@@ -74,17 +74,17 @@ Routed up through the roof,
(optionally through a disconnect)
with flex to the equipment.
Equipment Racks: 20 disconnects per rack
Equipment Racks: Max 20 disconnects per rack
`DISTRIBUTIION`/`TRAPEZE RACK SUPPORT ...`/`...`
##### Trash Chute
Horizontal:
**Horizontal:**
* Check if shown on power drawings as mech connection
* If not, use 100ft length
Vertical (Riser):
**Vertical (Riser):**
* Takeoff: `COMMON ASSEMBLIES`/`MISC ASSEMBLIES`/`TRASH CHUTE RISER CIRCUIT...`
* Uncheck Link 'Enable Livecount'