vault backup: 2026-05-04 17:15:02
This commit is contained in:
+20
-20
@@ -45,20 +45,6 @@ add `ITEM DATABASE`/`WIRING & SYSTEM DEVICES`/`FLOOR BOXES & FITTTINGS`/`GENERIC
|
||||
Takeoff homeruns in Building breakdowns,
|
||||
even where serving Amenity spaces.
|
||||
|
||||
## Clubline Raceway
|
||||
|
||||
[Raceway Systems - CRG](https://crg.us.com/products/raceway-systems/)
|
||||
|
||||
Clubline Raceway, also called CRG Raceway,
|
||||
is a glorified cable management trough.
|
||||
It is not a [[nfpa-70_376|wireway]],
|
||||
so conductors must be run in a [[nfpa-70_national-electric-code#Chapter 3 Wiring Methods and Materials|Chapter 3]] wiring method.
|
||||
|
||||
Count receptacles normally,
|
||||
using ==surface-mount EMT assemblies==.
|
||||
|
||||
Create a temporary item for the raceway itself.
|
||||
|
||||
## Mechanical Connections
|
||||
|
||||
`COMMON ASSEMBLIES`/`MECHANICAL CONNECTIONS ...`/...
|
||||
@@ -74,12 +60,12 @@ per [[fire-resistive-wiring-methods-takeoff]].
|
||||
|
||||
#### Unit Condensing Units
|
||||
|
||||
| Level | Horizontal | Vertical | Length | Count |
|
||||
|:-------- | ----------:| --------:| ------:| -----:|
|
||||
| Level 01 | 150 | 40 | 190 | |
|
||||
| Level 02 | 150 | 30 | 180 | |
|
||||
| Level 03 | 150 | 20 | 170 | |
|
||||
| Level 04 | 150 | 10 | 160 | |
|
||||
| Level | Horizontal | Vertical | Length |
|
||||
|:-------- | ----------:| --------:| ------:|
|
||||
| Level 01 | 150 | 40 | 190 |
|
||||
| Level 02 | 150 | 30 | 180 |
|
||||
| Level 03 | 150 | 20 | 170 |
|
||||
| Level 04 | 150 | 10 | 160 |
|
||||
|
||||
Put homeruns on the `Area` of the dwelling unit.
|
||||
Put connections on the `Area` of the CU.
|
||||
@@ -123,3 +109,17 @@ Max 20 disconnects per rack
|
||||
### Fire/Smoke Dampers
|
||||
|
||||
[[fire-alarm-takeoff#Fire/Smoke Dampers (FSD's)]]
|
||||
|
||||
## Clubline Raceway
|
||||
|
||||
[Raceway Systems - CRG](https://crg.us.com/products/raceway-systems/)
|
||||
|
||||
Clubline Raceway, also called CRG Raceway,
|
||||
is a glorified cable management trough.
|
||||
It is not a [[nfpa-70_376|wireway]],
|
||||
so conductors must be run in a [[nfpa-70_national-electric-code#Chapter 3 Wiring Methods and Materials|Chapter 3]] wiring method.
|
||||
|
||||
Count receptacles normally,
|
||||
using ==surface-mount EMT assemblies==.
|
||||
|
||||
Create a temporary item for the raceway itself.
|
||||
Reference in New Issue
Block a user