vault backup: 2026-05-04 17:15:02

This commit is contained in:
2026-05-04 17:15:02 -04:00
parent ff99ba112d
commit d0527ac4f6
45 changed files with 385 additions and 182 deletions
+9 -6
View File
@@ -22,7 +22,7 @@ Where `COMMON ASSEMBLIES`/`PDI EMPTY & DUCTBANK CONDUIT`/...
is specified, `FEEDER CONDUIT AND WIRE`/...
is also acceptable.
## "Site Low Voltage Duct Bank"
## Site Low Voltage Duct Bank
1. * `Area` = "2 - Site"
* `Phase` = "Site"
@@ -58,7 +58,9 @@ Alternative
* `Phase` = "Building - BOH ..."
* `System` = "TC - Telecom Backbone"
(2) 4"C or (4) 4"C if not shown
If not shown:
* _Garden Style:_ (2) 4"C
* _High Rise, Mid Rise:_ (4) 4"C
### Horizontal Backbone
@@ -78,7 +80,7 @@ Alternative
* Delete elbows if unnecessary.
* **Length** = Height between floors (Minimum 15ft)
## Telecom Backboard
## Telecom Backboards
As shown on plans,
only if not excluded in proposal.
@@ -89,7 +91,7 @@ only if not excluded in proposal.
`COMMON ASSEMBLIES`/`MISC ASSEMBLIES`/`... PLYWOOD BACKBOARD`
* **Count** = As shown
## Corridor Conduit (Unit MSDE to IDF)
## Corridor Conduit (IDF to Unit MSDE)
One Takeoff per Area per level
@@ -97,6 +99,7 @@ One Takeoff per Area per level
* **Length** = Average of subfeed lengths * # of Units
* **Count** = # of Units
[[2026-05-04_14-57-49]]
## Inner Duct
For future use (e.g. fiber)
@@ -112,8 +115,8 @@ _Alternative:_
## Devices
As shown on plans.
Ignore scope shared with [[electrical-takeoff|electrical]].
(e.g. floor boxes)
Ignore scope shared with [[electrical-takeoff|electrical]]
(e.g. floor boxes).
1. `COMMON ASSEMBLIES`/`TELECOM SYSTEMS`/...
* .../`BOH / AMENITY ASSEMBLIES`