diff --git a/2025-11-04_belle-meade-director-review.md b/2025-11-04.md similarity index 100% rename from 2025-11-04_belle-meade-director-review.md rename to 2025-11-04.md diff --git a/2025-11-18.md b/2025-11-18.md new file mode 100644 index 0000000..9ccdb28 --- /dev/null +++ b/2025-11-18.md @@ -0,0 +1,60 @@ +--- +id: +aliases: [] +tags: + - authorship/original + - destiny/permanent + - status/draft + - type/daily +title: "" +--- +# 2025-11-18 + +## 2025-11-18 16:33 + +%% +Transcription of notes +taken while reviewing Elliot St. with Joel Jansen. +%% + +Adorne USB Heating Designation was built with standard device. +Subbed for Adorne. + +Subbed standard duplex receptacles in guestrooms for Adorne. + +Confirmed fixture branch length changes +including Garage + +Note: It is not usually necessary to count emergency fixtures separately. + +Use minimum 1 hour for tape lights, except in units (minimum 0.5hr). + +Final Pricing adjustments: +Warranty, +CIP (see proposal) + +Added putty pads. + +Fire stopping budget = $25-35 per Unit. + +Robotic Total Station hours: match Structural Foreman. + +Equipment Cost $\approx$ 1% for contracts 5-15 million dollars. + +Mid Atlantic: 1 trip per month + +Offsite Parking: see bid sheet + +Project Executive time same as Oversight. + +When calculating durations for indirect labor, round down. + +* Rough Foreman +* Trim Foreman +* Amenity Foreman + +LV/FA Foreman: get hours from systems quote. + +Fire Alarm, Two-Way Communication, DAS: `Phase` = "Fire Alarm" + +Erroneously used WP GFI's in bathrooms, subbed for Kitchen/Bath assembly. diff --git a/fire-alarm-takeoff.md b/fire-alarm-takeoff.md index 8c181f6..dfb94ae 100644 --- a/fire-alarm-takeoff.md +++ b/fire-alarm-takeoff.md @@ -141,11 +141,15 @@ Vertical: ### Smoke Detectors +`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`INITIATING DEVICES WITH WIRE - ...`/`SMOKE DETECTOR W/ BASE - ...` + _Design Build:_ Count every stairwell at every level. ### Pull Stations +`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`INITIATING DEVICES WITH WIRE - ...`/`PULL STATION - ...` + _Design Build:_ Count every stairwell at every level and every exterior exit. @@ -165,7 +169,9 @@ _Design Build:_ Count 2 for every set of double doors. (Typical of elevator lobbies and corridors) -### Speaker Strobes +### Horns, Speakers, and Strobes + +`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`INDICATING DEVICES WITH WIRE - ...`/`INDOOR HORN STROBE - ...` _Design Build:_ * Count every 75 ft, diff --git a/pdi-labor-plan.md b/pdi-labor-plan.md index 40c5247..29daed6 100644 --- a/pdi-labor-plan.md +++ b/pdi-labor-plan.md @@ -2,46 +2,45 @@ id: aliases: [] tags: + - authorship/other-for-now - destiny/permanent - occupational - status/incomplete - type/guide - - authorship/other-for-now title: PDI Labor Plan --- # PDI Labor Plan 1. Fill out project basics -2. Check that everything is sorted into correct Phase and Area (Extension: Phase - Area) +2. Check that everything is sorted into correct `Phase` and `Area` (Extension: Phase - Area) 3. Move everything in BUILDING FA systems into FA phase - * Create a Phase named: "Fire Alarm" - * Check system and Bid Item + * Create `Phase` = "Fire Alarm" + * Check `System` and `Bid Item` * Scroll through each and select all line items `FA - ...` - * Change Breakdown to "Fire Alarm" phase + * Set `Phase` = "Fire Alarm" -4. Separate all Phases into their proper corresponding "Labor Factor" +4. Separate all Phases into their proper corresponding `Labor Factor` - * Check Phase box - * Start scrolling through beginning with N/A - * Change breakdown of everything in each phase to the proper labor factor + * Scroll through each `Phase` + * Change breakdown of everything in each phase to the proper `Labor Factor` * Do not move Temp Power (buckets) or site 5. Use the Accubid Extension tab to fill out the "Unit Lbr Calc" tab in the labor plan -6. Select the "Phase / Sort Code" extension view +6. Select extension view "Phase / Sort Code" -7. Open "UNIT RESIDENTIAL" and "Building - Corridors" phases +7. Open `Phase` "UNIT RESIDENTIAL" and "Building - Corridors" 8. Go into each Sort code to find the count for each unit item - | Code | Description | + | Code | Description | | ---- | -------------------- | - | 200 | rough | - | 300 | trim | - | 400 | rough wire and cable | + | 200 | rough | + | 300 | trim | + | 400 | rough wire and cable | 9. Some items will autofill when you fill out the "Accubid Extension Totals" table on the right @@ -50,14 +49,14 @@ title: PDI Labor Plan 10. Fill out the "Labor for Concrete Slab/Deck Labor" table on the labor sheet calc tab * For the floor counts, if there are multiple buildings, add their total level count together - - * 2 buildings that each have 10 floors, input 20 for "number of floors - building + * 2 buildings that each have 10 floors, input 20 for "number of floors - building * Add any useful description to the naming - * Can change "Other" to something more prevalent on the project + * Can change "Other" to something more prevalent on the project - * "pour section rate" refers to the size of each slab that will be poured (sometimes will be shown on the structural plans) + * "pour section rate" refers to the size of each slab that will be poured + * sometimes will be shown on the structural plans - * "Number of days per…" is found by multiplying "Pour Section Qty" by 4 or 5 + * "Number of days per..." equals "Pour Section Qty" times 4 or 5 -11. Check that everything is sorted into correct Phase and Area (Extension: Phase - Area) +11. Check that everything is sorted into correct `Phase` and `Area` (Extension: "Phase - Area") diff --git a/telecom-takeoff.md b/telecom-takeoff.md index cc86eca..251ae95 100644 --- a/telecom-takeoff.md +++ b/telecom-takeoff.md @@ -38,6 +38,10 @@ Size and quantity per proposal > drawings > assume (4) 4"C _Garden Style:_ Outside of every building +> [!important] Long-Radius Elbows +> Note requirements for long-radius elbows, +> substitute items as necessary. + ### Telecom Vaults "Quazite Box" @@ -117,3 +121,6 @@ As shown on plans. Ignore floor boxes, other electrical scope. * .../`BOH / AMENITY ASSEMBLIES` * .../`SCREWLESS DECORA COVERS UNITS / BOH` * .../`ROUGH IN ASSY` + +If system is included, take off _both_ rough-in and device assemblies +in amenity areas. diff --git a/units-takeoff.md b/units-takeoff.md index 0257725..51c79d8 100644 --- a/units-takeoff.md +++ b/units-takeoff.md @@ -98,8 +98,16 @@ Eaton 35M2W ### Telecom Homeruns +#### Residential + Included in MSDE. +#### Key + +`COMMON ASSEMBLIES`/`TELECOM SYSTEMS`/`BOH AMENITY ASSEMBLIES`/... + +Adjust cable length as needed. + ### Fire Alarm Devices #### Residential @@ -116,4 +124,6 @@ For ADA units: ##### Additional Signaling Devices -==use free air devices== +`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`INDICATING DEVICES WITH WIRE - ...`/`UNIT HORN/STROBE - ...` + +#### Key \ No newline at end of file