Merge remote-tracking branch 'origin/main'

This commit is contained in:
2026-05-07 11:33:14 -04:00
32 changed files with 121 additions and 45 deletions
+2 -3
View File
@@ -14,9 +14,8 @@ Content extracted from [[wiring-method-selection]],
timestamp based on my teams message to Joel.
%%
## Vanderbilt Central Neighborhood Residential College Spec Interpretation
[[vanderbilt-central-neighborhood-residential-college]]
Spec interpretation question
relevant to [[vanderbilt-central-neighborhood-residential-college]]:
> [!cite] Project Specifications (pp.)
> Fittings for Type EMT Duct Raceways:
+1 -1
View File
@@ -14,7 +14,7 @@ daily: "[[2025-11-04]]"
[[estimating-director-review]] for [[belle-meade-plaza]]
lead by [[corwin-fluit]],
attended by [[joel-jansen]] and myself.
attended by [[joel-jansen]] and [[zane-meyers|myself]].
#### Takeoff Review
+2 -4
View File
@@ -17,11 +17,9 @@ Anecdote criticizing the common adversarial model
of subcontractor-GC relations
(or more generally contractor-customer)
in [[construction-contracting]].
My position is that
deliberately hiding information from the customer
My position is that deliberately hiding information from the customer
(lacking [[transparency]] in interactions)
always costs the contractor
more than they stand to gain from it.
always costs the contractor more than they stand to gain from it.
%%
I might be reprimanded for the things I've said about deceptive bid practices
+2 -1
View File
@@ -9,7 +9,8 @@ daily: "[[2025-11-10]]"
---
# 2025-11-10 10:40:??
A significant change from Ace to PDI in my mentality during takeoff
A significant change from [[ace-electric-inc|Ace]] to [[power-design-inc|PDI]]
in my mentality during takeoff
is that I now tend to expect that (within reason)
"holes" in takeoff scripts are _intentional omissions_,
not holes in cost coverage.
+1 -1
View File
@@ -38,7 +38,7 @@ of [[nfpa-70_100_definitions#Exposed (as applied to wiring methods).|exposed]]
and [[nfpa-70_100_definitions#Dwelling, Multifamily.|dwelling]],
334.12(A)(2) can be paraphrased as follows:
> [!cite] [[nfpa-70_334_nm-cable#334.12(A) Types NM and NMC.|NEC 334.12(A)(2)]], pp.
> [!cite] [[nfpa-70_334_nm-cable#334.12(A) Types NM and NMC.|NEC 334.12(A)(2)]] (pp.)
> Types NM and NMC cable are not permitted to be installed
> in accessible spaces above suspended ceilings,
> _except in buildings containing one or more dwelling units._
+1 -1
View File
@@ -18,7 +18,7 @@ about what's correct that don't change just because
a senior says they should, is a good sign.
I can't remember now if I knew it before today,
but my relationship with Dale, my former manager,
but my relationship with [[dale-flythe|Dale]], my former manager,
while never "good", was much improved when I started
pushing back on his direction and feedback. I became
an estimator, where before I was just someone who
+1 -1
View File
@@ -6,7 +6,7 @@ daily: "[[2025-11-11]]"
---
# 2025-11-11 ??:??:??
> [!quote] [[joel-jansen]] 2025-11-11, pp.
> [!quote] [[joel-jansen]] 2025-11-11 (pp.)
>
> For N5-15R/N5-20R receptacles serving fixed equipment such as:
>
+1 -1
View File
@@ -12,7 +12,7 @@ _Tuesday Morning, Before Work_
One of the most appealing aspects of [[construction-estimating]]
to me is the dynamic we have with our employers.
my experience was at [[ace-electric-inc|Ace]] that estimators act like,
my experience at [[ace-electric-inc|Ace]] was that estimators act like,
and are treated like good artists, like loveable
little scamps who always get into trouble, but
you keep them around because they do good work.
+24 -12
View File
@@ -6,23 +6,33 @@ tags:
- type/minutes
title: ConEst Training Agenda
---
# ConEst Training Agenda
# 2025-11-13 13:25:27
## Day 1
## ConEst Training Agenda
%%
Agenda I hastily assembled
for training a project engineer
on [[conest|ConEst]] processes.
%%
### Day 1
%%
Started ~13:45
%%
### 2100 Crystal Drive
#### 2100 Crystal Drive
#### Deliverables
%% [[2100-crystal-drive]] %%
##### Deliverables
* [x] WBS Area Breakouts
* [x] Unit Matrix
* [ ] Accubid/LiveCount setup
* [ ] [[accubid|Accubid]]/LiveCount setup
#### Sequence
##### Sequence
1. Find BPM
* State, building type
@@ -46,9 +56,9 @@ Started ~13:45
* look in electrical, arch; compare.
* paste to Accubid Typicals
## Day 2
### Day 2
### Sequence
#### Sequence
1. Trainee to repeat process from [[#Day 1]]
on [[#Howard University East Towers]].
@@ -58,17 +68,19 @@ Started ~13:45
3. Trainer to explain OneNote
### Howard University East Towers
#### Howard University East Towers
#### Deliverables
%% [[howard-university-east-towers]] %%
##### Deliverables
* [ ] WBS Area Breakouts
* [ ] Unit Matrix
* [ ] Accubid/LiveCount setup
### Revisit 2100 Crystal Drive
#### Revisit 2100 Crystal Drive
#### Finish TrimbleConnect Setup
##### Finish TrimbleConnect Setup
* Back to TrimbleConnect
* split and add Drawings
+4 -3
View File
@@ -16,7 +16,8 @@ trying to [[learn-shorthand]],
I was growing frustrated with the terminology the text uses
to express English phonology.
I found a great article:
[Guess What? They're ALL Silent Letters!](https://mbsteven.edublogs.org/2018/05/05/guess-what-theyre-all-silent-letters/)
I found a great article
that effectively expresses the pain I feel
every time someone says "silent e".
every time someone says "silent e":
[Guess What? They're ALL Silent Letters!](https://mbsteven.edublogs.org/2018/05/05/guess-what-theyre-all-silent-letters/)
+3 -1
View File
@@ -12,7 +12,9 @@ daily: "[[2025-11-18]]"
%%
Transcription of notes
taken while reviewing [[elliott-st-hotel]] with [[joel-jansen]].
taken while observing
[[joel-jansen]]'s [[conest-senior-review]]
of [[elliott-st-hotel]]
%%
Adorne USB Heating Designation was built with standard device.
+3 -1
View File
@@ -10,7 +10,9 @@ daily: "[[2025-11-20]]"
## Elliot St. WBS Prep
[[elliott-st-hotel]]
%%
Follow-up to [[2025-11-18_16-33-00]].
%%
MC multi-circuit homeruns have makeup included
($\text{Length} \times 1.1$)
+1
View File
@@ -3,6 +3,7 @@ id: 2025-12-02T10:40:00-0500
title: 2025-12-02 10:40:??
tags:
- topic/construction/electrical
- exclude-from-word-count
daily: "[[2025-12-02]]"
---
# 2025-12-02 10:40:??
+1 -1
View File
@@ -1,7 +1,7 @@
---
id: 2025-12-02T10:57:00-0500
title: 2025-12-02 10:57:??
tags:
tags: []
daily: "[[2025-12-02]]"
---
# 2025-12-02 10:57:??
+1 -1
View File
@@ -1,7 +1,7 @@
---
id: 2025-12-02T13:20:00-0500
title: 2025-12-02 13:20:??
tags:
tags: []
daily: "[[2025-12-02]]"
---
# 2025-12-02 13:20:??
+1 -4
View File
@@ -1,10 +1,7 @@
---
id: 2025-12-03T15:54:22-0500
title: 2025-12-03 15:54:22
tags:
- status/draft
- topic/estimating
- topic/transparency
tags: []
daily: "[[2025-12-03]]"
---
# 2025-12-03 15:54:22
-1
View File
@@ -2,7 +2,6 @@
id: 2025-12-04T09:51:17-0500
title: 2025-12-04 09:51:17
tags:
- status/draft
- topic/automation
daily: "[[2025-12-04]]"
---
+2 -1
View File
@@ -6,7 +6,8 @@ daily: "[[2025-12-18]]"
---
# 2025-12-18 15:22:??
PDI has moved up the schedule to transition to [[accubid|Accubid]] Anywhere
[[pdi-estimating]] has moved up the schedule
to transition to [[accubid|Accubid]] Anywhere
and will be signing a contract with Trimble in late January.
[Drawer AI | Automated Electrical Takeoff & Estimating](https://drawer.ai/)
+1 -1
View File
@@ -8,7 +8,7 @@ daily: "[[2025-12-19]]"
# 2025-12-19 10:44:??
[[2025w51|This week]]
William Bonn, as part of [[units-takeoff]] for Howard University East Towers,
William Bonn, as part of [[units-takeoff]] for [[howard-university-east-towers]],
used an `Area` "Typical - Unit Balconies" for `Phase` "UNIT - RESIDENTIAL" takeoff.
Our senior [[joel-jansen]] approved of the method.
+2
View File
@@ -8,6 +8,8 @@ daily: "[[2026-01-02]]"
### Harborside Plaza 4
%% [[harborside-plaza-4]]
#### TODO
* [ ] [[electrical-takeoff|Electrical]]
+1 -1
View File
@@ -8,7 +8,7 @@ daily: "[[2026-01-07]]"
%%
Speculation about the meaning of [[construction]] terminology
as understood by other contractors.
as understood by other [[construction-contracting|contractors]].
%%
At [[ace-electric-inc|Ace]],
+4
View File
@@ -18,6 +18,8 @@ as reviewed with [[joel-jansen]]:
### Lighting Control
Relevant to [[lighting-controls-takeoff]]:
I took off lighting per plans (E510)
in spite of proposal stating "local control".
Will have to be changed.
@@ -35,6 +37,8 @@ Units
### Fixtures
Relevant to [[fixtures-takeoff]]:
> [!failure]
> Several fixtures were erroneously based on NM cable.
+4
View File
@@ -6,6 +6,10 @@ daily: "[[2026-01-09]]"
---
# 2026-01-09 12:00:??
%%
Exact ratios of Greegorian calendar units.
%%
$$
\begin{gather*}
\frac{146097}{400} = 365.2425~\text{Days Per Year} \
+2 -1
View File
@@ -30,7 +30,8 @@ attended by [[joel-jansen]] and myself.
#### Lighting Control
Follow up to [[2026-01-09_10-00-03#Lighting Control]]
Follow-up to [[2026-01-09_10-00-03#Lighting Control]].
Relevant to [[lighting-controls-takeoff]].
Josh stated my takeoff was correct per drawings,
but that concessions would need to be made for the scope
+1 -1
View File
@@ -64,7 +64,7 @@ Intent is to have conversations before contract
There will be bad estimates, bad proposals,
but ConEst's role is to prevent PDI _from making bad deals_
> [!quote] [[joel-jansen]], pp.
> [!quote] [[joel-jansen]] (pp.)
> Similar could be said by Ops about ConEst.
> ~~They have more time than us~~
+1 -1
View File
@@ -22,7 +22,7 @@ Evidence for the theory seems to come down to two points:
While it only appears to mess with space in the book,
it didn't feel like a stretch at all
to imagine that the entity had moved Zampanò from a different timeline,
or better yet, deleted all evidence of its existence
or better yet, deleted all evidence of its own existence
(present in _The Navidson Record_ and Zampanò's sources).
* **Zampanò is personally invested in _The Navidson Record_.**