vault backup: 2026-03-06 15:34:44

This commit is contained in:
2026-03-06 15:34:44 -05:00
parent 6ddaa363e8
commit db837f60ad
17 changed files with 233 additions and 62 deletions
+14 -6
View File
@@ -1,14 +1,22 @@
{ {
"collapse-filter": true, "collapse-filter": false,
"search": "path:/*.md", "search": "",
"showTags": false, "showTags": false,
"showAttachments": false, "showAttachments": false,
"hideUnresolved": false, "hideUnresolved": true,
"showOrphans": true, "showOrphans": true,
"collapse-color-groups": false, "collapse-color-groups": false,
"colorGroups": [], "colorGroups": [
{
"query": "tag:#occupational ",
"color": {
"a": 1,
"rgb": 14048348
}
}
],
"collapse-display": false, "collapse-display": false,
"showArrow": true, "showArrow": false,
"textFadeMultiplier": 0, "textFadeMultiplier": 0,
"nodeSizeMultiplier": 1, "nodeSizeMultiplier": 1,
"lineSizeMultiplier": 1, "lineSizeMultiplier": 1,
@@ -17,6 +25,6 @@
"repelStrength": 10, "repelStrength": 10,
"linkStrength": 1, "linkStrength": 1,
"linkDistance": 250, "linkDistance": 250,
"scale": 0.18454855383603447, "scale": 0.13163395511369996,
"close": false "close": false
} }
+14
View File
@@ -0,0 +1,14 @@
---
id:
aliases: []
title: 2026-W07
tags:
- authorship/original
- destiny/permanent
- status/draft
- type/periodic/weekly
dg-publish: true
date-created: 2026-03-06T10:45:40-05:00
yearly: "[[2026]]"
---
# 2026-W07
+16 -2
View File
@@ -23,16 +23,28 @@ Policy Number: ATH1143034
Flood Insurance: Flood Insurance:
Insurer: [National General](https://eservice.nationalgeneral.com/) Insurer: [National General](https://eservice.nationalgeneral.com/)
Policy Number: 0003457855 Policy Number: 0003457855]
## Contractors
* **HVAC:** Agape Air (semiannual service)
* **Plumbing:** Hafke Plumbing
* **Pest Control:** "Michael" (727) 410-2636 (semiannual service)
## Spaces ## Spaces
### General ### General
## TODO #### TODO
* [ ] draw floorplan * [ ] draw floorplan
### Exterior
#### Plans
* Gutters
#### Design Principles #### Design Principles
Keyword is _cozy_. Keyword is _cozy_.
@@ -76,6 +88,7 @@ Smaller by far than other bedrooms
* Fire pit * Fire pit
* Suspended shades * Suspended shades
* Eureka palms?
### Front Yard ### Front Yard
@@ -83,6 +96,7 @@ Smaller by far than other bedrooms
* Raised beds * Raised beds
* Vegetation along driveway * Vegetation along driveway
* Bahia/Bermuda grass?
## Needs ## Needs
+1 -1
View File
@@ -78,7 +78,7 @@ for consistency.
> Name = "Power Monitor" > Name = "Power Monitor"
See [[switchgear#SPD's/TVSS's]] See [[switchgear-takeoff#SPD's/TVSS's]]
### Switchboards ### Switchboards
+2 -1
View File
@@ -61,4 +61,5 @@ dg-publish: true
## Next Steps ## Next Steps
[[pdi-accubid-closeout]] 1. [[pdi-accubid-closeout]]
2. [[pdi-wbs]]
+19 -14
View File
@@ -23,13 +23,27 @@ one can closely approximate small dimensions,
even without the proper tools. even without the proper tools.
It is tempting to believe that heuristics are not ideal, It is tempting to believe that heuristics are not ideal,
that the most accurate method ought to be preferred. that the most accurate method ought to be preferred,
but the most accurate method is rarely practical.
%% Afterall, even using a ruler is a heuristic,
even using a ruler is a heuristic,
subject to the tool's tolerance subject to the tool's tolerance
and reliant on its proper use. and reliant on its proper use.
%%
The suitability of a model
is dependent on the purpose of the measurement.
To determine the width of dimensional lumber,
for example, to determine if a board is a 2x4 or a 2x6,
the rule of thumb is perfectly suitable,
and a micrometer would be silly.
> [!quote] George E. P. Box, British statistician
> All models are wrong, but some are useful.[^1]
[^1]: > [!quote] [[box-et-al_1987_empirical-model-building#The Use of Approximating Functions]]
> The fact that the polynomial is an approximation
> does not necessarily detract from its usefulness
> because all models are approximations.
> Essentially, all models are wrong, but some are useful.
## Realism vs. Instrumentalism ## Realism vs. Instrumentalism
@@ -47,12 +61,3 @@ is to _forecast as accurately as possible_.
Realism is noble, granted, Realism is noble, granted,
but instrumentalism is far more practical. but instrumentalism is far more practical.
> [!quote] George E. P. Box, British statistician
> All models are wrong, but some are useful.[^1]
[^1]: > [!quote] [[box_1987_empirical-model-building#The Use of Approximating Functions]]
> The fact that the polynomial is an approximation
> does not necessarily detract from its usefulness
> because all models are approximations.
> Essentially, all models are wrong, but some are useful.
+3 -3
View File
@@ -84,9 +84,9 @@ Copy-Item ".\1. Wizard Template - WBS\MEP Wizard v3.111.4 (7-21-2025)(Summary Ad
".\2. Blank Project WBS\2025\$projectName WBS $date.xlsm" ".\2. Blank Project WBS\2025\$projectName WBS $date.xlsm"
``` ```
%% > [!info]
TODO: Continue WBS sequence. > See [[pdi-project-start-notification#WBS]]
%% > for c
## Setup Accubid ## Setup Accubid
+1 -1
View File
@@ -40,7 +40,7 @@ dg-publish: true
| Code | Description | | Code | Description |
| ---- | -------------------- | | ---- | -------------------- |
| 200 | rough | | 200 | rough |
| 300 | trim | | 300 | trim |
| 400 | rough wire and cable | | 400 | rough wire and cable |
9. Some items will autofill when you fill out the "Accubid Extension Totals" table on the right 9. Some items will autofill when you fill out the "Accubid Extension Totals" table on the right
+16 -6
View File
@@ -12,7 +12,7 @@ dg-publish: true
--- ---
# Material Pricing # Material Pricing
## Info ## 1. SupplierLink
Use PDI and another vendor per the table below. Use PDI and another vendor per the table below.
PDI pricing takes precedence where available. PDI pricing takes precedence where available.
@@ -38,12 +38,22 @@ PDI pricing takes precedence where available.
| WA | QED INC - 12535 | | WA | QED INC - 12535 |
> [!important] > [!important]
> When updating, uncheck Update Supplier Code. > When updating, uncheck `Update Supplier Code`.
## Sequence ## 2. Corrections
### 1. Preparation ### Prefab Items
### 2. Takeoff "PREFAB BOX MOUNTING PLATE"
"PREFAB TELESCOPING BOX BRACKET"
### 3. Review Use **Trade Price**, delete **Supplier Name**
## 3. Adjustments
### Fire Alarm Labor
`F/A CABLE - LABOR ONLY`
`F/A DEVICE - LABOR ONLY`
Adjust labor to match PDI Systems quote.
+27
View File
@@ -0,0 +1,27 @@
---
id:
aliases: []
title: Project Start Notification
tags:
- authorship/other-for-now
- destiny/permanent
- occupational
- status/incomplete
- type/guide
dg-publish: true
---
# PDI WBS
## CBOM Accubid Export
In master Accubid file, group by `Bid Item`, `System`, `PDI SORT CODES`, `Area`, `Phase`.
Export ==**all tabs**== as ==**csv**== to ".\6. Notes & Emails\Accubid CBOM - {Job}"
## Import
Open Award Agreement WBS: "S:\Estimating\19 WBS Agreement GP\4. Award Agreement WBS\{yyyy}\Electrical\WBS - {Job} {Date} EVP Approved.xlsm"
"\\EgnyteDrive\Shared\Estimating\19 WBS Agreement GP\2. Blank Project WBS\{yyyy}\{Job} - WBS - {date}.xlsm"
`WBS Import/Export > Budget Import`
+6 -2
View File
@@ -15,7 +15,7 @@ dg-publish: true
## Process Uncertainty Resolution Steps ## Process Uncertainty Resolution Steps
1. **Check your [[#Writing Process Notes|notes]]** 1. **Check your [[#Writing Process Notes|notes]]**
2. **[[#Asking Process Questions|Ask]] a ==peer== whose answers you trust** 2. **[[#Asking Process Questions|Ask]] a peer whose answers you trust**
3. **Ask your immediate supervisor** 3. **Ask your immediate supervisor**
Only escalate if you are still uncertain. Only escalate if you are still uncertain.
@@ -24,7 +24,10 @@ Only escalate if you are still uncertain.
%% TODO: %% %% TODO: %%
### `TALK` [[note-taking]]
%%
### TALK
Taking notes has many benefits, Taking notes has many benefits,
many of which I would not list as such many of which I would not list as such
@@ -33,6 +36,7 @@ many of which I would not list as such
* **optics:** * **optics:**
note-takers always look more valuable than they would otherwise. note-takers always look more valuable than they would otherwise.
%%
### Citation ### Citation
+5
View File
@@ -59,3 +59,8 @@ to ask for a revision to a WBS
> [!aside] > [!aside]
> Sunset WBS: Engineer did not approve aluminum EMT > Sunset WBS: Engineer did not approve aluminum EMT
Bid receives bonuses based on _awarded GP_ ([[markup-vs-margin|margin]]),
thus they are incentivized to underestimate cost.
Ops receives bonuses based on _positive GP variance_,
thus they are incentivized to overestimate cost.
+47 -25
View File
@@ -19,19 +19,33 @@ yearly: "[[2026]]"
## Labor Plan ## Labor Plan
Anova Anova - The Pearl Multifamily Tower
### PDI SORT CODES [[pdi-labor-plan]]
| Code | Description | ### PDI Sort Codes
| ---- | ------------------------- |
| 100 | Slab Deck | Accubid item breakdown `PDI SORT CODES`
| 200 | Rough |
| 250 | Rough (Fire alarm trough) | | Code | Description |
| 300 | Trim | | ---- | -------------------------- |
| 400 | Wire and Cable | | 100 | Slab-Deck |
| 500 | Fixtures | | 200 | Rough |
| 600 | Distribution | | 250 | Rough (Fire alarm trough?) |
| 300 | Trim |
| 400 | Wire-Cable |
| 500 | Fixtures |
| 600 | Distribution |
### Labor Factor Adjustment
$$
\text{Desired Factor} = \text{Current Factor} \times \frac{\text{Desired Value}}{\text{Current Value}}
$$
$$
\text{New Labor Factor} = \text{Current Labor Factor} \times \frac{\text{Labor Plan Hours}}{\text{Accubid Hours}}
$$
### Garage Slab/Deck ### Garage Slab/Deck
@@ -46,19 +60,23 @@ Slab & Deck Labor
Calculate Factor and apply to column **Slab-Deck** Calculate Factor and apply to column **Slab-Deck**
| | | Labor Factor | |
| --------------- | | --------------- | -------------------------------- |
| BLDG - CORRIDOR | | BLDG - CORRIDOR | Slab-Deck, All Others |
| BLDG - BOH | | BLDG - BOH | Slab-Deck, All Others |
| UNITS | | GARAGE | Slab-Deck, All Others |
| SUBFEEDS | | UNITS | Slab-Deck, Rough, Trim, Fixtures |
| FIRE ALARM | | SUBFEEDS | Slab-Deck, All Others |
| AMENITY | | GEAR | Not adjusted |
| RETAIL | | FEEDERS | Not adjusted |
| OFFICE | | FIRE ALARM | Slab-Deck, All Others |
| KITCHEN | | AMENITY | Slab-Deck, All Others |
| FACADE | | RETAIL | Slab-Deck, All Others |
| GARAGE | | OFFICE | Slab-Deck, All Others |
| KITCHEN | Slab-Deck, All Others |
| FACADE | Slab-Deck, All Others |
| TEMP POWER | Not adjusted? |
| SITE | Not adjusted? |
### Garage, Other than 100: Slab/Deck ### Garage, Other than 100: Slab/Deck
@@ -66,7 +84,11 @@ Calculate Factor and apply to column **Slab-Deck**
Drill into "Garage" Drill into "Garage"
Total Labor Hrs of all codes other than 100. ```sql
SELECT SUM(Labor_Hrs)
FROM Extension
WHERE PDI_SORT_CODES != 100;
```
Garage = Total \ Garage = Total \
^ Garage (rough, trim, fix, f/a, ect..) \ ^ Garage (rough, trim, fix, f/a, ect..) \
+37
View File
@@ -0,0 +1,37 @@
---
id: 2026-03-06T09:57:02-05:00
aliases: []
title: 2026-03-06 09:57:02
tags:
- authorship/original
- destiny/permanent
- status/draft
- type/timestamped
dg-publish: true
date-created: 2026-03-06T09:57:02-05:00
daily: "[[2026-03-06]]"
weekly: "[[2026-W10]]"
monthly: "[[2026-03]]"
quarterly: "[[2026-Q1]]"
yearly: "[[2026]]"
---
# 2026-03-06 09:57:02
[[pdi-labor-plan]]
## Slab/Deck
$$
\begin{gather}
\text{Pour Sections Per Level} = \frac{\frac{\text{Gross Area}}{\text{Pour Section Area}}}{\text{Levels}} \\
\text{Days Per Level} = \lceil \text{Pour Sections Per Level} \rceil \times 4~\text{Days}
\end{gather}
$$
$$
\begin{gather}
\text{Pour Section Area} = [15000, 20000] \\
\text{Pour Sections} = \frac{\text{Gross Area}}{\text{Pour Section Area}}\\
\text{Days} = \lceil \text{Pour Sections} \rceil \times \{4,5\}~\text{Days}
\end{gather}
$$
+24
View File
@@ -0,0 +1,24 @@
---
id: 2026-03-06T12:20:32-05:00
aliases: []
title: 2026-03-06 12:20:32
tags:
- authorship/original
- destiny/permanent
- status/draft
- type/timestamped
dg-publish: true
date-created: 2026-03-06T12:20:32-05:00
daily: "[[2026-03-06]]"
weekly: "[[2026-W10]]"
monthly: "[[2026-03]]"
quarterly: "[[2026-Q1]]"
yearly: "[[2026]]"
---
# 2026-03-06 12:20:32
[sqlean](https://github.com/nalgeon/sqlean)
```sh
choco install sqlean sqlean-shell
```
+1 -1
View File
@@ -61,7 +61,7 @@ dg-publish: true
| <= 100A | `DIST PANELS & UNIT LOAD CENTERS`/`UNIT LOAD CENTERS - ...`/`... UNIT LOAD CENTER` | | <= 100A | `DIST PANELS & UNIT LOAD CENTERS`/`UNIT LOAD CENTERS - ...`/`... UNIT LOAD CENTER` |
| > 100A | `DIST PANELS & UNIT LOAD CENTERS`/`UNIT LOAD CENTERS - ...`/`... BREAKER PNL` | | > 100A | `DIST PANELS & UNIT LOAD CENTERS`/`UNIT LOAD CENTERS - ...`/`... BREAKER PNL` |
Include terminations per [[switchgear]]. Include terminations per [[switchgear-takeoff]].
### Fixtures ### Fixtures