||||||
|
|
||||||
|
> Read as
|
||||||
|
> "$B$ is an [element](https://en.wikipedia.org/wiki/Element_(mathematics))
|
||||||
|
> of the interval from zero to infinity, including zero."
|
||||||
|
|
||||||
|
A bid $B$ may be viewed as the output
|
||||||
|
of a pricing [functional](https://en.wikipedia.org/wiki/Functional_(mathematics))
|
||||||
|
|
||||||
|
$$
|
||||||
|
\Phi : \mathcal{P}([0,\infty)) \to [0,\infty),
|
||||||
|
$$
|
||||||
|
|
||||||
|
mapping a cost distribution $\mu_C$ to a scalar.
|
||||||
|
|
||||||
|
Examples of such functionals include:
|
||||||
|
|
||||||
|
### 1. Risk-neutral expectation
|
||||||
|
|
||||||
|
$$
|
||||||
|
\Phi(\mu_C) = \mathbb{E}[C],
|
||||||
|
$$
|
||||||
|
|
||||||
|
> Read as "Phi of mu sub C equals the expected value of C."
|
||||||
|
|
||||||
|
where $\mathbb{E}[\cdot]$ denotes the [expected value](https://en.wikipedia.org/wiki/Expected_value).
|
||||||
|
|
||||||
|
### 2. Risk-adjusted expectation
|
||||||
|
|
||||||
|
$$
|
||||||
|
\Phi(\mu_C) = \mathbb{E}[C] + \lambda\sqrt{\mathrm{Var}[C]},
|
||||||
|
$$
|
||||||
|
|
||||||
|
> Read as "Phi of mu sub C equals the expected value of C plus lambda times the square root of the variance of C."
|
||||||
|
|
||||||
|
where $\mathrm{Var}[C]$ is the [variance](https://en.wikipedia.org/wiki/Variance)
|
||||||
|
and $\lambda>0$ is a risk-loading parameter.
|
||||||
|
|
||||||
|
> This mirrors mean--variance pricing common in portfolio theory.
|
||||||
|
|
||||||
|
### 3. Quantile-based pricing
|
||||||
|
|
||||||
|
$$
|
||||||
|
\Phi(\mu_C) = Q_p(C),
|
||||||
|
$$
|
||||||
|
|
||||||
|
> Read as "Phi of mu sub C equals the p-quantile of C."
|
||||||
|
|
||||||
|
where $Q_p$ is the $p$-[quantile](https://en.wikipedia.org/wiki/Quantile)
|
||||||
|
of the distribution.
|
||||||
|
|
||||||
|
### 4. Utility-maximizing bid
|
||||||
|
|
||||||
|
Under a bidder [utility](https://en.wikipedia.org/wiki/Utility) function $U$,
|
||||||
|
|
||||||
|
$$
|
||||||
|
\Phi(\mu_C) = \arg\max_{b\ge0} \; \mathbb{E}[\,U(b - C)\,].
|
||||||
|
$$
|
||||||
|
|
||||||
|
> Read as "Phi of mu sub C equals the argument b greater than or equal to zero
|
||||||
|
> that maximizes the expected value of U of b minus C."
|
||||||
|
|
||||||
|
> [$\arg\max$](https://en.wikipedia.org/wiki/Arg_max) is the value of $b$ that maximizes the expression.
|
||||||
|
|
||||||
|
***
|
||||||
|
|
||||||
|
The central tension is:
|
||||||
|
|
||||||
|
* The ontologically correct representation of project cost prior to execution is a **probability distribution**, whereas
|
||||||
|
* The procurement mechanism requires a **deterministic scalar**.
|
||||||
|
|
||||||
|
The study of such pricing functionals $\Phi$ sits within
|
||||||
|
[stochastic optimization](https://en.wikipedia.org/wiki/Stochastic_optimization),
|
||||||
|
[risk measures](https://en.wikipedia.org/wiki/Risk_measure),
|
||||||
|
and [mechanism design](https://en.wikipedia.org/wiki/Mechanism_design).
|
||||||
|
Understanding how different choices of $\Phi$
|
||||||
|
compress and distort the underlying uncertainty $\mu_C$
|
||||||
|
has direct implications for bidder profitability, competitive strategy,
|
||||||
|
and how risk is allocated across the construction market.
|
||||||
+29
-1
@@ -15,7 +15,7 @@ title: Bid Process Strategy
|
|||||||
## Scope
|
## Scope
|
||||||
|
|
||||||
This note is intended to describe bid process strategy
|
This note is intended to describe bid process strategy
|
||||||
especially in terms of [[strategy#Auction Theory]],
|
especially in terms of [[auction-theory]],
|
||||||
which specifically addresses the competitive bid format
|
which specifically addresses the competitive bid format
|
||||||
typical of construction project award.
|
typical of construction project award.
|
||||||
|
|
||||||
@@ -38,3 +38,31 @@ Bidders will accept a lower payout or even a loss
|
|||||||
in order to retain employees.
|
in order to retain employees.
|
||||||
|
|
||||||
**Backlog Deficit** drives up **Utility of award**
|
**Backlog Deficit** drives up **Utility of award**
|
||||||
|
|
||||||
|
## Factors Brainstorm
|
||||||
|
|
||||||
|
This is a list of semi-independent factors
|
||||||
|
relevant to the contractors decision of if and how to bid.
|
||||||
|
|
||||||
|
### Key
|
||||||
|
|
||||||
|
* `> [!info]` --- **Fact:** an indisputable truth or term definition
|
||||||
|
* `> [!important]` --- **Logical Consequence**
|
||||||
|
* `> [!tip]` --- **Relationship**
|
||||||
|
* `> [!success]` --- **Desirable Outcome**
|
||||||
|
* `> [!failure]` --- **Undesirable Outcome**
|
||||||
|
|
||||||
|
> [!info]
|
||||||
|
> The exact cost of a construction project is **uncertain**
|
||||||
|
> until it is completed.
|
||||||
|
|
||||||
|
> [!info]
|
||||||
|
> Customers request bids as a
|
||||||
|
|
||||||
|
> [!tip]
|
||||||
|
> Spending _more_ time on estimates
|
||||||
|
|
||||||
|
> [!tip]
|
||||||
|
> Estimating _more_ projects leads to _more_ opportunities for award.
|
||||||
|
> Estimating _fewer_ projects leads to _fewer_ opportunities for award.
|
||||||
|
|
||||||
|
|||||||
+22
-6
@@ -35,6 +35,28 @@ Because they are not expected to ever look at their work again,
|
|||||||
they have no incentive to reveal errors
|
they have no incentive to reveal errors
|
||||||
as they can simply plead ignorance if the error is discovered.
|
as they can simply plead ignorance if the error is discovered.
|
||||||
|
|
||||||
|
## Incentives
|
||||||
|
|
||||||
|
I strongly oppose any project-based incentive structure for estimators.
|
||||||
|
Such a structure is at odds with the [[purpose-of-construction-estimating]],
|
||||||
|
and is an example of a [perverse incentive](https://en.wikipedia.org/wiki/Perverse_incentive).
|
||||||
|
|
||||||
|
This behavior should be regulated by an accompanying _disincentive_ structure,
|
||||||
|
but equivalent punishment becomes unfeasible
|
||||||
|
before monetary rewards become effective.
|
||||||
|
The absolute worst disincentive an estimator faces is termination,
|
||||||
|
which, with fully-remote options available, is only an inconvenience.
|
||||||
|
|
||||||
|
The timeline to recognize an estimate was deliberately misrepresented
|
||||||
|
is not much shorter than that of the project.
|
||||||
|
|
||||||
|
Such incentives therefore create a [[game-theory|competitive game]]
|
||||||
|
between the estimator and the employer
|
||||||
|
where the employer is hopelessly outmatched,
|
||||||
|
and the estimator's [[strategy#Strictly Dominant Strategy|strictly dominant strategy]]---
|
||||||
|
resisted only by their moral conviction---
|
||||||
|
is to abuse the system: to bid fast, lie often, take the bag, and leave.
|
||||||
|
|
||||||
## Collaboration
|
## Collaboration
|
||||||
|
|
||||||
Estimation is a profession ripe for productive collaboration.
|
Estimation is a profession ripe for productive collaboration.
|
||||||
@@ -80,9 +102,3 @@ to embrace the statistical aspects of our field.
|
|||||||
|
|
||||||
* Be competent with every tool available to you.
|
* Be competent with every tool available to you.
|
||||||
* Always assume there is a better way to complete a given task.
|
* Always assume there is a better way to complete a given task.
|
||||||
|
|
||||||
## Incentives
|
|
||||||
|
|
||||||
I strongly oppose any project-based incentive structure for estimators.
|
|
||||||
Such a structure is at odds with the [[purpose-of-construction-estimating]],
|
|
||||||
and is an example of a [perverse incentive](https://en.wikipedia.org/wiki/Perverse_incentive).
|
|
||||||
|
|||||||
@@ -0,0 +1,59 @@
|
|||||||
|
# Game Theory
|
||||||
|
|
||||||
|
## Domains
|
||||||
|
|
||||||
|
### Auction Theory
|
||||||
|
|
||||||
|
[[auction-theory|Auction theory]] is a subset of game theory
|
||||||
|
|
||||||
|
<!-- TODO: -->
|
||||||
|
|
||||||
|
#### Reverse Auction
|
||||||
|
|
||||||
|
In a reverse auction,
|
||||||
|
bidders compete for the right to _sell_ a product or service.
|
||||||
|
|
||||||
|
#### Sealed-Bid Auction
|
||||||
|
|
||||||
|
Opposite of a conventional "open" auction,
|
||||||
|
in a sealed-bid auction,
|
||||||
|
bid prices are hidden from the bidders.
|
||||||
|
|
||||||
|
[[uncertainty#Information]]
|
||||||
|
|
||||||
|
<!-- TODO: -->
|
||||||
|
|
||||||
|
## Terminology
|
||||||
|
|
||||||
|
### "Solved" Games
|
||||||
|
|
||||||
|
<!-- TODO: -->
|
||||||
|
|
||||||
|
### Symmetry
|
||||||
|
|
||||||
|
## Typical Games
|
||||||
|
|
||||||
|
### Chicken
|
||||||
|
|
||||||
|
| Player A \ Player B | Player B: Back Down | Player B: Hold Firm |
|
||||||
|
|:------------------- |:-----------------------:|:-----------------------:|
|
||||||
|
| Player A: Back Down | Tie \ Tie | Lose face \ Gain status |
|
||||||
|
| Player A: Hold Firm | Gain status \ Lose face | Die \ Die |
|
||||||
|
|
||||||
|
### Prisoner's Dilemma
|
||||||
|
|
||||||
|
| Prisoner A \ Prisoner B | Prisoner B: Cooperate | Prisoner B: Defect |
|
||||||
|
|:----------------------- |:---------------------------:|:-----------------------------:|
|
||||||
|
| Prisoner A: Cooperate | Serve 1 year \ Serve 1 year | Serve 3 years \ Go free |
|
||||||
|
| Prisoner A: Defect | Go free \ Serve 3 years | Serve 2 years \ Serve 2 years |
|
||||||
|
|
||||||
|
### Stag Hunt
|
||||||
|
|
||||||
|
| Hunter A \ Hunter B | Hunter B: Hunt Stag | Hunter B: Hunt Hare |
|
||||||
|
|:------------------- |:--------------------:|:--------------------:|
|
||||||
|
| Hunter A: Hunt Stag | Eat stag \ Eat stag | Go hungry \ Eat hare |
|
||||||
|
| Hunter A: Hunt Hare | Eat hare \ Go hungry | Eat hare \ Eat hare |
|
||||||
|
|
||||||
|
### Ultimatum Game
|
||||||
|
|
||||||
|
### Dictator Game
|
||||||
@@ -18,8 +18,6 @@ which would take far longer than allotted for bid,
|
|||||||
|
|
||||||
## The Myth of Estimate Accuracy
|
## The Myth of Estimate Accuracy
|
||||||
|
|
||||||
<!-- TODO: -->
|
|
||||||
|
|
||||||
This is a dangerous superstition
|
This is a dangerous superstition
|
||||||
which encourages unproductive conflict.
|
which encourages unproductive conflict.
|
||||||
|
|
||||||
@@ -27,6 +25,20 @@ Operations is blamed for failing to meet targets
|
|||||||
not intended for the purpose,
|
not intended for the purpose,
|
||||||
...
|
...
|
||||||
|
|
||||||
|
***
|
||||||
|
|
||||||
|
Construction contract bids are inherently risky.
|
||||||
|
|
||||||
|
Executives want to bid because construction can be profitable.
|
||||||
|
Executives hire estimators to mitigate risk of loss.
|
||||||
|
|
||||||
|
An estimator's value is determined by their
|
||||||
|
|
||||||
|
An estimator's job is to mitigate
|
||||||
|
|
||||||
|
|
||||||
|
Estimators downplay the
|
||||||
|
|
||||||
## For Each Party
|
## For Each Party
|
||||||
|
|
||||||
### For the Solicitor
|
### For the Solicitor
|
||||||
|
|||||||
+12
-32
@@ -14,48 +14,28 @@ title: Strategy
|
|||||||
The field of strategy is concerned
|
The field of strategy is concerned
|
||||||
with the optimal solutions of problematic scenarios.
|
with the optimal solutions of problematic scenarios.
|
||||||
|
|
||||||
## Decision Theory
|
## Domains
|
||||||
|
|
||||||
Decision theory concerns
|
### Decision Theory
|
||||||
|
|
||||||
* ~~internal problems~~
|
[[decision-theory|Decision theory]] concerns choices
|
||||||
* ~~no competition~~
|
made by a single party, based on environmental conditions
|
||||||
* ~~internal optimization~~
|
|
||||||
|
|
||||||
## Game Theory
|
"Player vs. Environment"
|
||||||
|
|
||||||
Game theory concerns decisions
|
### Game Theory
|
||||||
|
|
||||||
|
[[game-theory|Game theory]] concerns choices
|
||||||
made in competition with other intelligent actors.
|
made in competition with other intelligent actors.
|
||||||
|
|
||||||
Predictions of competitor behavior in bids and market movements
|
"Player vs. Player"
|
||||||
are made with a game-theoretic lens.
|
|
||||||
|
## Terminology
|
||||||
|
|
||||||
### Dominant Strategy
|
### Dominant Strategy
|
||||||
|
|
||||||
A dominant strategy is one
|
A dominant strategy is one
|
||||||
that results in the better outcome.
|
that results in the better outcome.
|
||||||
|
|
||||||
### "Solved" Games
|
### Strictly Dominant Strategy
|
||||||
|
|
||||||
<!-- TODO: -->
|
|
||||||
|
|
||||||
### Auction Theory
|
|
||||||
|
|
||||||
Auction theory is a subset of game theory
|
|
||||||
|
|
||||||
<!-- TODO: -->
|
|
||||||
|
|
||||||
#### Reverse Auction
|
|
||||||
|
|
||||||
In a reverse auction,
|
|
||||||
bidders compete for the right to _sell_ a product or service.
|
|
||||||
|
|
||||||
#### Sealed-Bid Auction
|
|
||||||
|
|
||||||
Opposite of a conventional "open" auction,
|
|
||||||
in a sealed-bid auction,
|
|
||||||
bid prices are hidden from the bidders.
|
|
||||||
|
|
||||||
[[uncertainty#Information]]
|
|
||||||
|
|
||||||
<!-- TODO: -->
|
|
||||||
|
|||||||
@@ -29,6 +29,10 @@ by Douglas W. Hubbard
|
|||||||
* Certain Monetary Equivalent (CME)
|
* Certain Monetary Equivalent (CME)
|
||||||
* also called Certainty Equivalent
|
* also called Certainty Equivalent
|
||||||
|
|
||||||
|
One or more curves referenced in the text are
|
||||||
|
[Indifference curves](https://en.wikipedia.org/wiki/Indifference_curve)
|
||||||
|
but not referred to as such.
|
||||||
|
|
||||||
## Key Takeaways
|
## Key Takeaways
|
||||||
|
|
||||||
### Definition of Risk
|
### Definition of Risk
|
||||||
|
|||||||
@@ -12,3 +12,20 @@ title: Uncommon Syntax
|
|||||||
* **i.e.** --- _id est_ ("that is")
|
* **i.e.** --- _id est_ ("that is")
|
||||||
|
|
||||||
* **e.g.** --- _exempli gratia_ ("for example")
|
* **e.g.** --- _exempli gratia_ ("for example")
|
||||||
|
|
||||||
|
## Symbols
|
||||||
|
|
||||||
|
* $\therefore$
|
||||||
|
|
||||||
|
* $\vdash$ --- turnstile,
|
||||||
|
denotes logical consequence
|
||||||
|
|
||||||
|
* $\vDash$ or $\models$ --- double turnstile,
|
||||||
|
denotes [semantic](https://en.wikipedia.org/wiki/Semantic "Semantic") consequence
|
||||||
|
|
||||||
|
> [!quote] [Double turnstile - Wikipedia](https://en.wikipedia.org/wiki/Double_turnstile)
|
||||||
|
> read as
|
||||||
|
> "[entails](https://en.wikipedia.org/wiki/Logical_consequence "Logical consequence")",
|
||||||
|
> "[models](https://en.wikipedia.org/wiki/Model_theory "Model theory")",
|
||||||
|
> "is a **semantic consequence** of"
|
||||||
|
> or "is stronger than".
|
||||||
Reference in New Issue
Block a user