vault backup: 2026-05-04 17:15:02
This commit is contained in:
+9
-6
@@ -22,7 +22,7 @@ Where `COMMON ASSEMBLIES`/`PDI EMPTY & DUCTBANK CONDUIT`/...
|
||||
is specified, `FEEDER CONDUIT AND WIRE`/...
|
||||
is also acceptable.
|
||||
|
||||
## "Site Low Voltage Duct Bank"
|
||||
## Site Low Voltage Duct Bank
|
||||
|
||||
1. * `Area` = "2 - Site"
|
||||
* `Phase` = "Site"
|
||||
@@ -58,7 +58,9 @@ Alternative
|
||||
* `Phase` = "Building - BOH ..."
|
||||
* `System` = "TC - Telecom Backbone"
|
||||
|
||||
(2) 4"C or (4) 4"C if not shown
|
||||
If not shown:
|
||||
* _Garden Style:_ (2) 4"C
|
||||
* _High Rise, Mid Rise:_ (4) 4"C
|
||||
|
||||
### Horizontal Backbone
|
||||
|
||||
@@ -78,7 +80,7 @@ Alternative
|
||||
* Delete elbows if unnecessary.
|
||||
* **Length** = Height between floors (Minimum 15ft)
|
||||
|
||||
## Telecom Backboard
|
||||
## Telecom Backboards
|
||||
|
||||
As shown on plans,
|
||||
only if not excluded in proposal.
|
||||
@@ -89,7 +91,7 @@ only if not excluded in proposal.
|
||||
`COMMON ASSEMBLIES`/`MISC ASSEMBLIES`/`... PLYWOOD BACKBOARD`
|
||||
* **Count** = As shown
|
||||
|
||||
## Corridor Conduit (Unit MSDE to IDF)
|
||||
## Corridor Conduit (IDF to Unit MSDE)
|
||||
|
||||
One Takeoff per Area per level
|
||||
|
||||
@@ -97,6 +99,7 @@ One Takeoff per Area per level
|
||||
* **Length** = Average of subfeed lengths * # of Units
|
||||
* **Count** = # of Units
|
||||
|
||||
[[2026-05-04_14-57-49]]
|
||||
## Inner Duct
|
||||
|
||||
For future use (e.g. fiber)
|
||||
@@ -112,8 +115,8 @@ _Alternative:_
|
||||
## Devices
|
||||
|
||||
As shown on plans.
|
||||
Ignore scope shared with [[electrical-takeoff|electrical]].
|
||||
(e.g. floor boxes)
|
||||
Ignore scope shared with [[electrical-takeoff|electrical]]
|
||||
(e.g. floor boxes).
|
||||
|
||||
1. `COMMON ASSEMBLIES`/`TELECOM SYSTEMS`/...
|
||||
* .../`BOH / AMENITY ASSEMBLIES`
|
||||
|
||||
Reference in New Issue
Block a user