vault backup: 2026-06-03 17:01:51
This commit is contained in:
+1
-1
@@ -2,7 +2,7 @@
|
||||
"citationExportFormat": "biblatex",
|
||||
"literatureNoteTitleTemplate": "@{{citekey}}",
|
||||
"literatureNoteFolder": "",
|
||||
"literatureNoteContentTemplate": "---\ntitle: {{title}}\nauthor: {{authorString}}\nyear: {{year}}\n---\n\n",
|
||||
"literatureNoteContentTemplate": "---\naliases:\n - {{title}}\ntitle: {{title}}\nauthor: {{authorString}}\nyear: {{year}}\n---\n\n",
|
||||
"markdownCitationTemplate": "[@{{citekey}}]",
|
||||
"alternativeMarkdownCitationTemplate": "[@{{citekey}}]",
|
||||
"citationExportPath": "bibliography.bib"
|
||||
|
||||
@@ -308,6 +308,14 @@
|
||||
langid = {english}
|
||||
}
|
||||
|
||||
@audio{savio_1964_sitin-address-steps,
|
||||
title = {Sit-in {{Address}} on the {{Steps}} of {{Sproul Hall}}},
|
||||
namea = {Savio, Mario},
|
||||
nameatype = {collaborator},
|
||||
date = {1964-12-02},
|
||||
location = {Sproul Hall, University of California at Berkeley}
|
||||
}
|
||||
|
||||
@article{seppanen_2025_integrated-forecasting,
|
||||
title = {Integrated {{Forecasting Approach}} for {{Takt}} and {{Location-Based Scheduling}}},
|
||||
author = {Seppänen, Olli},
|
||||
|
||||
@@ -0,0 +1,16 @@
|
||||
---
|
||||
title: ConEst Body of Knowledge
|
||||
tags:
|
||||
- occupational
|
||||
up: "[[conest]]"
|
||||
---
|
||||
# ConEst Body of Knowledge
|
||||
|
||||
_Official_ [[conest-processes|ConEst process]] documentation
|
||||
is limited to nonexistent.
|
||||
My attempt at documentation
|
||||
represents my own interpretation of expectations.
|
||||
|
||||
[[project-management-institute#PMBOK® Guide|The PMBOK® Guide]]
|
||||
is my basis for this model.
|
||||
The
|
||||
+104
-75
@@ -10,20 +10,93 @@ title: Fixture Designations
|
||||
This note details creation of fixture designations
|
||||
for use in [[fixtures-takeoff]].
|
||||
|
||||
[[luminaire-types]]
|
||||
## Name Format
|
||||
|
||||
## Naming
|
||||
There is no standard convention
|
||||
for fixture designation names
|
||||
in the [[conest-body-of-knowledge]].
|
||||
The best any estimator can do
|
||||
is be internally consistent.
|
||||
|
||||
### Format
|
||||
My own preference is similar to
|
||||
|
||||
`A - Surface (Pendant) = 2.0hrs - #12 MC+LV 20ft`,
|
||||
|
||||
described by the pseudo-[[regular-expression|regex]] below:
|
||||
|
||||
```regex
|
||||
<phase-abbr> - <assembly>(\: <assembly-subtype>)?( \(<comment>\))?( = <fixture-labor>)? <wiring-method> <branch-length>ft
|
||||
<phase-abbr> - <assembly>(: <assembly-subtype>)?( \(<comment>\))?( = <fixture-labor>)? <wiring-method> <branch-length>ft
|
||||
```
|
||||
|
||||
> [!example]
|
||||
> `A - Surface (Pendant) = 2.0hrs - #12 MC+LV 20ft`
|
||||
### Phase Abbreviation (`<phase-abbr>`)
|
||||
|
||||
### Order
|
||||
|
||||
|
||||
### Assembly (`<assembly>`)
|
||||
|
||||
[[luminaire-types]]
|
||||
|
||||
* "Surface" - Assembly includes a junction box
|
||||
* "Recessed" - Assembly does not include a junction box
|
||||
|
||||
### Assembly Subtype (`<assembly-subtype>`)
|
||||
|
||||
### Comment (`<comment>`)
|
||||
|
||||
In contrast to Assembly Subtype,
|
||||
Comment reflects a distinction between fixture types or use case
|
||||
_which does not affect the contents of the designation._
|
||||
That is, `Surface`, `Surface (Sconce)`, and `Surface (Pendant)`
|
||||
|
||||
### Fixture Labor (`<fixture-labor>`)
|
||||
|
||||
| Fixture Type | Labor |
|
||||
|:------------ | ----------:|
|
||||
| Paddle Fan | 1.5 hr/ea. |
|
||||
| Pendant | 1-4 hr/ea. |
|
||||
| Tape | 0.5 hr/6ft |
|
||||
| Site Poles | 1.5 hr/ea. |
|
||||
| Festoon | 2.0 hr/ea. |
|
||||
| All Others | 1.0 hr/ea. |
|
||||
|
||||
`FIXTURES`/`FIXTURE LABOR`/`FIXTURE LABOR 1HR`
|
||||
|
||||
### Wiring Method (`<wiring-method>`)
|
||||
|
||||
#### Conduit/Cable Type
|
||||
|
||||
#### Wire Size
|
||||
|
||||
| Case | Wire Size |
|
||||
| -------------- | --------- |
|
||||
| Site/Courtyard | #10 |
|
||||
| Garage | #10 |
|
||||
| NM Cable | #14\* |
|
||||
| All Others | #12 |
|
||||
|
||||
\*Minimum #12 in kitchens and bathrooms.
|
||||
|
||||
#### Dimming Conductors
|
||||
|
||||
### Branch Length (`<branch-length>`)
|
||||
|
||||
| Case | Standard Length |
|
||||
| --------------------- | --------------- |
|
||||
| Site/Courtyard | 50ft |
|
||||
| Garage | 50ft |
|
||||
| BOH | 40ft |
|
||||
| Corridors | 40ft |
|
||||
| Interior Amenity | 40ft |
|
||||
| Office/Retail | 50ft |
|
||||
| Exterior Amenity | 50ft |
|
||||
| Units | 20ft |
|
||||
| Undercabinet Fixtures | 10ft |
|
||||
| Stairwells | 20ft |
|
||||
| Kitchen | ? |
|
||||
|
||||
Reduce as appropriate.
|
||||
|
||||
## Order
|
||||
|
||||
Use empty designations to separate phases.
|
||||
|
||||
@@ -47,63 +120,19 @@ Use empty designations to separate phases.
|
||||
|
||||
## Content
|
||||
|
||||
### Fixture Labor
|
||||
|
||||
| Fixture Type | Labor |
|
||||
|:------------ | ----------:|
|
||||
| Paddle Fan | 1.5 hr/ea. |
|
||||
| Pendant | 1-4 hr/ea. |
|
||||
| Tape | 0.5 hr/6ft |
|
||||
| Site Poles | 1.5 hr/ea. |
|
||||
| Festoon | 2.0 hr/ea. |
|
||||
| All Others | 1.0 hr/ea. |
|
||||
|
||||
### Fixture Branch Length
|
||||
|
||||
| Case | Standard Length |
|
||||
| --------------------- | --------------- |
|
||||
| Site/Courtyard | 50ft |
|
||||
| Garage | 50ft |
|
||||
| BOH | 40ft |
|
||||
| Corridors | 40ft |
|
||||
| Interior Amenity | 40ft |
|
||||
| Office/Retail | 50ft |
|
||||
| Exterior Amenity | 50ft |
|
||||
| Units | 20ft |
|
||||
| Undercabinet Fixtures | 10ft |
|
||||
| Stairwells | 20ft |
|
||||
| Kitchen | ? |
|
||||
|
||||
Reduce as appropriate.
|
||||
|
||||
### Fixture Branch Wire size
|
||||
|
||||
| Case | Wire Size |
|
||||
| -------------- | --------- |
|
||||
| Site/Courtyard | #10 |
|
||||
| Garage | #10 |
|
||||
| NM Cable | #14[^1] |
|
||||
| All Others | #12 |
|
||||
|
||||
[^1]: Minimum #12 in kitchens and bathrooms.
|
||||
|
||||
## Garage
|
||||
|
||||
%%
|
||||
|
||||
Use ENT assemblies unless forbidden by spec.
|
||||
|
||||
| Case | Assembly Path (`FIXTURE ACCESSORIES`/`PVC/ENT ASSEMBLIES`/...) |
|
||||
| ----------------- | -------------------------------------------------------------- |
|
||||
| Case | Subassembly Path (`FIXTURE ACCESSORIES`/`PVC/ENT ASSEMBLIES`/...) |
|
||||
|:----------------- | ----------------------------------------------------------------- |
|
||||
| Conventional Slab | .../`GARAGE FIXTURE ENT W/#10 - STEEL OCT RING` |
|
||||
| Precast/I-Beam | .../`GARAGE FIXTURE W/T ROD ENT W/#10 - STEEL OCT RING` |
|
||||
|
||||
%%
|
||||
|
||||
If PVC is required, use following assemblies:
|
||||
|
||||
| Case | Assembly Path (`FIXTURE ACCESSORIES`/`PVC/ENT ASSEMBLIES`/...) |
|
||||
| ------- | -------------------------------------------------------------- |
|
||||
| Case | Subassembly Path (`FIXTURE ACCESSORIES`/`PVC/ENT ASSEMBLIES`/...) |
|
||||
|:------- |:----------------------------------------------------------------- |
|
||||
| Ceiling | .../`... - SLAB BOX / 45 DEG STUBBY` |
|
||||
| Wall | .../`... - STL BOX & TILE RING / 45 DEG STUBBY/ ENT DROP` |
|
||||
|
||||
@@ -119,8 +148,8 @@ If PVC is required, use following assemblies:
|
||||
> * Tape
|
||||
> * Track
|
||||
|
||||
| Wiring Method | Assembly Path |
|
||||
| -------------- | ----------------------------------------------------------- |
|
||||
| Wiring Method | Subassembly Path |
|
||||
|:-------------- |:----------------------------------------------------------- |
|
||||
| NM Cable | `NM ASSEMBLIES`/`RND BOX BAR HNGR...` |
|
||||
| MC Cable | `MC ASSEMBLIES`/`SQ BOX, ROUND P RING & MNTG BRKT...` |
|
||||
| PVC in Ceiling | `PVC/ENT ASSEMBLIES`/`... - SLAB BOX / 45 DEG STUBBY` |
|
||||
@@ -174,8 +203,8 @@ IA - Surface (Tape) = 7.0hr (78-89ft) - #12 MC+LV 40ft
|
||||
> * wall grazer
|
||||
> * troffer
|
||||
|
||||
| Wiring Method | Assembly Path |
|
||||
| ------------- | ------------------------------ |
|
||||
| Wiring Method | Subassembly Path |
|
||||
|:------------- |:------------------------------ |
|
||||
| NM Cable | `NM ASSEMBLIES`/`HI HAT - ...` |
|
||||
| MC Cable | `MC ASSEMBLIES`/`HI HAT - ...` |
|
||||
|
||||
@@ -188,8 +217,8 @@ round up to the nearest 5ft
|
||||
|
||||
## Undercabinet Fixtures
|
||||
|
||||
| Wiring Method | Assembly Path |
|
||||
| ------------- | ------------------------------------- |
|
||||
| Wiring Method | Subassembly Path |
|
||||
|:------------- |:------------------------------------- |
|
||||
| NM Cable | `NM ASSEMBLIES`/`UNDER CABINET - ...` |
|
||||
| MC Cable | `MC ASSEMBLIES`/`UNDER CABINET - ...` |
|
||||
|
||||
@@ -198,19 +227,21 @@ round up to the nearest 5ft
|
||||
|
||||
## Paddle Fans
|
||||
|
||||
| Wiring Method | Assembly Path |
|
||||
| ------------- | ----------------------------------------------------- |
|
||||
| Wiring Method | Subassembly Path |
|
||||
|:------------- |:----------------------------------------------------- |
|
||||
| NM Cable | `NM ASSEMBLIES`/`RND BOX BAR HNGR...` |
|
||||
| MC Cable | `MC ASSEMBLIES`/`FAN RATED OCT BOX W/ BAR HNGR - ...` |
|
||||
| PVC | `PVC/ENT ASSEMBLIES`/`... - SLAB BOX / 45 DEG STUBBY` |
|
||||
|
||||
## Guardrail Fixtures
|
||||
|
||||
> [!info] Designation Subassemblies
|
||||
`FIXTURE ACCESSORIES`/`COURTYARDS & LANDSCAPE`/`ALUM BOX W/ FLEX FIX, 3/4" CONDUIT - PVC40 - ...`
|
||||
|
||||
## Stairwells & Elevators
|
||||
|
||||
`PVC/ENT ASSEMBLIES`/`... - SLAB BOX / 45 DEG STUBBY`
|
||||
> [!info] Designation Subassemblies
|
||||
> 1. `PVC/ENT ASSEMBLIES`/`... - SLAB BOX / 45 DEG STUBBY`
|
||||
|
||||
## Facade
|
||||
|
||||
@@ -219,10 +250,11 @@ round up to the nearest 5ft
|
||||
Length and Labor will be more than a normal fixture in BOH/Amenity
|
||||
|
||||
| Fixture Type | Labor |
|
||||
| ------------ | ---------------------- |
|
||||
|:------------ |:---------------------- |
|
||||
| Non-Linear | 2hrs |
|
||||
| Linear | See [[#Tape Lighting]] |
|
||||
|
||||
> [!info] Designation Subassemblies
|
||||
> 1. `3/4" PVC W/ 3#10 - STL BOX & TILE RING / 45 DEG STUBBY/ ENT DROP`
|
||||
> * `Length per Unit` = Distance to panel
|
||||
|
||||
@@ -230,9 +262,6 @@ Length and Labor will be more than a normal fixture in BOH/Amenity
|
||||
|
||||
Create its own breakout in WBS, and phase in [[accubid|Accubid]]
|
||||
|
||||
> [!quote]
|
||||
> This is not technically exposed or drop ceiling, but still use PVC
|
||||
|
||||
## Site & Courtyard
|
||||
|
||||
> [!important]
|
||||
@@ -244,7 +273,7 @@ Create its own breakout in WBS, and phase in [[accubid|Accubid]]
|
||||
|
||||
### Pole Lights
|
||||
|
||||
> [!info] Takeoff
|
||||
> [!info] Designation Subassemblies
|
||||
> 1. `FIXTURE ACCESSORIES`/`SITE POLE ASSEMBLIES`/...
|
||||
|
||||
Add subassemblies for stub-outs, pole, base, and grounding as appropriate.
|
||||
@@ -256,7 +285,7 @@ Add subassemblies for stub-outs, pole, base, and grounding as appropriate.
|
||||
> * market lighting
|
||||
> * catenary lighting
|
||||
|
||||
> [!info] Takeoff
|
||||
> [!info] Designation Subassemblies
|
||||
> 1. `FIXTURE LABOR`/`FIXTURE LABOR 2HR`
|
||||
>
|
||||
> 2. `FESTOON & ROOF ASSEMBLIES`/`FESTOON CABLE HANGER & EYE BOLTS - LENGTH`
|
||||
@@ -267,19 +296,19 @@ Add subassemblies for stub-outs, pole, base, and grounding as appropriate.
|
||||
|
||||
### Other Fixture Types
|
||||
|
||||
| Fixture Type | Path (`FIXTURE ACCESSORIES`/`COURTYARDS & LANDSCAPE`/...) |
|
||||
| ------------------------------------ | ------------------------------------------------------------------ |
|
||||
| Fixture Type | Subassembly Path (`FIXTURE ACCESSORIES`/`COURTYARDS & LANDSCAPE`/...) |
|
||||
|:------------------------------------ |:--------------------------------------------------------------------- |
|
||||
| Step Light | .../`STEP FIX, 3/4" CONDUIT - PVC40 - ...` |
|
||||
| Bollard | .../`BOLLARD, 3/4" CONDUIT - PVC40 - ...`[^2] |
|
||||
| Bollard | .../`BOLLARD, 3/4" CONDUIT - PVC40 - ...`\* |
|
||||
| Up-light | .../`PERMA POST, 3/4" CONDUIT - PVC40 - ...` |
|
||||
| In-grade up-light | .../`3/4" CONDUIT - PVC40, IMC Elbow, ...` |
|
||||
| Fixtures built into cabanas/pergolas | .../`ALUM BOX W/ FLEX FIX, 3/4" CONDUIT - PVC40 - ...` |
|
||||
| Handrail light | .../`ALUM BOX W/ FLEX FIX, 3/4" CONDUIT - PVC40, IMC ELBOW - ...` |
|
||||
|
||||
[^2]: If we don't own concrete, delete pre-cast bollard base from assembly
|
||||
\*If we don't own concrete, delete pre-cast bollard base from assembly
|
||||
|
||||
## FAA Lighting
|
||||
|
||||
> [!info] Takeoff
|
||||
> [!info] Designation Subassemblies
|
||||
> 1. `FIXTURE LABOR`/`FIXTURE LABOR 1HR`
|
||||
> 2. `FESTOON & ROOF ASSEMBLIES`/`Aircraft Warning, 3/4" Conduit GRC/PVC 2#10, 1#10G`
|
||||
|
||||
@@ -0,0 +1,30 @@
|
||||
---
|
||||
title: My Memory
|
||||
tags: []
|
||||
up: "[[zane-meyers]]"
|
||||
---
|
||||
# My Memory
|
||||
|
||||
I have a family history of dementia,
|
||||
and I am medically predisposed to transient forgetfulness.
|
||||
Several times in my life I have found months/years old notes in my handwriting
|
||||
that I could not recall writing, on subjects I could not recall having ever understood.
|
||||
|
||||
It deeply troubles me how much time I've wasted having the same ideas,
|
||||
working through the same problems, coming to the same conclusions.
|
||||
I am afraid that my memory has been deteriorating
|
||||
and will continue to until I'm intellectually useless well before my time.
|
||||
I'm not sure how much of this fear is real
|
||||
and how much is a subconscious ploy to justify not making the effort.
|
||||
|
||||
I project this insecurity on others strongly.
|
||||
I see the same signs in other people,
|
||||
and it reminds me of my own weakness.
|
||||
I get frustrated at others for not making efforts that I don't make myself.
|
||||
I don't use this notebook as often or as well as I should.
|
||||
|
||||
> [!note]
|
||||
> I give myself a hard time here,
|
||||
> but my "failure" to make lasting mental connections
|
||||
> is relative to my perception of my ability,
|
||||
> not to observation of others'.
|
||||
@@ -0,0 +1,33 @@
|
||||
---
|
||||
title: My Productivity
|
||||
tags: []
|
||||
up: "[[zane-meyers]]"
|
||||
---
|
||||
# My Productivity
|
||||
|
||||
In as few words as possible,
|
||||
I would say I am "High Efficiency, Low Productivity".
|
||||
|
||||
I have several problematic productivity habits.
|
||||
|
||||
#### Motivation
|
||||
|
||||
My primary motivators are curiosity and stress.
|
||||
|
||||
I find it very easy and natural
|
||||
to work on projects for extended, uninterrupted periods
|
||||
when I am investigating a new problem,
|
||||
or a potential new way to solve a problem.
|
||||
|
||||
Because of this I often spend hours working on things
|
||||
that will not benefit me or anyone else.
|
||||
Even if they _could_ be useful, my motivation ends with my curiosity
|
||||
around 90% progress, where I'm able to visualize the end result.
|
||||
|
||||
I find it near impossible to do work I'm not curious of
|
||||
until my subconscious determines that we have exactly enough time
|
||||
to finish it before the deadline.
|
||||
|
||||
I think I spend much more time bored than my peers.
|
||||
Others with as much free time as me
|
||||
tend to spend it exercising or in other more reasonable activities.
|
||||
@@ -0,0 +1,11 @@
|
||||
---
|
||||
title: My Purpose
|
||||
tags: []
|
||||
up: "[[zane-meyers]]"
|
||||
---
|
||||
# My Purpose
|
||||
|
||||
I want to be involved construction estimating for the rest of my working life.
|
||||
Current discourse on the subject is self-similar and sanitized.
|
||||
I'd like to be known as an innovator in [[heterodox-construction-estimating]],
|
||||
and for solving some of its open problems.
|
||||
@@ -8,3 +8,5 @@ quarterly: "[[2026q2]]"
|
||||
previous: "[[2026-06-02]]"
|
||||
---
|
||||
# 2026-06-03
|
||||
|
||||
testing^[[[2025-08-15_14-15-41]]]
|
||||
|
||||
@@ -8,3 +8,15 @@ tags: []
|
||||
# Project Management Institute (PMI)
|
||||
|
||||
[The Project Management Institute](https://pmi.org)
|
||||
|
||||
## PMBOK® Guide
|
||||
|
||||
[ _A Guide to the Project Management Body of Knowledge (PMBOK® Guide)_](https://www.pmi.org/standards/pmbok)
|
||||
is PMI's most notable publication.
|
||||
The namesake "project management body of knowledge"
|
||||
is not a separate document,
|
||||
but an abstract concept
|
||||
of the mutual understanding
|
||||
of all project management professionals.
|
||||
Concepts from the guide
|
||||
are ostensibly derived from this body of knowledge.
|
||||
|
||||
@@ -7,14 +7,9 @@ creator:
|
||||
- type: speaker
|
||||
text: Mario Savio
|
||||
date: 1964-12-02
|
||||
description: >
|
||||
Address delivered by Mario Savio 2 December 1964,
|
||||
at The University of California at Berkeley,
|
||||
prior to a sit-in protesting the university's ban
|
||||
on political activities on campus.
|
||||
|
||||
The address is often called the "Bodies Upon the Gears" speech,
|
||||
in reference to Savio's second mode of civil disobedience.
|
||||
description: |-
|
||||
Address delivered by Mario Savio 2 December 1964, at The University of California at Berkeley, prior to a sit-in protesting the university's ban on political activities on campus.
|
||||
The address is often called the "Bodies Upon the Gears" speech, in reference to Savio's second mode of civil disobedience.
|
||||
url: https://www.americanrhetoric.com/speeches/mariosaviosproulhallsitin.htm
|
||||
---
|
||||
# Sit-in Address on the Steps of Sproul Hall
|
||||
|
||||
@@ -7,13 +7,13 @@ daily: "[[2025-08-15]]"
|
||||
---
|
||||
# 2025-08-15 14:15:41
|
||||
|
||||
Exact date of quote unknown.
|
||||
Assumed date is that of commit 85d30c0,
|
||||
the first commit the quote appeared
|
||||
in its previous location [[feeders-takeoff]],
|
||||
formerly "feeders.md".
|
||||
|
||||
> [!cite] [[joel-jansen]], in reference to Omni Hotels Raleigh (pp.)
|
||||
> [!cite] [[joel-jansen]], in reference to Omni Hotels Raleigh (pp.)[^1]
|
||||
> It is acceptable to use typicals for identical feeders
|
||||
> (i.e. meter centers fed from bus plugs)
|
||||
> so long as the typical is in `Area` = "01 - Feeders/Risers ...".
|
||||
|
||||
[^1]: Exact date of quote unknown.
|
||||
Assumed date is that of commit 85d30c0,
|
||||
the first commit the quote appeared
|
||||
in its previous location [[feeders-takeoff]],
|
||||
formerly "feeders.md".
|
||||
@@ -9,7 +9,7 @@ daily: "[[2026-05-14]]"
|
||||
|
||||
## 303 Mariposa Residence Pre-takeoff Confirmation Email Review
|
||||
|
||||
Consultation with [[josh-ford|Josh]]
|
||||
Consultation with [[josh-ford|Josh Ford]]
|
||||
regarding [[conest-pre-takeoff-confirmation]]
|
||||
for [[303-mariposa-residence]].
|
||||
|
||||
|
||||
@@ -7,6 +7,7 @@ daily: "[[2026-05-20]]"
|
||||
# 2026-05-20 13:10:36
|
||||
|
||||
Direction from [[josh-ford]]
|
||||
relevant to [[electrical-takeoff]]
|
||||
on [[303-mariposa-residence]]
|
||||
with application elsewhere as well.
|
||||
|
||||
|
||||
@@ -0,0 +1,86 @@
|
||||
---
|
||||
id: 2026-06-03T14:05:39-0400
|
||||
title: 2026-06-03 14:05:39
|
||||
tags: []
|
||||
daily: "[[2026-06-03]]"
|
||||
---
|
||||
# 2026-06-03 14:05:39
|
||||
|
||||
## 303 Mariposa Residence Senior Review
|
||||
|
||||
[[conest-senior-review]] for [[303-mariposa-residence]].
|
||||
|
||||
### Selling Price
|
||||
|
||||
[[pdi-bid-estimating|Bid]]'s proposal base bid \$800,000
|
||||
|
||||
Joel messaged [[joshua-komis|Joshua Komis]] to clarify.
|
||||
|
||||
### Site Run Adders
|
||||
|
||||
previous direction to use 15ft adders for site runs
|
||||
It would be easier to assume 10ft for all cases
|
||||
Joel agreed
|
||||
|
||||
Mariposa's site runs didn't need adders at all
|
||||
since we added PVC80 stub-ups.
|
||||
|
||||
### Site Low Voltage Duct Bank
|
||||
|
||||
We assumed 2in conduit,
|
||||
but did not note this visibly.
|
||||
|
||||
### Solar Feeders
|
||||
|
||||
Solar [[feeders-takeoff]] used copper feeder size
|
||||
based on aluminum size shown in Solar set.
|
||||
No change necessary.
|
||||
|
||||
### Material Pricing
|
||||
|
||||
Joel requested pricing for the dimmable receptacles from [[pdi-procurement]].
|
||||
|
||||
### Mechanical Connections
|
||||
|
||||
B-1, B-2 feeders were parallel runs,
|
||||
but taken off as 2 counts each.
|
||||
|
||||
### Telecom
|
||||
|
||||
[[telecom-takeoff]] used Cat5e
|
||||
which we assumed, but did not note visibly.
|
||||
|
||||
### Fire Alarm
|
||||
|
||||
[[fire-alarm-takeoff]]
|
||||
|
||||
> PCM is supposed to keep Systems from
|
||||
|
||||
\$10,000 was my budget
|
||||
assuming a dozen or so interconnected smokes.
|
||||
|
||||
\$26,XXX was the quote
|
||||
for sprinkler monitoring only
|
||||
|
||||
### Closeout
|
||||
|
||||
#### Sales Tax
|
||||
|
||||
[[pdi-accubid-final-price]] 10.35%
|
||||
|
||||
#### Equipment
|
||||
|
||||
#### General Expenses
|
||||
|
||||
"Just the PM so we only need one trip"
|
||||
|
||||
Got rid of APM, Foreman
|
||||
|
||||
Approved Labor Plan created by Bid,
|
||||
approved by (Efren's title)
|
||||
|
||||
only 3mil or above
|
||||
|
||||
coordination study
|
||||
\$15,000 up to x
|
||||
\$25,000 above x
|
||||
+4
-67
@@ -3,77 +3,14 @@ id:
|
||||
aliases:
|
||||
- Me
|
||||
- Zane Meyers
|
||||
title: Me
|
||||
title: Zane Meyers
|
||||
tags:
|
||||
- topic/meta
|
||||
- type/encyclopedia
|
||||
- type/person
|
||||
---
|
||||
# Me
|
||||
# Zane Meyers
|
||||
|
||||
Born to [[steven-meyers]] and [[valerie-sargent]]
|
||||
**Zane Meyers** is the author of [[this-notebook]].
|
||||
He was born to [[steven-meyers]] and [[valerie-sargent]]
|
||||
on April 19, 2002.
|
||||
|
||||
## Considerations
|
||||
|
||||
### My Memory
|
||||
|
||||
I have a family history of dementia,
|
||||
and I am medically predisposed to transient forgetfulness.
|
||||
Several times in my life I have found months/years old notes in my handwriting
|
||||
that I could not recall writing, on subjects I could not recall having ever understood.
|
||||
|
||||
It deeply troubles me how much time I've wasted having the same ideas,
|
||||
working through the same problems, coming to the same conclusions.
|
||||
I am afraid that my memory has been deteriorating
|
||||
and will continue to until I'm intellectually useless well before my time.
|
||||
I'm not sure how much of this fear is real
|
||||
and how much is a subconscious ploy to justify not making the effort.
|
||||
|
||||
I project this insecurity on others strongly.
|
||||
I see the same signs in other people,
|
||||
and it reminds me of my own weakness.
|
||||
I get frustrated at others for not making efforts that I don't make myself.
|
||||
I don't use this notebook as often or as well as I should.
|
||||
|
||||
> [!note]
|
||||
> I give myself a hard time here,
|
||||
> but my "failure" to make lasting mental connections
|
||||
> is relative to my perception of my ability,
|
||||
> not to observation of others'.
|
||||
|
||||
### My Productivity
|
||||
|
||||
In as few words as possible,
|
||||
I would say I am "High Efficiency, Low Productivity".
|
||||
|
||||
I have several problematic productivity habits.
|
||||
|
||||
#### Motivation
|
||||
|
||||
My primary motivators are curiosity and stress.
|
||||
|
||||
I find it very easy and natural
|
||||
to work on projects for extended, uninterrupted periods
|
||||
when I am investigating a new problem,
|
||||
or a potential new way to solve a problem.
|
||||
|
||||
Because of this I often spend hours working on things
|
||||
that will not benefit me or anyone else.
|
||||
Even if they _could_ be useful, my motivation ends with my curiosity
|
||||
around 90% progress, where I'm able to visualize the end result.
|
||||
|
||||
I find it near impossible to do work I'm not curious of
|
||||
until my subconscious determines that we have exactly enough time
|
||||
to finish it before the deadline.
|
||||
|
||||
I think I spend much more time bored than my peers.
|
||||
Others with as much free time as me
|
||||
tend to spend it exercising or in other more reasonable activities.
|
||||
|
||||
### My Purpose
|
||||
|
||||
I want to be involved construction estimating for the rest of my working life.
|
||||
Current discourse on the subject is self-similar and sanitized.
|
||||
I'd like to be known as an innovator in [[heterodox-construction-estimating]],
|
||||
and for solving some of its open problems.
|
||||
|
||||
Reference in New Issue
Block a user