@@ -95,7 +95,11 @@ The feeder conductor ampacity shall not be less than that of the service conduct
#### 215.2(B) Feeders over 1000 Volts. #### 215.2(B) Feeders over 1000 Volts.
The ampacity of conductors shall be in accordance with 310.14 and 311.60 as applicable. Where installed, the size of the feeder-circuit grounded conductor shall not be smaller than that required by 250.122, except that 250.122(F) shall not apply where grounded conductors are run in parallel. Feeder conductors over 1000 volts shall be sized in accordance with 215.2(B)(1), (B)(2), or (B)(3). The ampacity of conductors
shall be in accordance with [[nfpa-70_310_conductors_for_general_wiring#310.14 Ampacities for Conductors Rated 0 Volts -- 2000 Volts.|310.14]]
and [[nfpa-70_311_mv-conductors#311.60 Ampacities of Conductors.|311.60]]
as applicable.
Where installed, the size of the feeder-circuit grounded conductor shall not be smaller than that required by 250.122, except that 250.122(F) shall not apply where grounded conductors are run in parallel. Feeder conductors over 1000 volts shall be sized in accordance with 215.2(B)(1), (B)(2), or (B)(3).
##### 215.2(B)(1) Feeders Supplying Transformers. ##### 215.2(B)(1) Feeders Supplying Transformers.
@@ -108,13 +112,16 @@ when only transformers are supplied.
The ampacity of feeders supplying a combination The ampacity of feeders supplying a combination
of transformers and utilization equipment of transformers and utilization equipment
shall not be less than the sum of the nameplate ratings of the transformers shall not be less than the sum
and 125 percent of the designed potential load of the utilization equipment of the nameplate ratings of the transformers
and 125 percent of the designed potential load
of the utilization equipment
that will be operated simultaneously. that will be operated simultaneously.
##### 215.2(B)(3) Supervised Installations. ##### 215.2(B)(3) Supervised Installations.
For supervised installations, feeder conductor sizing shall be permitted For supervised installations,
feeder conductor sizing shall be permitted
to be determined by qualified persons under engineering supervision to be determined by qualified persons under engineering supervision
in accordance with 310.14(B) or 311.60(B). in accordance with 310.14(B) or 311.60(B).
Supervised installations are defined as those portions of a facility Supervised installations are defined as those portions of a facility
+6 -2
View File
@@ -347,9 +347,13 @@ Note: If no adjustment or correction factors are required, this table shall be p
##### 310.14(A)(1) Tables or Engineering Supervision. ##### 310.14(A)(1) Tables or Engineering Supervision.
Ampacities for conductors shall be permitted to be determined by tables as provided in 310.15 or under engineering supervision, as provided in 310.14(B). Ampacities for conductors
shall be permitted to be determined by tables
as provided in 310.15
or under engineering supervision,
as provided in 310.14(B).
> [!info]Informational Note No. 1: > [!info] Informational Note No. 1:
> Ampacities provided by this section > Ampacities provided by this section
> do not take voltage drop into consideration. > do not take voltage drop into consideration.
> See 210.19(A), Informational Note No. 4, for branch circuits > See 210.19(A), Informational Note No. 4, for branch circuits
+14 -11
View File
@@ -336,9 +336,7 @@ Cables shall be permitted to be marked to indicate special characteristics of th
Type MV cable shall be installed, terminated, and tested by qualified persons. Type MV cable shall be installed, terminated, and tested by qualified persons.
> [!info] Informational Note No. 1: > [!info] Informational Note No. 1:
> Information about accepted industry practices and installation procedures for medium-voltage cable are described in ANSI/NECA/NCSCB 600, Standard for Installing and Maintaining Medium-Voltage Cable, and in IEEE 576, Recommended > Information about accepted industry practices and installation procedures for medium-voltage cable are described in ANSI/NECA/NCSCB 600, Standard for Installing and Maintaining Medium-Voltage Cable, and in IEEE 576, Recommended Practice for Installation, Termination, and Testing of Insulated Power Cables as Used in Industrial and Commercial Applications.
Practice for Installation, Termination, and Testing of Insulated Power Cables as Used in Industrial and Commercial Applications.
> [!info] Informational Note No. 2: > [!info] Informational Note No. 2:
> Where medium-voltage cable is used for dc circuits, low frequency polarization can create hazardous voltages. When handling the cable these voltages may be present or may develop on dc stressed cable while the circuit is energized. > Where medium-voltage cable is used for dc circuits, low frequency polarization can create hazardous voltages. When handling the cable these voltages may be present or may develop on dc stressed cable while the circuit is energized.
@@ -373,9 +371,7 @@ Type MV cable shall be permitted for use on power systems rated up to and includ
Type MV conductors and cables used for direct burial applications shall be shielded, identified for such use, and installed in accordance with 300.50. Type MV conductors and cables used for direct burial applications shall be shielded, identified for such use, and installed in accordance with 300.50.
> [!important] Exception No. 1: > [!important] Exception No. 1:
> Nonshielded multiconductor cables rated 2001 volts to 2400 volts shall be permitted if the cable has an overall metallic sheath or armor. > Nonshielded multiconductor cables rated 2001 volts to 2400 volts shall be permitted if the cable has an overall metallic sheath or armor. The metallic shield, sheath, or armor shall be connected to a grounding electrode conductor, a grounding busbar, or a grounding electrode.
The metallic shield, sheath, or armor shall be connected to a grounding electrode conductor, a grounding busbar, or a grounding electrode.
> [!important] Exception No. 2: > [!important] Exception No. 2:
> Airfield lighting cable used in series circuits that are rated up to 5000 volts and are powered by regulators shall be permitted to be nonshielded. > Airfield lighting cable used in series circuits that are rated up to 5000 volts and are powered by regulators shall be permitted to be nonshielded.
@@ -428,13 +424,19 @@ Nonshielded, ozone-resistant insulated conductors with a maximum phase-to-phase
##### 311.60(A)(1) Tables or Engineering Supervision. ##### 311.60(A)(1) Tables or Engineering Supervision.
Ampacities for solid dielectric-insulated conductors shall be permitted to be determined by tables or under engineering supervision, as provided in 311.60(B) and (C). Ampacities for solid dielectric-insulated conductors
shall be permitted to be determined by tables
or under engineering supervision,
as provided in 311.60(B) and (C).
The ampacity of Type MV cable installed in cable tray shall be determined in accordance with 392.80(B). The ampacity of Type MV cable installed in cable tray
shall be determined in accordance with
[[nfpa-70_392_cable-tray#392.80(B) Ampacity of Type MV and Type MC Cables (2001 Volts or Over) in Cable Trays.|392.80(B)]].
##### 311.60(A)(2) Selection of Ampacity. ##### 311.60(A)(2) Selection of Ampacity.
Where more than one calculated or tabulated ampacity could apply for a given circuit length, the lowest value shall be used. Where more than one calculated or tabulated ampacity could apply for a given circuit length,
the lowest value shall be used.
> [!important] Exception: > [!important] Exception:
> Where different ampacities apply to portions of a circuit, the higher ampacity shall be permitted to be used if the total portion(s) of the circuit with the lower ampacity does not exceed the lesser of 3.0 m (10 ft) or 10 percent of the total circuit. > Where different ampacities apply to portions of a circuit, the higher ampacity shall be permitted to be used if the total portion(s) of the circuit with the lower ampacity does not exceed the lesser of 3.0 m (10 ft) or 10 percent of the total circuit.
@@ -446,7 +448,7 @@ Where more than one calculated or tabulated ampacity could apply for a given cir
Under engineering supervision, conductor ampacities shall be permitted to be calculated by using the following general equation: Under engineering supervision, conductor ampacities shall be permitted to be calculated by using the following general equation:
### Equation 311.60(B) ##### Equation 311.60(B)
%% TODO %% %% TODO %%
@@ -477,7 +479,8 @@ Ampacities for ambient temperatures other than those specified in the ampacity t
> For ampacities calculated in accordance with 311.60(A), reference IEEE 835, Standard Power Cable Ampacity Tables, and the references therein for availability of all factors and constants. > For ampacities calculated in accordance with 311.60(A), reference IEEE 835, Standard Power Cable Ampacity Tables, and the references therein for availability of all factors and constants.
> [!info] Informational Note No. 2: > [!info] Informational Note No. 2:
> Ampacities provided by this section do not take voltage drop into consideration. See 210.19(A), Informational Note No. 4, for branch circuits and 215.2(A), Informational Note No. 2, for feeders. > Ampacities provided by this section do not take voltage drop into consideration.
> See 210.19(A), Informational Note No. 4, for branch circuits and 215.2(A), Informational Note No. 2, for feeders.
##### Table 311.60(C)(67) Ampacities of Insulated Single Copper Conductor Cables Triplexed in Air ##### Table 311.60(C)(67) Ampacities of Insulated Single Copper Conductor Cables Triplexed in Air
+6
View File
@@ -6,3 +6,9 @@ tags:
- type/encyclopedia-entry - type/encyclopedia-entry
--- ---
# Obsidian # Obsidian
[obsidian.md](https://obsidian.md)
## Obsidian Flavored Markdown
[Obsidian-flavored markdown](https://help.obsidian.md/)
+23
View File
@@ -0,0 +1,23 @@
---
aliases:
- ops
title: PDI Operations
tags:
- occupational
---
# PDI Operations
## Roles
1. Chairman (1)
2. Chief Operating Officer (1)
3. Executive Vice President
4. Senior Vice President
5. Vice President of Construction Operations
6. Project Executive
7. Project Manager
8. Senior Project Superintendent
9. Superintendent
10. Foreman
### Project Manager
+10
View File
@@ -0,0 +1,10 @@
---
id: 2026-04-23
title: 2026-04-23
tags: []
weekly: "[[2026w17]]"
monthly: "[[2026-04]]"
quarterly: "[[2026q2]]"
previous: "[[2026-04-22]]"
---
# 2026-04-23
+100
View File
@@ -0,0 +1,100 @@
---
id: 2026-04-23T10:01:40-0400
title: 2026-04-23 10:01:40
tags: []
daily: "[[2026-04-23]]"
---
# 2026-04-23 10:01:40
## Virginia Live! Director Review
[[estimating-director-review]] for
[[virginia-live-casino-and-hotel]]:
## Switchgear
Note extensive emergency power provisions
verify control wiring for generator to ATS
#### Lighting HR's
count of circuits, control zones in takeoff notes
lot length
#### Temporary Power
Used two `TEMPORARY POWER - HR`
Narrative
extended light layouts
#### Generator
3000 gallons * 6 dollars per gallon = $18000
#### Labor
ASL Column 2 with adjustments
Site Labor +50%
#### Telecom Backbone
#### Medium Voltage
Medium voltage cabling downstream of
#### Underground Runs
need rigid 90's for PVC runs 200ft and above
> horizontal? vertical? both?
#### Fixture Labor
Tape light: 1 hour per 6 feet
snap together linear: 1 hour per 5 feet
##### Center Bar Fixture
assuming each crystal is an individual fixture
over 5000 crystals
80 circuits
A-GAM-442
##### Dragon Fixture
1000 hours
#### Lighting Control
"Networked" to mean either
"Centralized"
or "Standalone" with Network Bridges.
> Wattstopper Network Bridges are limited to 64 devices (zones)
#### DAS
Sold Design Build
#### Historicals
Want to know
casino cost per square foot
#### Composite Cleanup
#### Multi-Shift Impact
20% of hours
add $5 per hour
#### Indirect Labor
16% burden
#### Facade
Extra cost for facade lighting install
250,000
"Go to 150k"
+14
View File
@@ -0,0 +1,14 @@
---
id: 2026-04-23T14:36:51-0400
title: 2026-04-23 14:36:51
tags: []
daily: "[[2026-04-23]]"
---
# 2026-04-23 14:36:51
Need to refresh myself on
[[nfpa-70_311_mv-conductors]]
Note that 2023 moved MV content to
Article 314 Part 3
and Article 315
+19
View File
@@ -0,0 +1,19 @@
---
id: 2026-04-23T16:24:49-0400
title: 2026-04-23 16:24:49
tags:
- occupational
daily: "[[2026-04-23]]"
---
# 2026-04-23 16:24:49
I asked a former [[pdi-operations#Project Manager|PM]]
what purpose [[conest|ConEst]] serves
if [[pdi-operations|Ops]] is doing the same takeoff.
He said I was mistaken,
that Ops modifies the ConEst estimate,
they don't redo it.
When Ops receives the [[pdi-vdc|VDC]] Feeder Verification Sheet
(which is based on our own [[pdi-project-start-notification#Feeder Verification]])
they change our takeoff to match.
+13
View File
@@ -0,0 +1,13 @@
---
id: 2026-04-23T17:41:32-0400
title: 2026-04-23 17:41:32
tags: []
daily: "[[2026-04-23]]"
---
# 2026-04-23 17:41:32
## Professional Certifications
* Project Management Professional (PMP)
* Certified Quality Engineer (CQE)
* Lean Six Sigma Black Belt (LSBB)